范文一:人员岗位责任制
达依乡初级中学学生宿舍
管理人员岗位责任制
程 序 姓 名 职 称 日 期
编 制
审
核
批 准
福建省来宝建设工程有限责任公司
should be planted immediately after watering. Plant engineering can regulate the function of human life and the natural environment, which is the main part in Garden engineering, plays a beautiful and pleasant role. The object of the project is a plant, and construction of our professional and technical staff should be carefully studied, first planting season about plant materials, the different characteristics of the plant, the relationship between plants and soil, as well as the corresponding technical measures to prevent plant tree wilt and die. Plant engineering integrated construction project of a closeout nature, in the management of the entire project, including quality management, doing well at the same time, make sure the completion. The primary considerations in the construction are as follows: (1) be familiar with the design intent and design drawings, confirmed the construction site. (2) based on various conditions, preparation of project schedule planting project master plan. (3) the trees and use materials for quality management. (4) check the distribution plant operation results of construction technology management. In the actual construction, which operate according to the following specifications: ? point, line a, fixed line use tools: tools, portable tape, flowers, small stakes, stakes and ropes. Position b, the pegged after clear signs, trees draw the range of Lime Wire, stakes on the nails in a coil, clearly state the species, quantity, pit (point), and then use Visual methods to fix individual dots, dots indicate. C, the number of species and site and must conform to the design requirements of the drawing. D, tree location and configuration attention levels, avoid stiff, wish to edge away from the Center or from low high tilt canopy line, nearby trees not into mechanical geometry drawings or a straight line. E, Lone Tree point and line planting trees
(一) 代表企业实施施工项目管理,在管理中贯彻执行国家法律、行政法规、政策和标准;执行企业的各项管理制度,维护企业整体利益和经济权益。
(二) 签订和组织履行《项目管理目标责任书》。
(三) 主持组建项目经理部和制订项目的各项管理制度。
(四) 组织项目经理部编制项目管理实施规划。
(五) 对进入现场的生产要素进行优化配置和动态管理,推广和应用新技术、新工艺、新材料和新设备。
(六) 在被授权范围内沟通与承包人、协作单位、发包人和监理工程师的联系,协调和处理好各咱关系,及时解决项目中出现的各种问题。
(七) 加强成本管理,搞好经济核算,及时回收工程款,按企业的《施工项目管理制度》正确处理与国家、企业,分包单位以及职工之间的利益分配关系。
(八) 加强现场文明施工,及时发现和处理例外性事件。
(九) 工程竣工后及时组织验收,结算和分析总结,接受审计。
(十) 做好项目经理部的解体与善后工作。
(十一) 协助企业有关部门进行项目的检查,鉴定和评奖申报。
(十二) 参与企业进行的施工项目投标和签订施工合同。
(十三) 决定项目经理部的组织结构形式,选择聘任有关管理人员明确其职责,根据其任职情况定期考核、评分和奖惩,期满辞职。
(十四) 在企业财务制度允许的范围内,根据工程需要和计划安排,对资金投入和使用作出计划决策,对项目经理部的计酬方式、分配办法,在相关规定条件下作出决策。
(十五) 按照企业的规定选择使用企业和管理人员和作业队伍。
(十六) 根据《项目管理目标责任书》和《施工项目管理实施规划》组织,指挥项目经理部,进行工作部署,检查与调整。
(十七) 以企业法定代表人代理的身份处理、协调与施工项目有关的内部与外部关系。
责任人: 日 期:
should be planted immediately after watering. Plant engineering can regulate the function of human life and the natural environment, which is the main part in Garden engineering, plays a beautiful and pleasant role. The object of the project is a plant, and construction of our professional and technical staff should be carefully studied, first planting season about plant materials, the different characteristics of the plant, the relationship between plants and soil, as well as the corresponding technical measures to prevent plant tree wilt and die. Plant engineering integrated construction project of a closeout nature, in the management of the entire project, including quality management, doing well at the same time, make sure the completion. The primary considerations in the construction are as follows: (1) be familiar with the design intent and design drawings, confirmed the construction site. (2) based on various conditions, preparation of project schedule planting project master plan. (3) the trees and use materials for quality management. (4) check the distribution plant operation results of construction technology management. In the actual construction, which operate according to the following specifications: ? point, line a, fixed line use tools: tools, portable tape, flowers, small stakes, stakes and ropes. Position b, the pegged after clear signs, trees draw the range of Lime Wire, stakes on the nails in a coil, clearly state the species, quantity, pit (point), and then use Visual methods to fix individual dots, dots indicate. C, the number of species and site and must conform to the design requirements of the drawing. D, tree location and configuration attention levels, avoid stiff, wish to edge away from the Center or from low high tilt canopy line, nearby trees not into mechanical geometry drawings or a straight line. E, Lone Tree point and line planting trees
授权委托书
本人 (姓名)系 福建省来宝建设工程有限责任公司 (单位名称)的法定代表人,现委托 (姓名)为我方代理人。代理人根据授权,以我方名义签署、澄清、说明、补正、递交、撤回、修改 达依乡初级中学学生宿舍 (项目名称)项目经理,处理有关事宜等,其法律后果由我方承担。
委托期限: 至工程结束 。
代理人无转委托权。
委托人人: (盖单位章)
法定代表人: (签字)
委托代理人: (签字)
身份证号码:
年 月 日
委托代理人(项目经理)身份证:
should be planted immediately after watering. Plant engineering can regulate the function of human life and the natural environment, which is the main part in Garden engineering, plays a beautiful and pleasant role. The object of the project is a plant, and construction of our professional and technical staff should be carefully studied, first planting season about plant materials, the different characteristics of the plant, the relationship between plants and soil, as well as the corresponding technical measures to prevent plant tree wilt and die. Plant engineering integrated construction project of a closeout nature, in the management of the entire project, including quality management, doing well at the same time, make sure the completion. The primary considerations in the construction are as follows: (1) be familiar with the design intent and design drawings, confirmed the construction site. (2) based on various conditions, preparation of project schedule planting project master plan. (3) the trees and use materials for quality management. (4) check the distribution plant operation results of construction technology management. In the actual construction, which operate according to the following specifications: ? point, line a, fixed line use tools: tools, portable tape, flowers, small stakes, stakes and ropes. Position b, the pegged after clear signs, trees draw the range of Lime Wire, stakes on the nails in a coil, clearly state the species, quantity, pit (point), and then use Visual methods to fix individual dots, dots indicate. C, the number of species and site and must conform to the design requirements of the drawing. D, tree location and configuration attention levels, avoid stiff, wish to edge away from the Center or from low high tilt canopy line, nearby trees not into mechanical geometry drawings or a straight line. E, Lone Tree point and line planting trees
一 、对施工生产中的安全、质量、进度等一切技术问题负全面责任,并协助项目经理加强本工程的全面管理。
二 、组织项目部有关人员进行施工图自审及交底工作。
三、负责施工项目的技术、质量、计量的标化管理工作,组织学习和贯彻执行有关的技术标准、规范及质量检验标准。
四、负责与业主、设计单位洽谈施工项目的有关技术问题,并负责技
术资料的签证。
五、负责对重要分项工程和关键部位进行技术交底,负责技术协调、
技术难关处理,并督促落实整改措施。
六、负责审核竣工验收资料和组织绘制竣工图。
七、组织推广应用新技术、新工艺,新材料。参与调查处理质量事故
和安全事故。
八、自觉遵守公司财务制度,加强自身廉正建设,杜绝本工程的一切
不正之风和腐败现象。
九、完成项目经理交代的其他工作。
责任人:
日 期:
should be planted immediately after watering. Plant engineering can regulate the function of human life and the natural environment, which is the main part in Garden engineering, plays a beautiful and pleasant role. The object of the project is a plant, and construction of our professional and technical staff should be carefully studied, first planting season about plant materials, the different characteristics of the plant, the relationship between plants and soil, as well as the corresponding technical measures to prevent plant tree wilt and die. Plant engineering integrated construction project of a closeout nature, in the management of the entire project, including quality management, doing well at the same time, make sure the completion. The primary considerations in the construction are as follows: (1) be familiar with the design intent and design drawings, confirmed the construction site. (2) based on various conditions, preparation of project schedule planting project master plan. (3) the trees and use materials for quality management. (4) check the distribution plant operation results of construction technology management. In the actual construction, which operate according to the following specifications: ? point, line a, fixed line use tools: tools, portable tape, flowers, small stakes, stakes and ropes. Position b, the pegged after clear signs, trees draw the range of Lime Wire, stakes on the nails in a coil, clearly state the species, quantity, pit (point), and then use Visual methods to fix individual dots, dots indicate. C, the number of species and site and must conform to the design requirements of the drawing. D, tree location and configuration attention levels, avoid stiff, wish to edge away from the Center or from low high tilt canopy line, nearby trees not into mechanical geometry drawings or a straight line. E, Lone Tree point and line planting trees
一、 协助项目经理及技术负责人对本工程的现场管理,对施工现场出现的一些施工问题负主要责任;
二 、读通施工图,参加施工图自审和会审,学习掌握和贯彻工程施工中的各项规章、规范和标准,并严格按照施工图相关规范和施工组织设计的计划要求组织施工。
三、编制施工现场的进度计划,编制相应材料、周转材料,劳动力、机械设备使用计划,并报项目经理核准后实施。
四、 做好对作业班组的技术、质量、安全交底工作,并经常性的检验与督促。
五、认真做好施工日记的记录工作,及时搜集和整理本工程的技术资料和竣工验收资料。
六 、负责对施工现场存在的质量、安全、文明施工等方面的事故隐患和问题进行检验和整顿。
七 、自觉遵守公司财务制度,加强自身廉正建设,杜绝本工程的一切不正之风和腐败现象。
八、完成项目经理交代的其他工作。
责任人:
日 期:
should be planted immediately after watering. Plant engineering can regulate the function of human life and the natural environment, which is the main part in Garden engineering, plays a beautiful and pleasant role. The object of the project is a plant, and construction of our professional and technical staff should be carefully studied, first planting season about plant materials, the different characteristics of the plant, the relationship between plants and soil, as well as the corresponding technical measures to prevent plant tree wilt and die. Plant engineering integrated construction project of a closeout nature, in the management of the entire project, including quality management, doing well at the same time, make sure the completion. The primary considerations in the construction are as follows: (1) be familiar with the design intent and design drawings, confirmed the construction site. (2) based on various conditions, preparation of project schedule planting project master plan. (3) the trees and use materials for quality management. (4) check the distribution plant operation results of construction technology management. In the actual construction, which operate according to the following specifications: ? point, line a, fixed line use tools: tools, portable tape, flowers, small stakes, stakes and ropes. Position b, the pegged after clear signs, trees draw the range of Lime Wire, stakes on the nails in a coil, clearly state the species, quantity, pit (point), and then use Visual methods to fix individual dots, dots indicate. C, the number of species and site and must conform to the design requirements of the drawing. D, tree location and configuration attention levels, avoid stiff, wish to edge away from the Center or from low high tilt canopy line, nearby trees not into mechanical geometry drawings or a straight line. E, Lone Tree point and line planting trees
一 、协助项目经理及技术负责人对本工程施工质量管理工作,对施
工现场出现的质量问题负主要责任;
二 、以有关工程质量缉拿眼评定标准和验收规范为依据,对各项工程的工程质量进行检查监督。
三、负责技术资料的监督、检查及收集,做到技术质量资料的完善与工程施工进度目标的完成。
四 、参加隐蔽工程验收和分项工程技术复核工作,检查评定分项工程质量等级,及时办理有关质量检查记录手续。
五、检查督促质量整改的落实情况,参加工程质量事故的调查分析工
作,提出处理意见和防范措施。
六、严格遵守公司财务制度,加强自身廉正建设,杜绝本工程的一切
不正之风和腐败现象。
七、完成项目经理交代的其他工作。
责任人:
日 期:
should be planted immediately after watering. Plant engineering can regulate the function of human life and the natural environment, which is the main part in Garden engineering, plays a beautiful and pleasant role. The object of the project is a plant, and construction of our professional and technical staff should be carefully studied, first planting season about plant materials, the different characteristics of the plant, the relationship between plants and soil, as well as the corresponding technical measures to prevent plant tree wilt and die. Plant engineering integrated construction project of a closeout nature, in the management of the entire project, including quality management, doing well at the same time, make sure the completion. The primary considerations in the construction are as follows: (1) be familiar with the design intent and design drawings, confirmed the construction site. (2) based on various conditions, preparation of project schedule planting project master plan. (3) the trees and use materials for quality management. (4) check the distribution plant operation results of construction technology management. In the actual construction, which operate according to the following specifications: ? point, line a, fixed line use tools: tools, portable tape, flowers, small stakes, stakes and ropes. Position b, the pegged after clear signs, trees draw the range of Lime Wire, stakes on the nails in a coil, clearly state the species, quantity, pit (point), and then use Visual methods to fix individual dots, dots indicate. C, the number of species and site and must conform to the design requirements of the drawing. D, tree location and configuration attention levels, avoid stiff, wish to edge away from the Center or from low high tilt canopy line, nearby trees not into mechanical geometry drawings or a straight line. E, Lone Tree point and line planting trees
一 、协助项目经理及技术负责人对本工程的安全管理,对施工现场出现
的安全问题负主要责任;
二、贯彻执行国家地方有关主管部门关于安全的方针政策、规范、制
度的规定,坚持“安全第一,预防为主”的方针;
三、认真检查督促施工现场的安全生产的劳动保护及各项安全规定的
落实,
四、参加施工方案中安全生产技术措施的条款拟定工作,检查督促条
款的实施,负责安全措施标识的管理和使用,及时记录好安全台帐。
五、 负责本工程的常规安全检查活动,并做好检查记录,协助落实
奖惩措施,对违章现象进行制止,对一般事故做出处理和记录。
六、 对进入施工现场的新工人进行安全教育及日常生产的安全教育
工作。
七、参加对工伤事故的调查,分析处理总结、上报等工作。
八、自觉遵守公司财务制度,加强自身廉正建设,杜绝本工程的一切
不正之风和腐败现象。
九、完成项目经理交代的其他工作。
责任人:
日 期:
should be planted immediately after watering. Plant engineering can regulate the function of human life and the natural environment, which is the main part in Garden engineering, plays a beautiful and pleasant role. The object of the project is a plant, and construction of our professional and technical staff should be carefully studied, first planting season about plant materials, the different characteristics of the plant, the relationship between plants and soil, as well as the corresponding technical measures to prevent plant tree wilt and die. Plant engineering integrated construction project of a closeout nature, in the management of the entire project, including quality management, doing well at the same time, make sure the completion. The primary considerations in the construction are as follows: (1) be familiar with the design intent and design drawings, confirmed the construction site. (2) based on various conditions, preparation of project schedule planting project master plan. (3) the trees and use materials for quality management. (4) check the distribution plant operation results of construction technology management. In the actual construction, which operate according to the following specifications: ? point, line a, fixed line use tools: tools, portable tape, flowers, small stakes, stakes and ropes. Position b, the pegged after clear signs, trees draw the range of Lime Wire, stakes on the nails in a coil, clearly state the species, quantity, pit (point), and then use Visual methods to fix individual dots, dots indicate. C, the number of species and site and must conform to the design requirements of the drawing. D, tree location and configuration attention levels, avoid stiff, wish to edge away from the Center or from low high tilt canopy line, nearby trees not into mechanical geometry drawings or a straight line. E, Lone Tree point and line planting trees
材料员岗位责任制
一、在项目经理领导下负责工程材料采购和收发工作。
二、掌握本工程材料总计划用量及施工进度计划,并编制相应的详细的
材料供应计划。
三、熟悉工程施工进度,了解材料市场供应及价格情况,按计划进行采购,并满足质量要求及施工进度要求。
四、掌握材料的性能、质量要求,按检验批提供合格证或质量保证书提供给技术员。杜绝无材料合格证或质量保证书的材料进场。
五、按照规定要求,凡需要进行复检的材料,必须按检验批进行复检试
验,复检试验报告及时提供给技术员。
六、掌握材料的库存情况及时调整材料供应计划。
七、对购进不符合要求的材料,杜绝使用在工程中,要会同有关单位和
人员协商处理解决。
八、掌握材料的库存情况及时调整材料供应计划。
九、掌握材料市场实际供应价格及投标预算报价,如材料供应价格?投标预算报价时 , 其价格需及时反馈信息给工程项目部,办理有关报批手续
后方可进货。
十、及时掌握现场的工程变更情况及时调整供料计划。
十一、做好材料采购、供应月报表。按材料管理规定及时把报表提供给
财务(材料)会计。
十二、监督材料的使用情况,对材料浪费、损坏情况应及时制 止,并
对有关人员提出处罚。
责任人:
日 期:
should be planted immediately after watering. Plant engineering can regulate the function of human life and the natural environment, which is the main part in Garden engineering, plays a beautiful and pleasant role. The object of the project is a plant, and construction of our professional and technical staff should be carefully studied, first planting season about plant materials, the different characteristics of the plant, the relationship between plants and soil, as well as the corresponding technical measures to prevent plant tree wilt and die. Plant engineering integrated construction project of a closeout nature, in the management of the entire project, including quality management, doing well at the same time, make sure the completion. The primary considerations in the construction are as follows: (1) be familiar with the design intent and design drawings, confirmed the construction site. (2) based on various conditions, preparation of project schedule planting project master plan. (3) the trees and use materials for quality management. (4) check the distribution plant operation results of construction technology management. In the actual construction, which operate according to the following specifications: ? point, line a, fixed line use tools: tools, portable tape, flowers, small stakes, stakes and ropes. Position b, the pegged after clear signs, trees draw the range of Lime Wire, stakes on the nails in a coil, clearly state the species, quantity, pit (point), and then use Visual methods to fix individual dots, dots indicate. C, the number of species and site and must conform to the design requirements of the drawing. D, tree location and configuration attention levels, avoid stiff, wish to edge away from the Center or from low high tilt canopy line, nearby trees not into mechanical geometry drawings or a straight line. E, Lone Tree point and line planting trees
(一) 在项目经理(施工员)的领导下,对所施工的检验批或分项
工程质量负有直接责任。
(二) 组织本班组工人严格按图施工,按操作规程和技术交底要求来
操作。
(三) 经常对班组工人进行“质量第一,精心操作”的思想教育,牢
固树立为下道工序着想的思想,严格把好第一道工序的操作质量关。
(四) 全面负责班组质量自检、互检和工序交接检工作,发挥兼质检
员作用,虚心接受施工员和质检员的检查和监督;对不合格的检验批或分项
工程主动返工重做,直至符合质量标准。
(五) 参与施工员和质检员组织的检验批或分项工程质量验收评定。
(六) 认真把好使用原材料、成品、半成品的质量关,对不合格材料
有权拒绝使用,并及时向项目经理汇报。
(七) 经常督促班组工人,严格掌握各种砼(砂浆)配合比,不得套用,
乱用配合比或随意改变比例操作,一定要确保砼(砂浆)强度。
(八) 对出现质量问题或质量事故应本着实事求是的精神向施工(或
质检员)反映,不得隐瞒不报。
(九) 在施工实践中不断总结好的经验,不断提高自身的技术素质,
并帮助班组成员不断提高操作技术水平。
责任人:
日 期:
should be planted immediately after watering. Plant engineering can regulate the function of human life and the natural environment, which is the main part in Garden engineering, plays a beautiful and pleasant role. The object of the project is a plant, and construction of our professional and technical staff should be carefully studied, first planting season about plant materials, the different characteristics of the plant, the relationship between plants and soil, as well as the corresponding technical measures to prevent plant tree wilt and die. Plant engineering integrated construction project of a closeout nature, in the management of the entire project, including quality management, doing well at the same time, make sure the completion. The primary considerations in the construction are as follows: (1) be familiar with the design intent and design drawings, confirmed the construction site. (2) based on various conditions, preparation of project schedule planting project master plan. (3) the trees and use materials for quality management. (4) check the distribution plant operation results of construction technology management. In the actual construction, which operate according to the following specifications: ? point, line a, fixed line use tools: tools, portable tape, flowers, small stakes, stakes and ropes. Position b, the pegged after clear signs, trees draw the range of Lime Wire, stakes on the nails in a coil, clearly state the species, quantity, pit (point), and then use Visual methods to fix individual dots, dots indicate. C, the number of species and site and must conform to the design requirements of the drawing. D, tree location and configuration attention levels, avoid stiff, wish to edge away from the Center or from low high tilt canopy line, nearby trees not into mechanical geometry drawings or a straight line. E, Lone Tree point and line planting trees
范文二:人员岗位责任制
人员岗位责任制
(一)负责人岗位职责
1、 认真贯彻执行党的方针政策和国家法律法规及规章制度,全面
负责本医疗机构的各项工作。
2、 制定各项工作计划并负责组织实施。
3、 负责搞好法律,业务学习,采取各种有效措施,不断提高卫生
技术人员业务素质和依法执业水平。
4、 加强诊疗各项工作的指导、督促和检查,不断提高服务质量。 5、 负责本医疗机构的财务、药品、物品的管理。
6、 负责本医疗机构的转诊、疫情报告、危重病人抢救及医疗差错
事故的上报等工作。
(二)医师岗位职责
1、严格按照有关卫生法律法规、规章、标准及技术操作规范开展执业活动。
2、遵守职业道德和规章制度,关心、爱护、尊重患者,保护患者隐私。
3、医师实施医疗、预防、保健措施,签署有关医学证明文件,须亲自诊查,调查,并按照规定及时填写医学文件。
4、使用经国家有关部门批准使用的药品、消毒药械和医疗器械。 5、努力钻研业务,不断学习医学新理论、新技术、提高医疗质量。 (三)护士岗位职责
1、认真执行各项规章制度和技术操作规程,严格“三查七对”制度,
防止差错事故。
2、协助医师做好诊疗接待工作,认真执行医嘱,做好护理工作记录。 3、经常观察候诊患者和输液患者的病情变化,发现异常情况及时通知医师进行处理。
4、认真做好消毒隔离工作,做好消毒工作记录,防止交叉感染。 5、认真学习护理基本知识和操作技能,不断提高护理技术水平。
范文三:岗位人员责任制
施工员、试验员、质检员、安全员、材料员、资料员、
测量员、计划员、劳资员、统计员、机械员岗位职责
十大人员岗位职责
一、资料员
1、工程开工前,列出项目所需的技术资料清单并备齐所需的有关表格,并下发给相应关部门和有关人员。
2、负责管理项目所有设计图纸、规范、标准及施工过程中的各种技术资料、工程档案。
3、负责所有资料及文件的发放,并按贯标文件的要求对文件进行有效控制。
4、协助有关部门和人员填写各种表格和资料。
5、对所有质量记录进行定期的收集和管理。
6、负责外来资料和文件的收文登记工作。
7、每月至少一次对所有工程资料、档案进行全面的收集、整理汇总工作,确保所有工程资料完整、查问方便。
8、参加每天的碰头会,并对会议内容进行完整记录。
二、材料员
1、在项目工程开工之前,要按照材料计划建立材料名称、规格材料计划成本台帐。
2、负责采购工程需用的材料、成品、半成品等,并组织到场。
3、负责办理入库材料的验收手续。
4、定期为成本会计提供现场周转材料增减情况,加快周转次数,减少资金占用率。
5、月底根据领料单、登记材料的收、发、存台账,并必须与施工统计的报表口径一致,不能以领代耗,更不能估进度作耗,以免造成成本不实。
6、按本期耗用数登记实际成本台账,并与计划成本 相对比,超计划用料及时找出原因,采取措施。
7、严格发料制度,工人领料时按工长提供计划发料,并且不定期的进入工地查看材料使用情况,杜绝浪费,对造成浪费的班组将进行罚款。
8、采购材料时,应坚持“货比三家”的原则。
三、预算员
1、根据每月完成工程进度,负责向甲方和公司报送当月完成产值报量。
2、根据技术部提供的每月进度计划计算工作量计划,负责向公司和甲方报送工程量产值计
划报表;
3、负责对本工程的人工费的工程量及定额工日进行测算、审核,建立人工费台账,在工程完工时对人工费进行汇总分析;
4、负责技术部门移交的经济签证(包括现场签证、技术方案签证)、设计变更等资料进行整理、分析,确认造价后移交存档;
5、负责项目部的合同管理,参与项目劳务合同、材料采购合同的制订;
6、全过程地对施工过程中各种施工方案、技术方案进行经济对比分析,为项目决策提供参考;
7、在成本会计员的协助下,动态地提供每个月的项目成本状况,组织每月及阶段性的成本分析会,并及时、准确地提供成本分析报告和改进、整改措施;
8、负责对甲方的单项、单位工程的预结算,对量工作,及时提交材料汇总表,分部分项材料汇总表,并进行经济技术分析。
四、试验员
一、按照设计要求,做混凝土、砂浆、灰土等配合比通知单,并将配合比做框、制表挂于混凝土和砂浆搅拌机旁边。
二、随时监督配合比的正确使用。
三、认真做好各种材料的取样、试验、检验和复试工作及报告。
四、收集、整理好各种进场材料的出厂合格证及材料质量检验单。
五、按规定认真做好混凝土、砂浆试块。
六、管理好标养室,做好试压工作,填写好混凝土、砂浆(成型日期、试压日期)表格。
七、做好混凝土、砂浆过磅计量台帐。
八、配合好项目经理及项目部的工作
五、质检员
1、对项目的质量管理工作负责。
2、 参与技术方案、交底、措施制定的初部编制。
3、 参与质量通病纠正预防措施的初步编制。
4、 按有关规范及交底情况组织检查、监督现场施工质量,及时掌握工程质量动态、核定分项工程质量等级,杜绝不合格品进入下道工序。并对该项资料进行保存。
5、 参与进行样板施工,确保样板施工达到质量要求。
6、 组织项目质量验收工作,参加不合格品的评审并对其处置结果进行跟踪检查。
7、 组织收集分项工程质量检查评定记录,确保工程技术资料与工程进度同步。
8、 对每天质量情况进行记录,报告并跟踪督促作业队整改,参与质量的过程控制。参加隐蔽工程、分项工程的验收工作及预留、预埋洞口标高的检查,模板几何尺寸、轴线标高的复核并做好记录。
9、 参加局、公司组织的质量大检查及项目质量事故处理分析,督促和检查质量问题的整改。
10、 责质量目标及质量责任制的考核工作。
11、 写好质量日志,每日对质安部的质量记录进行检查;运用统计技术,对可能产生不合格品的原因进行统计分析,为编制纠正预防措施提供依据,并进行跟踪检查及记录。
12、 组织召开现场分析会及质量专题会。
13、 组织开展质量竞赛及奖罚活动。
14、 负责现场人员质量管理培训、宣传教育,提高项目人员的质量意识。
15、 积极配合其它岗位的工作。
16、 及时完成领导交办的其它工作。
六、安全员
1、参与施工组织设计中有关安全措施的编制,并熟悉与工程有关的安全规范和法规,熟悉施工工艺流程。
2、负责建立健全本工程有关安全管理制度。
3、有计划地进行安全生产方针、政策、法规和安全技术知识安全技术操作规程的教育。
4、检查各级安全技术交底情况。
5、对施工现场每天进行安全巡回检查,并作好记录。
6、检查班组安全生产活动情况。
7、参与并督促有关施工设备及安全防护措施的验收工作。
8、参与日常的安全检查。
9、参与项目每星期的安全生产检查,并填写安全生产检查表。
10、检查落实各种安全生产合同的鉴订工作。
11、积极配合上级主管部门对项目的安全生产大检查,并就检查出的问题进行定人、定时间、定措施整改。
12、负责安全生产资料的编制、收集、整理、归档工作。
13、参加每天的碰头会,就当天有关安全生产情况进行通报。
七、施工员
1、参与施工方案的编制,并编制具体的施工计划,报项目经理综合评定后实施。
2、熟悉并掌握设计图纸、施工规范、规程、质量标准和施工工艺。向班组进行技术交底,监督指导实际操作。
3、按施工方案、技术要求和施工组织设计组织施工。
4、合理使用劳动力,掌握工作中的质量动态情况,组织操作人员进行质量的自检、互检。
5、检查班组的施工质量,制止违反施工程序和规范的行为。
6、参加上级组织的质量检查评定工作,并办理签证手续。
7、对因施工质量造成的损失,要及时调查,分析原因,评估损失,制订纠正措施,经项目工程师批准后及时处理。
8、负责现场文明施工及安全交底。
9、根据工程实际施工进度情况,向材料部门提供材料需用量计划。
9、参加安全事故调查和处理,做好工伤(交通)事故的统计、分析和上报工作,会同有关人员提出防止事故的措施,并监督检查实施。
10、会同有关人员做好防腐、防霉、防暑降温和女工保护工作,监督有关部门及时发放和合理使用俱保护用品,保健食品和清凉饮料。
11、搞好工伤月报,建立工伤台帐,做好安全检查的原始记录和安全资料档案的管理。
12、做好每日巡回安全记录。
八、机械员
1、负责机械组固、建档、报废、报损等相关手续的办理。
2、负责机械报表的汇总统计。
3、掌握项目经理部机械分布动态情况。
4、进行每月机械完好率、利用率的统计分析。
5、参与机械设备的检查与评比。
6、参与机械事故的调查、分析与处理。
7、负责机械设备台帐、油水更换台帐、维修台帐的建立和更新。
8、掌握和监督设备定人定机、持证上岗情况,外租机械进退场验收。负责工区之间(或工区内)机械设备的协调及核算。
9、组织机械保养计划下达、监督保养实施和维修的落实。
10、进行机械使用和维修成本的统计与分析。
11、参与法律法规及其他要求的识别、评价和环境因素、危险源的辨识。根据自己的工作流程,提出自己的意见和建议,并根据分工对评价出的重要环境因素、不可接受的风险制定目标、指标、管理方案
九、劳资员
1、按规定办理职工的调配、考核、任免和有关政治审查、体检工作,会同人事部门做好职工考核,承办职工调出、调入手续;
2、 负责掌握全中心机构、编制人员配备情况,及时为领导提供决策资料和合理化建议;
3、 负责办理职员和工勤人员的聘用;
4、 负责承办专业技术人员的专业技术的职称认定、评聘工作;
5、 负责组织职员、专业技术人员的继续教育学习;负责组织工人技术等级岗位晋升、定级的考核;
6、 责职工人事档案的管理,统计、上报人事劳资有关报表;
7、 负责全中心工作人员的工资晋升、调标、滚动及人员提职等工资核定工作;
8、 负责承办工作人员内退、退休的审批,负责机关离退休人员的服务管理工作;
9、 负责承办工作人员的医疗、养老、失业社会保险等工作;
10、 完成领导交办的其他任务。
十、计划员
1、生产计划的规定
2、产能的调整
3、生产进度的控制
4、生产计划及生产进度的适当调整
5、物料进度的督促
6、统计数据的分析
7、部门间有关事务的沟通与协调
十一、统计员
1. 认真执行《统计法》及有关法规,严格依法办事。
2.积极参与制定统计工作制度,指导街办企业搞好统计工作。
3.审查所属单位的统计报表,搞好汇总上报工作。
4.负责统计资料的整理保管工作。
5.完成领导交办的其它任务。
范文四:档案人员岗位责任制
档 案 人 员 岗 位 责 任 制
一、?????????? 努力学习马列主义、**思想、**理论、**关于“三个代表”重要思想,增强档案意识,热爱档案事业,努力完成任务。
二、?????????? 认真学习,宣传、贯彻执行《档案法》和档案管理的各项规定,结合本机关实际,创造性开展工作,努力提高档案管理水平,配合草拟各种档案管理的规章制度。
三、?????????? 协助督促职能部门严格遵照公文处理办法处理文书材料,做好各类档案材料的搜集,整理、立卷、归档工作。
四、?????????? 认真做好档案的保管、保护工作,维护档案的安全与完整。
五、?????????? 做好档案统计工作,按时完成统计任务。做好查(借)阅、查库、利用效果等的登记、统计。
六、?????????? 开发档案资源,积极做好档案利用工作,为党委、政府工作服务,为领导决策服务。
七、?????????? 按规定做好到期档案的鉴定、销毁、移交进馆任务。努力完成领导交办的其他任务。
范文五:销售人员岗位责任制
销售人员岗位责任制
一、 销售人员的工作内容及目的
负责将公司的产品,推倒市场中去,销售给使用单位,获得效益,同时进一步开拓产品市场,提高市场占有率,树立更好的企业形象,提高企业知名度,随时获取各种信息,协助公司调整企业的经营策略,使企业在市场中稳步发展。
二、 销售人员的工作程序
1. 学习掌握公司产品的特点,安装工艺,市场状况、价格价位。
2. 学习掌握与销售有关的营销知识,法律知识。
3. 对应每一个客户了解其单位定货计划,定货主要负责人,联
系方式以及我们的竞争对手,客户对我公司与产品的印象,与我公司定货的所有前提,做到有目的的进行销售活动。
4. 随时或定时与主管领导取得联系,处理业务开展中遇到的难
题,做到妥善处理,不可盲从。
5. 依照公司的要求在符合经济法的基础上,签定合同,做到明
确,严谨可行。
6. 在供货过程中,随时与客户与公司取得联系处理好供货过程
中出现的问题,做好对客户的售中服务。
7. 依据所签合同约定按时按量收回应收帐款。
8. 合同供货完毕后及时与工地核对帐目,做到手续齐全,帐目
清楚,并依合同约定收回余款。
9. 处理好售前,售中,售后对客户的承诺,有的放矢,不说空
话,从而提高自身的服务水平。
10. 合同执行完毕后,做好对客户的回访,争取客户意见,建议,
从而更好提高我们综合服务质量。
三、 销售人员工作标准
1. 专业知识在经定向培训后,达到公司要求,经考核通过后,
方可上岗工作。
2. 每天或定期向公司领导汇报当天或近期的工作情况。
3. 用文字形式上报主管领导,有意向定货客户的准确情况(如:
客户名称,工程名称,地址,定货人,联系方式,竞争对象的情况等)做好记录以备存档,和做到有针对性的进行公关策略制定掌握第一手材料,由主管领导酌情处理,尽量避免失误。
4. 合同签定要使用公司的专用合同书,或工商部门监制的标准
合同文本。合同签定时要由公司领导负责签字盖章,审核,方可执行,以免错签合同,避免合同纠纷。
5. 供货过程出现变更(如:增加、减少、退换等),要及时控
制专用明细表,递交合同执行人以便安排供货事宜,保证变更后供货时间。
6. 随时与合同执行人取得联系,按时、按量收回合同条款中约
定的付款,不能如期收回的用书面形式叙述原因上报主管领导,酌情处理,无处理意见时,供货暂停。
7. 合同一经供货完毕,须及时与用户约定对帐,对帐时要由合
同执行人与销售人员共同办理,销售人员不可单独收款,对帐,以免造成帐款不符,票据错误,避免因此造成损失,加大工作量。
8. 在销售过程中,对客户提出要求在权限范围之内要大胆做
主,及时办理,权限范围之外的要汇报领导后取得解决意见,再行办理,绝对不可因问题难以处理而置之不顾,弃之不管。
9. 销售人员在外的价格,以公司统一下发价格表为准,允许下
降上调5%不得颤自变更销售人员有权安排提成工资以外的2%的费用,用于对客户的服务费用。(计算工资的销售额)
四、 销售人员的任用方式和各部任用期的销售任务
1. 试用期:新招销售人员包括定向培训,试用期6个月,签定
临时试用劳动合同,试用期内销售额不得低于10万元。
2. 任用期:试用期满有销售业绩,完成销售额,公司聘为正式
销售人员,签定正式任用劳务合同。其销售任务为年度内60万元,收款率不低于80%。
五、 销售人员的工资标准。
1. 使用期内公司按月支付每人生活费500元,支付期6个月;
按月报销月票。有销售业绩后,按销售提成比例计工资。
2. 任用期:执行提成工资制度和年终奖金制,销售提成比例标
准为:
按实际销售收入额计算,柔性接口管件 8 %,承口管件 5 %,未执行完毕的合同收款,按已收贷款金额入相对提成比例的50 %,做为工资发放。差额部分在合同执行完毕后补齐当月发放。(每份合同独立计算提成工资)
3. 销售价格低于合同价格标准,降低部分在提成比例中扣除特
殊情况,可个别处理。
六、 销售人员的奖惩办法
1. 试用期内达不到要求的,停发生活费,但可留职,留职期间
有销售业绩的,公司酌情补发部分生活费。
2. 正式任用期内,销售任务,收款率有一项不能完成的,提成
比例下浮1%,超额完成一项,提成比例上调 1%。收款比例依全年总收款计算。奖惩年终兑现,在工资总体现出来。
3. 违反工作程序,工作标准,根据具体情节酌情给予100-500
元罚款,在当月工资中扣除,情节严重的给予除名。
4. 不服从领导对临时安排的工作,消极对待,处以100元以
上罚款或除名。
5. 违反公司统一制度,根椐公司相关其它文件,给予处罚。
6. 销售人员对公司的规章制度文件,技术资料,经营状况,新
产品的开发有保密义务,如有违犯,每次罚款500-1000元,情节严重的予以除名。
7. 销售人员一经公司录用,公司配给BP机一部,以供使用,
半途退出或被单位除名,必须退回或照价在工资中扣除。
8. 统一下发价格表中的承口直管,允许下浮2 %。
七、 公司销售主管领导的责,权关系
公司的销售工作全部由张瑞琦负责处理,任何与销售工作有关的事务均要有张瑞琦的书面材料为准。任何人不得越权管理,遇有销售部不能独立解决的问题,上报公司领导,商定处理。
1. 销售主管的权利:
销售主管负责所有定货计划的审核,合同的签定,业务
经费支出的确定,销售策略,施工图的放样,定货计划的制定,客户情况的分析,备案销售部日常工作的安排,外购产品定价,定厂,销售人员的培训,销售收入,确保生产及经
营的正常用费,监督完成收款率。监督销售人员的日常工作。
销售主管因工作失误,造成直接经济损失,由一人全部承担。销售部销售人员的工作失误处理,由销售主管或合同公司领导解决。
2. 合同执行人:负责签定的供货安排与生产部门的接洽,应收
款的计算,结算表的制定,定货价格的审核与销售人员的外出兑帐,收款。协助销售主管日常工作及销售 部的日常事务。
3. 以上两个职务人员,均由公司总经理的领导,监督。