Civil Engineering Civil Engineering Introduction
The so-called large civil. Refers to all and water, soil, culture-related infrastructure-related projects, construction and maintenance. At present, the civil work projects include: roads, water supply, drainage, flood control works and transport. The past, all non-military use of civilian projects, classified into this category, but with the increasingly vast engineering sciences, many of the original content belong to the scope of civil engineering have been a separate section. At present, from the narrow definition, is equivalent to the Civil Engineering civil engineering, or construction (or structural engineering) This small-scale.
Civil Engineering Introduction
Business training objectives: the professional training of various civil engineering disciplines to master the basic theory and basic knowledge in housing construction, underground construction (including mine construction), roads, tunnels, bridges, buildings, hydropower stations, ports and offshore structures and facilities, water supply drainage and ground treatment in areas such as planning, design, construction, management and research, engineering and technical personnel, senior.
Operational training requirements: The students mainly study engineering mechanics, geotechnical engineering, structural engineering, municipal engineering, water supply and drainage engineering and hydraulic engineering disciplines, basic theory and knowledge, by the engineering drawing, engineering, surveying, computer applications, professional test, structural design and construction practice areas such as basic training, and have engaged in construction, transportation works, water conservancy and hydropower engineering, port engineering, coastal engineering and water supply and drainage: the planning, design, construction, management and related research capacity.
Graduates should be given the following knowledge and ability to:
1. Natural Science has a solid foundation for a better foundation for the humanities and social sciences and foreign language integrated capacity;
2. Master of engineering mechanics, fluid mechanics, rock and soil mechanics, engineering geology and engineering drawing of the basic theory and basic knowledge;
3. Grasp the building materials, structural calculations, component design, ground treatment, water supply and drainage engineering and computer applications, basic knowledge, principles, methods and skills, has engaged in preliminary design of civil structural engineering and research capabilities;
4. Master construction machinery, electrical engineering, engineering, surveying, construction technology and construction organization, construction monitoring, project budget, as well as aspects of the tendering procedures for the basic knowledge and basic skills, has engaged in preliminary engineering, management and research capacity;
5. Familiar with the construction of various types of civil engineering principles, policies and regulations;
6. Understanding of civil engineering disciplines of the trunk and cutting-edge developments in theory;
7. Master the literature of information retrieval and the basic method of inquiry has a certain capacity for scientific research and practical work.
Major Courses:
Trunk disciplines: mechanical, civil engineering, water conservancy projects.
Main courses: engineering mechanics, fluid mechanics, rock mechanics with disabilities, the foundation and infrastructure, engineering geology, engineering, hydrology, engineering drawing, computer applications, construction materials, concrete structures, steel structures, engineering structures, water supply and drainage works, construction technology and管理.
The main practice teaching links include: engineering drawing, awareness training, surveying practices, engineering geology internship, professional practice or production practice, the structure of curriculum design, graduate thesis, such as design or general arrangement for about 40 weeks.
The main experiment: the experimental mechanics of materials, experimental materials, structural testing, soil testing.
Period of Study: Four years
Conferment of academic degrees: Bachelor of Engineering
Similar professional: Architecture, Construction Engineering Technology Civil Engineering and Town Planning Building Environment and Equipment Engineering, Civil Engineering to the drainage works to cross the river bridge and road works
建设工程目前建筑施工企业合同管理过程中存在哪些主要问题?
建设工程目前建筑施工企业合同管理过程中存在的主要问题: 1、合同签订阶段 (1)签订无效合同。
目前不少建筑施工为了眼前利益签订转包、违法分包、合同,因违反相关法律规定而无效;有的则是以合法形式掩盖非法目的,实质也是无效合同。
(2)加入wto后,有些建筑施工企业使用境外合同文本,由于国情不同、语言文字不同,加上翻译问题,这些合同文本中的不少条款存在疑问或争议,因而产生纠纷。
(3)发生歧义和误解的合同。
有的合同条款用词不达意不准确、不严谨,容易让人产生歧义和误解,导致合同难以履行或引起争议。
(4)不全面、不完整的合同。
合同条款挂一漏万,常见漏掉的往往是违约责任。
有些合同只讲好话,不讲丑话;只讲正面的,不讲反面的,不懂得签合同应当“先小人后君子”的诀窍,一旦发生违约,在合同中看不到违约如何处理的条款。
(5)无主合同或从合同不健全。
主合同是指能够独立存在的合同,如建筑工程总承包合同等;从合同是指以主合同的存在为前提才能成立的合同,如建筑工程分承包合同及保证合同、抵押合同等。
没有主合同的从合同是没有根据的合同,就象“无源之水、无本之木”;从合同不健全容也产生纠纷。
2、合同履约阶段 (1)过了诉讼时效的合同。
建筑行业被拖工程款的情况相当严重,有些拖欠没有诉诸法律,但当起诉时才发现已超过了两年的诉讼时效,无法挽回损失。
超过了诉讼时效等于放弃债权主张,等于权利人放弃了胜诉权。
(2)放弃行使权力的合同。
发包方不按合同约定支付工程进度款,建筑公司可以行使抗辩权停工,但却没有行使,怕单方面停工要承担违约责任,结果客观上造成了垫资施工,发包方的欠款数额愈来愈大,问题更难解决。
(3)轻视法律效力的证据(资料)。
有效的证据,应当是原件的、与事实有关的、有盖章和(或)签名的、有明确内容的、未超过期限的。
不具备法律效力的书面证据只是废纸一张。
(4)没有及时变更合同。
合同变更包括合同内容变更和合同主体的变更两种情形。
合同变更的目的是通过对原合同的修改,保障合同更好履行和一定目的的实现。
作为承包方的建筑施工企业,更重要是为了维护自己的合法权益。
关键在于变更要及时。
(5)没有及时发出的书函(会议纪要)。
在履约过程中及时地发出必要的书函,是合同动态管理的需要,是履约的一种手段,也是建筑企业自我保护的一种招数,可惜这一点往往遭到忽视,结果受到惩罚。
(6)没有办理签证确认。
履约过程中的签证是一种正常行为。
但有些建筑公司的现场管理人员对此并不重视,当发生纠纷时,也因无法举证而败诉。
工程项目管理
给你推荐一篇论文供参考:工程项目管理体制改革浅论长期以来,我国在计划经济体制下,工程建设采用建设单位(建设指挥部)、设计单位、施工单位、物资供应单位分工协作的体制,对国民经济的建设和发展作出了积极贡献。
随着经济全球化和科学技术的迅猛发展,现代工程建设项目的规模越来越大,工程内容越来越复杂,建设要求越来越高,速度越来越快,涉及的方面也越来越广。
传统的以工程建设单位(建设指挥部)为主体的工程项目管理体制日益显示出其各主要环节设计、施工、物资供应之间互相分割与脱节,工程建设周期长,工作效率不高,投资效益低下等缺点。
很长一段时间来,建设指挥部的官员或企业领导把工程项目管理视作行政管理或一般企业管理,用行政管理手段或一般企业管理的方法去管理项目,建设指挥部的存在使人们产生了一种误解,认为工程项目建设可以由建设指挥部这种方式来组织实施,而不需要有专业化的工程承包公司或管理公司。
事实上,已有大量实例和经验证明了建设指挥部的弊端:由于它是临时组建的,所以缺乏项目管理的程序和方法;由于它是非专业化的,所以缺乏项目管理的专门人才和经验;由于它是非专营的,项目建成后即撤销。
所以积累了经验或有过的教训也不能作为以后项目的借鉴。
从整个国家来看是年年“交学费”,造成建设项目的巨大浪费和损失,导致建设项目巨额的无效投资。
1 现代工程项目管理呼唤专业管理组织建设项目是一个系统工程,由于系统工程有其内在的规律,需要通过与之相适应的管理模式、管理程序、管理方法、管理技术去实现,也就是说,需要有专门从事工程项目管理的组织为之服务。
这种组织应该有与项目管理相应的功能、机构、程序、方法和技术;有相应的资质、人才、经验,能够为业主提供最优秀的项目管理服务,能够为业主创造最大限度的效益。
FIDIC(国际咨询工程师联合会的英文简称)推荐的项目管理模式基本上有两种类型:一种是以FIDIC《土木工程施工合同条件》为代表的模式,这种模式业主在委托完成设计的基础上,通过招标选择承包商,但承包商不负责设计。
另一种是以FIDIC《设计———建造与交钥匙工程合同条件》为代表的模式,这种模式业主在完成雇主要求或项目定义的基础上,通过招标选择总承包商,这种模式承包商负责设计、采购、施工管理全过程服务,这就是EPC总承包模式。
FIDIC合同条件是在总结近百年来工程承包合同经验的基础上,经多次修改出版的范本。
FIDIC合同条件反映了建设项目的共同规律;充分考虑和兼顾了业主、承包商、分承包商各方的责、权、利,力求不偏袒任何一方:它的有关条款以法律为依据,经过多年的实践和改进,按照国际工程承包的惯例进行编写,许多条款在工程承包界都有共同的理解。
它不仅在发达国家被普遍采用,也逐渐被发展中国家和地区接受和采用,尤其是被世界银行和亚洲开发银行等有权威性的金融机构接受。
因此,FIDIC合同条款具有科学、公正、严谨、规范化和国际化的特点。
2 有关项目管理体制改革的几点建议我国已经正式加人WTO。
党的十六届三中全会以已明确指出,深化经济体改革,放宽市场允许非公有资本进入基础设施,公用事业及其他行业和领域建设。
如何加大我国工程项目管理体制改革力度,尽快提高工程项目管理水平,早日同国际接轨,已成为当务之急并不可回避地摆放在了工程建设界面前。
为此提几点建议,供有关方面参考探讨。
(1)加大项目管理的宣传力度。
首先要宣传好项目管理的重要意义。
虽然项目管理的成功案例在我国已有近20年历史,但知道的人不多,加强宣传非常必要。
项目管理涉及到众多学科领域,随着适用范围的扩大,涉及的知识还在不断增多。
宣传好这方面的知识应该是当前推进项目管理的一项重要工作。
同时还要宣传好国内外项目管理的成功经验和典型案例。
要在宣传和学习过程中,更多地总结经验,探索规律,发现问题,推动项目管理更快更好地发展。
(2)扎扎实实地抓好培训工作。
现在除了在许多学校有关专业中增加项目管理课程,普及项目管理知识,抓紧培养后备专业人才外,还要根据中国经济发展实际,积极开展在职项目管理培训和继续教育。
当前的重点是针对有工作经验的项目管理人员进行培训,丰富他们的知识结构,提高他们的理论水平,帮助他们及时了解国外最新的发展动态。
在培训中,既要系统学习有关理论和知识,更要注重培训具体操作技能,使已有的项目管理人才队伍不断扩大规模,不断提高理论素质和工作水平。
(3)大力推广采用FIDIC项目管理模式和FIDIC合同条件。
FIDIC推荐的项目管理模式和FIDIC合同条件,我国已在一些大型工程和国际承包工程中采用并积累了一定经验,但采用还不够普遍,宣传面也不够广泛。
1999年,FIDIC出版了一套新的合同条件范本.对老版本从结构上、定义上和适用范围上作了较大改进,这对我国工程项目承包业将起积极作用。
应尽快组织制定以FIDIC合同条件为基础的适合我国社会主义市场经济条件下的合同范本,加大推广和宣传力度,改变工程项目管理体制改革滞后,一些业主单位和部门主管领导观...
转载请注明出处范文大全网 » 土木工程专业介绍(英文版)