范文一:装表接电技能培训
装表接电技能培训
装表接电工是电力企业的重要工种之一,担负着检查验收内线工程,安装、调换电能计量装置及熔断器并接电的重要任务,接电是供电企业将申请用电者的受电装置接入供电网的行为。接电后,客户合上自己的开关,即可开始用电,一般安装电能计量装置与接电同时进行,故又称装表接电。
装表接电工作的管理范围
用户申请的用电容量被批准后,设计部门即可按照用电性质,负荷特点进行内、外线设计,其设计图纸通过登记窗口转到供电营业所进行各项技术审查,审查合格后组织施工,工程竣工之后,持审查合格过的施工图纸到登记窗口报告,请求验收送电。内、外线检查人员持登记书竣工图纸到施工现场进行验收,对施工质量标准进行技术检查。经验收合格后,方可装表接。由此可见,凡属于高、低压用电户装设的所有计费计量装置,无论是单相的还是三相的,也不论是高压的还是低压的,从一次引进线到计量装置的所有二次回路,均属于装表接电工作的管理范围
装表接电工的具体职责 1(负责新装、增装、改装及临时用电计量装置的设计、图纸审核、检查验收。
2(负责互感器和电能表的事故更换及现场检查。 3(负责分户的计量装表工作。
characteristics and duration control requires adequate labour, and establish a reward system, emulation, good team work, life and other logistical support, maintain strong work ethic and sense of responsibility, ensure the successful completion of tasks. To strictly of quality control, ensure once survived, guarantee plans of implementation increased "four technology" of application, improve construction quality efficiency life water used PP-R pipeline, hot melt connection, this a pipe of using, in is big degree Shang overcome has past traditional pipeline exists as using life short, and insulation performance poor, and installation technology requirements high, and installation cost high of problem, has resistance corrosion, and resistance small, and heat, and resistance pressure, and life long, and insulation energy-saving, and weight light, and installation reliable simple, advantages. Due to ease of installation, reduced labour intensity at the same time, improves the speed of construction. Due to installation and reliable, reducing secondary construction workload, reducing costs while ensuring construction according to schedule. Construction of the first section of the programme description according to the construction contract for the construction of electrical engineering, our scope for low voltage distribution and all future projects, public staircases of lighting engineering; the contract scope with embedded structure reserved for all electrical engineering work and weak power distribution box for the installation. Construction process construction Qian prepared ? tie civil pre buried, and reserved ? wall Shang distribution tube and
4(负责计量装置的定期轮换工作。
5(负责电能表和互感器的管理,填报分管月报 6(定期做下一周期的电能表和互感器的需用计划。 7(负责向库房领取电能表、退还电能表和互感器,并健全必要的领、退手续。
8(定期核对计量装置的接线、倍率、回转情况。 9(分析判断电能计量装置故障和错误接线。 10(排除电能计量装置异常和故障。
11(违约用电和窃电查处。
12(对用电户内线工程验收和接电。
培训目标
1(通过本环节的培训让装表接电方向学员掌握电能计量装置接线实训常用工具仪表的正确使用。
2(通过本环节的培训让装表接电方向学员了解常用计量装置的结构及工作原理。
3(通过本环节的培训让装表接电方向学员掌握电能计量装置的配置及安装工艺,及电能计量装置的现场校验。 4(通过本环节的培训让装表接电方向学员进一步掌握各种电能计量装置的接线方法。从而培养学员理论联系实际,提高综合知识和分析问题、解决问题的能力。
一、常用工具的使用
1.验电器
characteristics and duration control requires adequate labour, and establish a reward system, emulation, good team work, life and other logistical support, maintain strong work ethic and sense of responsibility, ensure the successful completion of tasks. To strictly of quality control, ensure once survived, guarantee plans of implementation increased "four technology" of application, improve construction quality efficiency life water used PP-R pipeline, hot melt connection, this a pipe of using, in is big degree Shang overcome has past traditional pipeline exists as using life short, and insulation performance poor, and installation technology requirements high, and installation cost high of problem, has resistance corrosion, and resistance small, and heat, and resistance pressure, and life long, and insulation energy-saving, and weight light, and installation reliable simple, advantages. Due to ease of installation, reduced labour intensity at the same time, improves the speed of construction. Due to installation and reliable, reducing secondary construction workload, reducing costs while ensuring construction according to schedule. Construction of the first section of the programme description according to the construction contract for the construction of electrical engineering, our scope for low voltage distribution and all future projects, public staircases of lighting engineering; the contract scope with embedded structure reserved for all electrical engineering work and weak power distribution box for the installation. Construction process construction Qian prepared ? tie civil pre buried, and reserved ? wall Shang distribution tube and
验电器也称验电笔和电笔,是用来测试导线,用 电器具及电气装置是否带电的工具,分为高压和低 压两种 。
2.电工刀
电工刀是一种常用的切削工具,用来削电线线头, 削制木枕。
3.螺丝刀
螺丝刀也称启子,它是用来旋紧或起松螺丝的工具 4.钢丝钳
钢丝钳是一种钳夹和剪切电工器材的常用工具, 由钳头和钳柄两部分组成,钳头由钳口、齿口、刀 口、铡口构成。
5.剥线钳
剥线钳是一种专门用于剥去导线绝缘外层的常 用工具,常用于直径4平方毫米以下的导线。 6.万用电表
1(用途
万用电表是一种多用途的携带式仪表,一般可以测量交流电压,电流,直流电压电流,电阻,电感,电容等。 2(使用注意事项
(1)万用电表比较脆弱,使用时应小心谨慎,安放平稳。 (2)使用前要先看一下表指针是否指在零位。如不指零位,characteristics and duration control requires adequate labour, and establish a reward system, emulation, good team work, life and other logistical support, maintain strong work ethic and sense of responsibility, ensure the successful completion of tasks. To strictly of quality control, ensure once survived, guarantee plans of implementation increased "four technology" of application, improve construction quality efficiency life water used PP-R pipeline, hot melt connection, this a pipe of using, in is big degree Shang overcome has past traditional pipeline exists as using life short, and insulation performance poor, and installation technology requirements high, and installation cost high of problem, has resistance corrosion, and resistance small, and heat, and resistance pressure, and life long, and insulation energy-saving, and weight light, and installation reliable simple, advantages. Due to ease of installation, reduced labour intensity at the same time, improves the speed of construction. Due to installation and reliable, reducing secondary construction workload, reducing costs while ensuring construction according to schedule. Construction of the first section of the programme description according to the construction contract for the construction of electrical engineering, our scope for low voltage distribution and all future projects, public staircases of lighting engineering; the contract scope with embedded structure reserved for all electrical engineering work and weak power distribution box for the installation. Construction process construction Qian prepared ? tie civil pre buried, and reserved ? wall Shang distribution tube and
应先转动调零旋钮,把指针调到零位,如要测量电阻,应先把两表笔短接在一起,然后再旋转电阻调零钮,使指针指零。 (3)万用电表后盖内装有干电池,供测量电阻时的测量电源。测量电阻以后,应赶快把旋钮转到电压的位置,否则,易造成短路而耗费电池。
(4)使用万用电表前,特别要注意选择旋钮在什么档位上,是否是测量所要用的,切不可弄错档。当旋钮指在电流档时,切不可把电表接在电源的两端去测电压,若这样做,会很快烧坏仪表。
7.相序表
最早的相序表内部结构类似三相交流电动机,有三相交流绕组,和非常轻的转子,可以在很小的力矩下旋转,而三相交流绕组的工作电压范围很宽从几十伏到五百伏都可工作。测试时,依转子的旋转方向确定相序。
也有通过阻容移相电路,使不同相序就有不同的信号灯显示相序。
二、进户线安装的基本要求
(1)进户线进户点的确定。
1(同一单位,在同一用电地点的照明,动力等不同电价的各种用电,以及居民集中的住宅区需要安装多只单相电能表时,原则上只允许有一个进户点统一进户。
2(进户点位置的确定。
characteristics and duration control requires adequate labour, and establish a reward system, emulation, good team work, life and other logistical support, maintain strong work ethic and sense of responsibility, ensure the successful completion of tasks. To strictly of quality control, ensure once survived, guarantee plans of implementation increased "four technology" of application, improve construction quality efficiency life water used PP-R pipeline, hot melt connection, this a pipe of using, in is big degree Shang overcome has past traditional pipeline exists as using life short, and insulation performance poor, and installation technology requirements high, and installation cost high of problem, has resistance corrosion, and resistance small, and heat, and resistance pressure, and life long, and insulation energy-saving, and weight light, and installation reliable simple, advantages. Due to ease of installation, reduced labour intensity at the same time, improves the speed of construction. Due to installation and reliable, reducing secondary construction workload, reducing costs while ensuring construction according to schedule. Construction of the first section of the programme description according to the construction contract for the construction of electrical engineering, our scope for low voltage distribution and all future projects, public staircases of lighting engineering; the contract scope with embedded structure reserved for all electrical engineering work and weak power distribution box for the installation. Construction process construction Qian prepared ? tie civil pre buried, and reserved ? wall Shang distribution tube and
a.进户点处的建筑物应坚固、且无漏水情况。 b.靠近供电线路及负荷中心。
c.进户点位置应明显易见,便于进行施工、维护及检修。 3(确定进户线位置时,应尽可能与附近房屋的进户点相一致,但进户线不能与电话线、电视闭路线同时由一个穿管引入。
4(进户线穿管进入室内时应符合要求。
a.管口与接户线第一支持点的垂直距离宜在0.5m以内。 b.金属管、塑料管在室外进线口应做防水弯头,弯头或管口应向下。
c.穿墙硬管或PVC管的安装应内高外低,以免雨水灌入,硬管露出墙壁外部分不应小于30mm。
d.用钢管穿墙时,同一交流回路的所有导线必须穿在同一根钢管内,且管的两端应套护圈。
e.选择穿管管径时,宜使导线截面之和占管子截面积的40%。 f.导线在穿管内严禁有接头。
g.进户线与通信线、闭路线、IT线等应分开穿管进户。 (2)进户线安装的一般要求。
1(进户线应采用护套线或硬管布线,其长度一般不宜超过6米,最长不得超过10米。进户线应选用绝缘良好的铜芯导线。进户线的截面应满足导线的安全截流量,且应不小于用户用电最大负荷电流或电能表最大载流量。
characteristics and duration control requires adequate labour, and establish a reward system, emulation, good team work, life and other logistical support, maintain strong work ethic and sense of responsibility, ensure the successful completion of tasks. To strictly of quality control, ensure once survived, guarantee plans of implementation increased "four technology" of application, improve construction quality efficiency life water used PP-R pipeline, hot melt connection, this a pipe of using, in is big degree Shang overcome has past traditional pipeline exists as using life short, and insulation performance poor, and installation technology requirements high, and installation cost high of problem, has resistance corrosion, and resistance small, and heat, and resistance pressure, and life long, and insulation energy-saving, and weight light, and installation reliable simple, advantages. Due to ease of installation, reduced labour intensity at the same time, improves the speed of construction. Due to installation and reliable, reducing secondary construction workload, reducing costs while ensuring construction according to schedule. Construction of the first section of the programme description according to the construction contract for the construction of electrical engineering, our scope for low voltage distribution and all future projects, public staircases of lighting engineering; the contract scope with embedded structure reserved for all electrical engineering work and weak power distribution box for the installation. Construction process construction Qian prepared ? tie civil pre buried, and reserved ? wall Shang distribution tube and
2(对于三相四线380V进户线宜在进户线对相线安装保险,中性线严禁装设熔断器。熔断器安装应符合规定,一般应装在方便检查、维修、操作的位置。
3(熔断器的熔丝一般按电能表额定量最大电流1.5-2倍选用。
4(220V单相进户线原则上可不安熔断器,但对居民集居区进户线需要安装数只电能时应装设熔断器。熔断器熔丝一般按数只电能表最大电流之和选配。
(3)低压单相进户线的安装。
1(操作程序。
a.按工作要求做好必要的停电措施,验电并悬挂接地线。 b.接好冲击钻临时电源。
c.按选定的进户点位置用冲击钻打眼、穿管、穿线,并选定低压熔断器安装位置。
d.安装计量表箱及其断路器、隔离开关等。
e.正确安装电能表。
f.安装进户线,并与进户电能表正确连接。
g.安装低压熔断器。
2(安全注意事项。
a.工作前,由工作负责人明确人员分工,交待工作任务及现场实地情况,并详细交待安全措
施和技术措施。
characteristics and duration control requires adequate labour, and establish a reward system, emulation, good team work, life and other logistical support, maintain strong work ethic and sense of responsibility, ensure the successful completion of tasks. To strictly of quality control, ensure once survived, guarantee plans of implementation increased "four technology" of application, improve construction quality efficiency life water used PP-R pipeline, hot melt connection, this a pipe of using, in is big degree Shang overcome has past traditional pipeline exists as using life short, and insulation performance poor, and installation technology requirements high, and installation cost high of problem, has resistance corrosion, and resistance small, and heat, and resistance pressure, and life long, and insulation energy-saving, and weight light, and installation reliable simple, advantages. Due to ease of installation, reduced labour intensity at the same time, improves the speed of construction. Due to installation and reliable, reducing secondary construction workload, reducing costs while ensuring construction according to schedule. Construction of the first section of the programme description according to the construction contract for the construction of electrical engineering, our scope for low voltage distribution and all future projects, public staircases of lighting engineering; the contract scope with embedded structure reserved for all electrical engineering work and weak power distribution box for the installation. Construction process construction Qian prepared ? tie civil pre buried, and reserved ? wall Shang distribution tube and
b.进户线穿墙时,其保护套管管径应根据进户线的根数和截面来确定,且不应小于13mm。采用瓷管时应每线一根,以防止相间短路或对地短路,采用钢管时应把进户线都穿入同一钢管内。
c.进户线经穿入管处应先套上软塑料管或包绝缘胶布后,方可再穿入套管,或在钢管两端加护圈,防止进户线在穿入套管处磨损,引起短路。
d.工作负责人向工作班成员交待线路带电部位和停电部位以及现场地形情况,防止意外情况发生。
e.使用的梯子有防滑措施,且有专人护扶,以防止梯子溜滑造成工作人员伤害。
f.临时电源应用专用导线,并装设有剩余电流动作保护器。
装表接电工作人员必须树立全心全意为用户服务的思想,要掌握技术、精通业务,熟悉有关的规程制度,保证计量装置的接线正确、整齐美观、准确无误地计收电费,更好地为用户服务。
单相有功电能表接线实训一
(用1只单相有功电能表,1个保险, 1个空气开关,1个接线端子组成该用户的电能计量装置。
通过本单元实训要求掌握单相有功电能表的精度和误差,及误差形成的原因。学会使用单向电能表现场效验仪,并对装置自己安装的单相有功电能表进行验仪。并将防窃电characteristics and duration control requires adequate labour, and establish a reward system, emulation, good team work, life and other logistical support, maintain strong work ethic and sense of responsibility, ensure the successful completion of tasks. To strictly of quality control, ensure once survived, guarantee plans of implementation increased "four technology" of application, improve construction quality efficiency life water used PP-R pipeline, hot melt connection, this a pipe of using, in is big degree Shang overcome has past traditional pipeline exists as using life short, and insulation performance poor, and installation technology requirements high, and installation cost high of problem, has resistance corrosion, and resistance small, and heat, and resistance pressure, and life long, and insulation energy-saving, and weight light, and installation reliable simple, advantages. Due to ease of installation, reduced labour intensity at the same time, improves the speed of construction. Due to installation and reliable, reducing secondary construction workload, reducing costs while ensuring construction according to schedule. Construction of the first section of the programme description according to the construction contract for the construction of electrical engineering, our scope for low voltage distribution and all future projects, public staircases of lighting engineering; the contract scope with embedded structure reserved for all electrical engineering work and weak power distribution box for the installation. Construction process construction Qian prepared ? tie civil pre buried, and reserved ? wall Shang distribution tube and
贯穿实训全过程。
绘制该用户的电能计量装置电原理图
A 负 载 N
用于单相电路的电能计量装置一般只有单相电能表,这种表只有一个驱动元件(一个电流线圈和一个电压线圈)。接线方式是:电流线圈与负载串联,电压线圈与负载并联。 单相有功电能表接线实训二
(用1只单相有功电能表,1只互感器,1个保险,1个空气开关, 1个接线端子组成该用户的电能计量装置。)
通过本单元实训要求掌握单相有功电能表因扩容增加互感器后的注意事项。
1. 绘制该用户的电能计量装置电原理图
S1 S2
A 负
载 B
单相有功电能表接线实训之三
characteristics and duration control requires adequate labour, and establish a reward system, emulation, good team work, life and other logistical support, maintain strong work ethic and sense of responsibility, ensure the successful completion of tasks. To strictly of quality control, ensure once survived, guarantee plans of implementation increased "four technology" of application, improve construction quality efficiency life water used PP-R pipeline, hot melt connection, this a pipe of using, in is big degree Shang overcome has past traditional pipeline exists as using life short, and insulation performance poor, and installation technology requirements high, and installation cost high of problem, has resistance corrosion, and resistance small, and heat, and resistance pressure, and life long, and insulation energy-saving, and weight light, and installation reliable simple, advantages. Due to ease of installation, reduced labour intensity at the same time, improves the speed of construction. Due to installation and reliable, reducing secondary construction workload, reducing costs while ensuring construction according to schedule. Construction of the first section of the programme description according to the construction contract for the construction of electrical engineering, our scope for low voltage distribution and all future projects, public staircases of lighting engineering; the contract scope with embedded structure reserved for all electrical engineering work and weak power distribution box for the installation. Construction process construction Qian prepared ? tie civil pre buried, and reserved ? wall Shang distribution tube and
(用2只单相有功电能表,1个保险,1个空气开关,1个接线端子组成380V的电能计量装置。)
1. 绘制该用户的电能计量装置电原理图
A
380V B
N 三相四线有功电能表接线实训之一
(用1只三相四线有功电能表,1只三相四线无功电能表, 3个互感器,1个保险, 1个空气开关组成三相四线有功电能表的电能计量装置。)
1. 绘制该用户的电能计量装置电原理图
A A’
B B’
C C’
N N’ 2. 用万用表测量三相四线有功电能表电压线圈的直流阻。 3. 按工艺要求进行电能计量装置的接线。
characteristics and duration control requires adequate labour, and establish a reward system, emulation, good team work, life and other logistical support, maintain strong work ethic and sense of responsibility, ensure the successful completion of tasks. To strictly of quality control, ensure once survived, guarantee plans of implementation increased "four technology" of application, improve construction quality efficiency life water used PP-R pipeline, hot melt connection, this a pipe of using, in is big degree Shang overcome has past traditional pipeline exists as using life short, and insulation performance poor, and installation technology requirements high, and installation cost high of problem, has resistance corrosion, and resistance small, and heat, and resistance pressure, and life long, and insulation energy-saving, and weight light, and installation reliable simple, advantages. Due to ease of installation, reduced labour intensity at the same time, improves the speed of construction. Due to installation and reliable, reducing secondary construction workload, reducing costs while ensuring construction according to schedule. Construction of the first section of the programme description according to the construction contract for the construction of electrical engineering, our scope for low voltage distribution and all future projects, public staircases of lighting engineering; the contract scope with embedded structure reserved for all electrical engineering work and weak power distribution box for the installation. Construction process construction Qian prepared ? tie civil pre buried, and reserved ? wall Shang distribution tube and
范文二:装表接电竞赛培训方案
装表接电竞赛培训方案
一、培训人员组成
目前装表接电班班组人员12人,40岁以下只有2人,人员结构老化且多为转岗人员技术水平较为薄弱,建议参照以前竞赛培训方案采取抽调新近公司大学生和县公司人员进行培训参加竞赛。
二、培训项目
装表接电技能竞赛参照往年项目主要有:1、理论普考2、参赛选手理论考试3、错误接线分析4、计量装置安装5、电能表数据抄录6、多股铜导线绞接等组成。
三、培训目的
1、理论普考为所有装表接电工种人员都需要参加,占技能竞赛最终成绩的10%,因此建议组织所有装接工种人员参加培训,达到能够熟悉题库提高平均成绩的目的。 2、参赛选手理论考试为竞赛的重要组成部分占竞赛总成绩的30%—40%,因此需要通过前期的培训选拔出竞赛选手,进行封闭式训练熟练掌握题库、各项规程以及作业指导书。 3、错误接线分析可先通过做题提高答题速度及正确率,在培训后期到实训基地进行实际操作提高实际操作的水平。
4、计量装置安装需要到实训基地进行实际操作训练,前期准备需要购置大量4mm2单芯铜导线、操作工具等,并且需要了解省公司竞赛标准调整安装布线。通过培训达到提高安装速度及工艺水平的目的。
5、电能表数据抄录在确定参赛人员后,通过实训基地抄表台进行培训,提高抄表的速度及准确性。
6、多股铜导线绞接在确定参赛人员后,按照作业指导书规范进行培训提高操作水平及速度。 四、培训计划安排
培训项目 培训时间 参训人员 培训内容 培训地点 培训老师 理论普考 5月份 所有装表接电人员 装表接电题库 以班组组织和个人自学为主,适当组织集体讲解答疑 朱厚元、于杰、严怡
参赛选手理论考试 5月份-竞赛 初步筛选后参赛人员 装表接电题库、各项规程以及作业指导书。 通过组织学习老师讲解题库为主,在确定参赛人员后进行封闭培训 朱厚元、于杰、严怡
错误接线分析 5月份-竞赛 所有装表接电人员 错误接线分析 通过组织学习老师讲解题库为主,在确定参赛人员后进行封闭培训 朱厚元、于杰、严怡
计量装置安装 初步筛选参赛人员后 参赛人员 计量装置安装速度及工艺水平 确定参赛人员后在实训基地进行实际操作 朱厚元、于杰
电能表数据抄录 初步筛选参赛人员后 参赛人员 电能表数据抄录 确定参赛人员后在实训基地进行实际操作 刘静
多股铜导线绞接 初步筛选参赛人员后 参赛人员 多股铜导线绞接 确定参赛人员后在实训基地进行实际操作 朱厚元、于杰
五、材料需求
单芯铜导线,多股铜芯导线、剥线钳、尖嘴钳、螺丝起(一、十)字、老虎钳、弯线钳、美工刀、绝缘胶带、扎带文 - 汉语汉字 编辑词条
文,wen,从玄从爻。天地万物的信息产生出来的现象、纹路、轨迹,描绘出了阴阳二气在事物中的运行轨迹和原理。
故文即为符。上古之时,符文一体。
古者伏羲氏之王天下也,始画八卦,造书契,以代结绳(爻)之政,由是文籍生焉。--《尚书序》
依类象形,故谓之文。其后形声相益,即谓之字。--《说文》序》
仓颉造书,形立谓之文,声具谓之字。--《古今通论》
(1) 象形。甲骨文此字象纹理纵横交错形。"文"是汉字的一个部首。本义:花纹;纹理。
(2) 同本义 [figure;veins]
文,英语念为:text、article等,从字面意思上就可以理解为文章、文字,与古今中外的各个文学著作中出现的各种文字字形密不可分。古有甲骨文、金文、小篆等,今有宋体、楷体等,都在这一方面突出了"文"的重要性。古今中外,人们对于"文"都有自己不同的认知,从大的方面来讲,它可以用于表示一个民族的文化历史,从小的方面来说它可用于用于表示单独的一个"文"字,可用于表示一段话,也可用于人物的姓氏。
折叠编辑本段基本字义
1(事物错综所造成的纹理或形象:灿若,锦。
2.刺画花纹:,身。
3(记录语言的符号:,字。,盲。以,害辞。
4(用文字记下来以及与之有关的:,凭。,艺。,体。,典。,苑。,献(指有历史价值和参考价值的图书资料)。,采(a(文辞、文艺方面的才华;b(错杂艳丽的色彩)。
5(人类劳动成果的总结:,化。,物。
6(自然界的某些现象:天,。水,。
7(旧时指礼节仪式:虚,。繁,缛节(过多的礼节仪式)。
8(文华辞采,与“质”、“情”相对:,质彬彬。
9(温和:,火。,静。,雅。
10(指非军事的:,职。,治武功(指礼乐教化和军事功绩)。
11(指以古汉语为基础的书面语:552,言。,白间杂。
12(专指社会科学:,科。
13(掩饰:,过饰非。
14(量词,指旧时小铜钱:一,不名。
15(姓。
16( 皇帝谥号,经纬天地曰文;道德博闻曰文;慈惠爱民曰文;愍民惠礼曰文;赐民爵位曰文;勤学好问曰文;博闻多见曰文;忠信接礼曰文;能定典礼曰文;经邦定誉曰文;敏而好学曰文;施而中礼曰文;修德来远曰文;刚柔相济曰文;修治班制曰文;德美才秀曰文;万邦为宪、帝德运广曰文;坚强不暴曰文;徽柔懿恭曰文;圣谟丕显曰文;化成天下曰文;纯穆不已曰文;克嗣徽音曰文;敬直慈惠曰文;与贤同升曰文;绍修圣绪曰文;声教四讫曰文。如汉文帝。
折叠编辑本段字源字形
字源演变与字形比较
折叠编辑本段详细字义
〈名〉
1(右图是
“文”字的甲骨文图片,资料来源:徐无闻主编:《甲金篆隶大字典》,四川辞书出版社。1991年7月第一版。
“文”字的甲骨文字绘画的像一个正面的“大人”,寓意“大象有形”、“象形”;特别放大了胸部,并在胸部画了“心”,含义是“外界客体在心里面的整体影像、整体写真、整体素描、整体速写”。
许慎《说文解字》把“文”解释为“错画也”,意思是“对事物形象进行整体素描,笔画交错,相联相络,不可解构”,这与他说的独体为文、合体为字的话的意思是一致的。“说文解字”这个书名就表示了“文”只能“说”,而“字”则可“解”的意思。“文”是客观事物外在形象的速写,是人类进一步了解事物内在性质的基础,所以它是“字”的父母,“字”是“文”的孩子。“文”生“字”举例(以“哲”为例):先对人手摩画,其文为“手”;又对斧子摩画,其文为“斤”。以手、斤为父母,结合、生子,其子就是“折”(手和斤各代表父母的基因)。这个“折”就是许慎所谓的“字”。“字”从宀从子,“宀”表示“独立的房子”,子在其中,有“自立门户”的意思。故“字”还能与“文”或其他“字”结合,生出新“字”来。在本例,作为字的“折”与作为文的“口”结合,就生出了新的字“哲”。
2(
同本义 [figure;veins]
文,错画也。象交文。今字作纹。——东汉?许慎《说文》
五章以奉五色。——春秋?左丘明《左传?昭公二十五年》。注:“青与赤谓之文,赤与白谓之章,白与黑谓之黼,黑与青谓之黻。”
美于黼黼文章。——《荀子?非相》
茵席雕文。——《韩非子?十过》
织文鸟章,白旆央央。——《诗?小雅?六月》
斑文小鱼。——明? 刘基《诚意伯刘文成公文集》
3(又如:文驾(彩车);文斑(杂色的斑纹);文旆(有文彩的旗帜);文绣(绣有彩色花纹的丝织品;刺花图案);文织(有彩色花纹的丝织品);文鳞(鱼鳞形花纹)。
4(字,文字(“文”,在先秦时期就有文字的意思,“字”,到了秦朝才有此意。分别讲,“文”指独体字;“字”指合体字。笼统地说,都泛指文字。) [character]
饰以篆文。——南朝宋?范晔《后汉书?张衡传》
分文析字。——东汉?班固《汉书?刘歆传》
夫文,止戈为武。——《左传?宣公十二年》
距洞数百步,有碑仆道,其文漫灭。——王安石《游褒禅山记》
文曰“天启壬戌秋日”。——明? 魏学洢《核舟记》
文曰“初平山尺”。
5(又如:甲骨文;金文;汉文;英文;文迹(文字所记载的事迹);文书爻(有关文字、文凭之类的卦象);文异(文字相异);文轨(文字和车轨);文狱(文字狱);文钱(钱。因钱有文字,故称);文状(字据,军令状);文引(通行证;路凭);文定(定婚)。
6(文章(遣造的词句叫做“文”,结构段落叫做 “章”。) [literary composition]
故说诗者不以文害辞。——《孟子?万章上》
好古文。——唐? 韩愈《师说》
属予作文以记之。——宋? 范仲淹《岳阳楼记》
能述以文。——宋? 欧阳修《醉翁亭记》
摘其诗文。——清? 纪昀《阅微草堂笔记》
7(又如:文价(文章的声誉);文魔(书呆子);文会(旧时读书人为了准备应试,在一起写文章、互相观摩的集会);文移(旧时官府文书的代称);文雄(擅长写文章的大作家);文意(文章的旨趣);文义(文章的义理);文情(文章的词句和情思);本文(所指的这篇文章);作文(写文章;学习练习所写的文章);文魁(文章魁首);文价(文章的声价);文什(文章与诗篇)。
8(美德;文德 [virtue]
圣云继之神,神乃用文治。——杜牧《感怀诗一首》
9(又如:文丈(对才高德韶的老者的敬称);文母(文德之母);文武(文德与武功);文命(文德教命);文惠(文德恩惠);文德(写文章的道德);文薄(谓文德浅薄);文昭(文德昭著)。
10.文才;才华。亦谓有文才,有才华 [literary talent]
而文采不表于后世也。——汉? 司马迁《报任安书》
11(又如:文业(才学);文英(文才出众的人);文采风流(横溢的才华与潇洒的风度);文郎(有才华的青少年);文彦(有文才德行的人);文通残锦(比喻剩下不多的才华)。
12(文献,经典;韵文 [document;classics;verse]
儒以文乱法。——《韩非子?五蠹》
言必遵修旧文而不穿凿。——《说文解字?叙》
13(辞词句。亦指文字记载 [writings;record]。如:文几(旧时书信中开头常用的套语。意为将书信呈献于几前);文倒(文句颠倒);文过其实(文辞浮夸,不切实际);文义(文辞);文辞(言词动听的辞令);文绣(辞藻华丽)。
14(自然界的某些现象 [natural phenomenon]
经纬天地曰文。——《左传?昭公二十八年》
15(又如:天文;地文;水文;文象(日月星辰变化的迹象);文曜(指日月星辰;文星);文昌(星座名)。
16(文治;文事;文职。与“武”相对。 [achievements in culture and education;civilian post]
文能取胜。——《史记?平原君虞卿列传》
文不能取胜。
文武并用。——唐? 魏征《谏太宗十思疏》
精神折冲于千里,文武为宪于万邦。――明《袁可立晋秩兵部右侍郎诰》
17(又如:文臣,文吏(文职官吏);文席(教书先生的几席);文品(文官的品阶);文帅(文职官员出任或兼领统帅);文烈(文治显赫);文员(文职吏员);文阶(文职官阶);文道(文治之道);文业(文事);文僚(文职官吏)。
18(法令条文 [articles of decree]
而刀笔吏专深文巧诋,陷人于罪。——《史记?汲黯列传》
19(又如:文劾(根据律令弹劾);文法吏(通晓法令、执法严峻的官吏);文丈(规矩;制度);文移(官府文书);文牓(布告;文告);文宪(礼法;法制)。
[literary language]。如:半文20(文言。古代散文文体之一;别于白话的古汉语书面语
半白;文语;文白(文言文和白话文)。
21(文教;礼节仪式 [rites]
则修文德。——《论语?季氏》
22(又如:文丈(崇尚礼文仪节);文俗(拘守礼法而安于习俗);文致(指礼乐);文貌(礼文仪节);文绪(文教礼乐之事);文仪(礼节仪式)
23(指表现形式;外表 [form;appearance]。如:文服(表面服从);文榜(告示、布告之类);文诰(诰令)
24(指鼓乐,泛指曲调 [music;tune]。如:文曲(指乐曲);文始(舞乐名)
25(谥号,谥法:勤学好问叫文 [study deligently]
何以谓之文。——《论语》
是以谓之文。
26(姓
〈动〉
1(在肌肤上刺画花纹或图案 [tatto (the skin)]
被发文身。——《礼记?王制》。注:“谓其肌,以丹青涅之。”
文绣有恒。——《礼记?月令》
2(又如:文笔匠(在人身上刺花的艺人);文身断发(古代荆楚、南越一带的习俗。身刺花纹,截短头发,以为可避水中蛟龙的伤害。后常以指落后地区的民俗);文木(刻镂以文采之木)
3(修饰;文饰 [cover up]
身将隐,焉用文之?——《左传?僖公二十三年》
饰邪说,文奸言,以枭乱天下。——《荀子?非十二子》
4(又如:文过饰非;文致(粉饰;掩饰);文冢(埋葬文稿之处)
5(装饰 [decorate]
舍其文轩。——《墨子?公输》
此犹文奸。
文车二驷。——明? 归有光《项脊轩志》
文马四百匹。——《史记?宋世家》
若将比予文木邪。——《庄子?人间世》
6(又如:文巧(文饰巧辩);文竿(以翠羽为饰之竿);文舫(装饰华丽的游艇);文饰(彩饰);文榭(饰以彩画的台榭);文舟,文艘(装饰华丽的船);文剑(装饰华丽的剑);文舆(饰以彩绘的车)
7(撰写文章 [write]。如:文匠(写文章的大家);文祸(因写文章而招来的灾祸);文雄,文杰(指文豪)
〈形〉
1(有文采,华丽。与“质”或“野”相对 [magnificent;gorgeous]
其旨远,其辞文。——《易?系辞下》
晋公子广而俭,文而有礼。——《左传?僖公二十三年》
2(又如:文巧(华丽奇巧);文朴(文华与质朴);文服(华美的衣服);文砌(华美的石阶);文背(不文雅,粗俗);文轩(华美的车子);文质(文华与质朴)
3.柔和,不猛烈 [mild;gentle]。如:文烈(指火候温猛)
4(美,善 [fine;good]。如:文徽(华美);文鸳(即鸳鸯。以其羽毛华美,故称);文衣(华美的服装)
5(通“紊”。紊乱的 [disordered]
惇宗将礼,称秩元祀,咸秩无文。——《书?洛诰》
天子祭天下名山大川,怀柔百神,咸秩无文。——《汉书?郊祀志上》
王者报功,以次秩之,无有文也。——庆劭《风俗通义?山泽》
〈量〉
1(用于旧时的铜钱。如:一文钱
2(用于计算纺织物
五扶为一首,五首成一文。——《后汉书》
范文三:装表接电
电能计量(Ⅰ)
第一节电能表的分类、型号规格及铭牌标志
一、 电能表的分类
二、 规格型号
三、 铭牌标志
第二节 电相电能表
第三节 单相电能表的安装
一、 电能表的安装要求
二、 电能表总线的安装要求
三、 单相电能表盘面示意图
四、 单相电能表的接线
五、 注意事项
装表接电(Ⅱ)
电能计量装置概念
一般我们把电能表与其配合使用的测量互感器,二次回路及计量箱所组成的整体称为电能计量装置。 电能表的作用:计量负载消耗的电能。电能表计量的电能是指通过它的功率在某一段时间内的累积值。 互感器的作用:互感器就是一种容量小、用途特殊的
变压器。通常情况下电压互感器(TV )二次额定电压为100V 、100/√3V ,电流互感器(TA )二次额定电流位5A 、1A 。作用主要有以下三个方面:
1、 扩大了电能表的量程。互感器把高电压转换成低电压,大电流转换成小电流后,在接入电能表从而使电能表测量的范围扩大。
2、 减少了仪表的制造规格和生产成本。
3、 隔离高电压、大电流,保证了人员和仪表的安全。
第一节电能表与互感器的选择
一、 电能表的选择
二、 互感器的选择
电流互感器额定一次电流的确定,应保证其在正常运行中的实际负荷电流达到额定值的60%左右,至少不小于30%。
第三节 三相四线电能表的安装
一、 三只电能表配合接线的安装
二、 三相四线电能表直接接入式的安装
导线截面的选择
三相四线电能表接线时,应注意以下几点
1、 按正相序安装。因为三相电能表都是按正相序检定的,所以应按正相序接线,否则便会产生计量附加误差。
2、 中性线和相线不能颠倒,否则可能会烧毁电能表。
3、 与中性线对应的接线端子一定要接牢,否则可能因接触不良或断线产生电压降引起较大的计量误差。
4、 若三相四线电能表是总表,则进表中性线不能剪断接入表内,否则一旦发生接头松动,将会出现低压线路断中线的现象。
三、 三只单相电能表经电流互感器接入式的安装
四、 三相四线电能表经电流互感器接入的安装
五、 电流互感器的安装
六、 接线注意事项
第四节 电能计量装置安装注意事项
一、准备工作
1、检查电能表的校验封印、接线图、检定合格证、资产表计是否齐全,校验时间是否在6个月以内,外壳是否完好。2、检查互感器的铭牌、极性标志是否完整
清晰,接线螺丝是否完好,检定合格证是否齐全。
3、检查所需材料及工具仪表是否配足带齐。二次导线应采用单股铜芯线,并能耐压500V ,导线应分色,三相电能表应选用黄、绿、红、黑四色线。单相电能表相、零线应分色。
4、电能表在运输途中应注意防振、防摔,应放入专用的防振箱内,在路面不平或振动较大时,应采取有效措施减小振动。
二、安装场所环境检查
1、周围环境应干净明亮,不易受损、受振,无磁场及烟灰影响。
2、无腐蚀性气体、易蒸发液体的侵蚀
3、运行安全可靠,抄表读数、校验、检查、轮换方便。
4、装表点的气温不应超过电能表标准规定的工作温度范围。
三、电能表的一般安装规范
1、安装高度:对计量屏,应使电能表水平中心线距地面0.8~1.8m的范围;对安装于墙壁的计量箱易为
1.6~2.0m的范围。
2、装在计量屏内及电能表板上的开关、熔断器等设备应垂直安装,上端接电源,下端接负荷。相序应一致。
3、两只三相电能表相距的最小距离应大于80mm ,单
相电能表相距的最小距离应大于30mm ,电能表与屏边的距离应大于40mm.
4、电能表安装应牢固,每只电能表除挂表螺丝外至少还有一只定位螺丝。应使表中心线向各方向的倾斜度不大于1°。电子表安装的倾斜度可适当放宽。
5、安装在绝缘板上的三相电能表,若有接地端扭,应将其可靠接地。
6、在多雷地区。计量装置应设防雷保护。
7、在装表接线时,必须按照接线盒内的图纸施工。
8、在装表接线时,必须遵守以下接线原则:
1)单相电能表必须将相线接入电流线圈;
2) 进表导线与电能表接线端扭应为同种金属导体。
9、进表线导体裸露部分必须全部插入接线盒内,并将端扭螺丝逐个拧紧。线细孔大时,应采取有效的补救措施。带电压连接片的电能表,安装时应检查其接触是否良好。
10、电能计量装置应加封。
四、互感器的安装
1、合理匹配
2、同一组的电流互感器应采用制造厂、型号、额定电流、变比、准确度等级、二次容量均相同的互感器。
3、互感器二次回路应安装实验接线盒,便于实负荷校
验和带电换表。
4、互感器安装应牢固。互感器外壳金属部分应可靠接地。(低压电流互感器的二次侧应不接地。这是因为低压计量装置使用的导线、电能表及互感器绝缘等级相同,可能承受的最高电压也基本一致;另外二次绕组接地后,整套装置一次回路对地的绝缘水平将要下降,易使有绝缘弱点的电能表或互感器在高电压作用下损坏。)
5、同一组电流互感器应按同一方向安装。以保证该组电流互感器一次和二次回路电流的正方向一致,并可能易于观察铭牌。
6、电流互感器二次侧不允许开路。
五、二次回路的安装
1、电能 计量装置的一次和二次回路接线必须按批准的图纸施工。二次回路应有明显的标志。最好采用不同颜色的导线。二次回路走线要合理、整齐、美观、清楚。对于成套计量装置,导线与端扭连接处,应有字迹清楚、与图纸相符的编号牌。
2、二次回路的导线绝缘不得有损伤,不得有接头,导线与端扭的连接必须拧紧,接触良好。
3、电压线宜单独接入,不得与电流公用,取电压处和电流互感器一次间不得有任何断口,且应在母线上另
行打孔连接,禁止在两段母线连接螺丝上引出。
4、当需要在一组电流互感器的二次回路中接入多块电能表时,必须遵守以下原则:
1)每块电能表仍按本身的接线方式连接;
2)各电能表所有的同相电压线圈并联,所有的电流线圈串联,接入相应的电压、电流回路;
3)保证二次回路的总阻抗不超过电流线圈的二次额定阻抗值。
4)电压回路从母线到每个电能表端扭盒之间的电压降符合要求。
六、电能计量装置基本施工工艺
基本要求是:按图施工、接线正确;电气连接可靠、接触良好;配线整齐美观;导线无损伤、绝缘良好。 具体要求为:
1、 二次回路接线应注意电压、电流互感器的极性
端符号。接线时可先接电流回路,分相接线的电流互感器的二次回路宜按相色分相接入,并核对无误,再连接各相的接地线。电流回路接好后,再按相接入电压回路。
2、 二次回路接好后,应进行接线正确检查。
3、 电流互感器二次回路每只接线螺钉只允许接
入两根导线。
4、 当导线接入的端子是接触螺钉,应根据螺钉的
直径将导线的末端弯成一个环,其弯曲部分应与螺钉旋入方向相同,螺钉(螺帽)与导线间、导线与导线间应加垫圈。
5、 直接接入式电能表采用多股绝缘线,应按表计
容量选择。遇若选择的导线截面过粗时,应采用断股后再接入电能表端线盒的方式。
6、 当导线小于端子孔径较多时,应在接入导线上
加扎线后在接入。
第五节 电能计量装置接线检查及电量处理
一、一般错误类型:
1、 缺相。电压、电流量或一、或全部缺失,如电
压开路、电流开(短)路等。
2、 接反。电流、电压互感器极性接反或电流接反。
3、 移相。 电能表的电压、电流不是电能表接线
规则中所需相的电压、电流。
二、电能计量装置接线的带电检查。
一)瓦秒法检查计量装置接线
瓦秒法是将电能表反映的功率与线路中的实际功率比较,以定性判断电能计量装置是否正确。
做法:用一只秒表记录电能表圆盘转N (r )所需要的时间t (s )或N 个脉冲所需要的时间。然后根据电能表常数求出负载功率,将计算的功率值与线路中负载实际功率相比较。也可根据电能表常数和负载实际功率计算出电能表转盘或发出N 个脉冲所需要的时间,然后计算出的时间与实测时间相比较。
二)仪表检查法检查计量装置接线
步骤:
1、 检查电压
1) 判断是否失压;
2) 电压参数是否正确;
3) 相线、零线是否接反。
2、 测电流
1) 负载工作时是否有电流;
2) 直接接入线或电流互感器极性是否接反。
3、 测相序
4、 测电压与对应电流之间的相位角。
5、 画向量图。
6、 分析错误接线。
7、 求更正系数。
8、 求追补电量。
例题:有一安装低压三相四线电能表用户,配电流互感器150/5,月初电能表读数0005,月末电能表读数0105,计量检查测量记录如下:
相序检查:正相序
问答题
1、 电能表安装时有哪些要求?198
2、安装电能表时应注意的事项是什么?199 计算题:P243页4036
P244页4038
绘图题 P262页4039
范文四:水城电力公司2008年装表接电培训试题
计量基础知识与管理培训考试参考答案
部门: 姓名:
一、 填空题(30分,2分/空)
1、三相电能表按功能分 有功 表和无功表,其中三相有功电能表计量原理表达式
3是 p= 。 UIcos,
2、电能表的精度为1级的表示其 误差 在 ?1, 范围内。
3、单相电能表的表字位的首位红字框数字表示是 小数点后第一位 。 4、三相电能表规格10(40)A表示是该电能表标准电流为10A,最大电流为 40A ,一旦负载电流超过1.2倍就会引起误差,超过最大电流2倍及以上就会引起电能表烧毁。
5、一专变用户低压计量电流互感器铭牌标示:150/5穿芯两匝,如果在安装中穿芯四匝其倍率为 75/5 。
6、两部制电价是电价分为两部分,一部分是以用户的 变电容量 计算基本电费,另一部分是以用户 使用电量 计算电费。
7、电压互感器二次不允许 短路 ,电流互感器二次不允许 开路 。 8、无功有功电能表联合接线中 电流 串联, 电压 并联。
9、居民用户与供电企业的产权分界点是 下户线第一个支撑点(或T接点) 。 10、交流电三要素是: 振幅(或最大值)、频率(或周期)、初相 。 二、 选择题(不定项选择,10分 ,2分/题)
1、安装互感器的作用是( C )
A、准确计量 B、加强线损管理 C、扩大电能表量程 D、计算负荷 2、一家砖厂有250kVA变压器一台,有180kW设备,问低压计量变比选择为 ( AB )
A、500/5 B、400/5 C、200/5 D、600/5
3、1kW?h电能可供“220V,40W”灯泡正常发光时间是( D )小时 A、100 B、10 C、45 D、25
4、以下情况那些属于窃电行为( ABD )
A、私自开启铅封 B、绕过计量装置用电 C、安装无功补偿装置 D、自己埋设地线,或借用零线用电。
5、漏电保护的作用与原理是( BD )
A、能断开短路电流 B、断开接地电流 C、能断开负荷电流 D、可保护居民不被触电。
三、 判断题(10分,1分/题)
1、三相四线电能表零线端子可以不接零线。 ( × )
2、电能表安装倾斜30度不会引起电能表误差。( × )
3、单相电能表的零线是指地线。 ( ? )
4、不同型号的单相电能表用在同一户人家使用,走得越快,负荷一定越大。( × ) 5、变压器容量越大,用电量一定大。( × )
6、一家居民用户有电器3kW,保险丝合理配置为10A 。 ( × ) 7、无功补偿采用的是集中补偿与分散补偿相结合才能更好的降低线损。( ? ) 8、居民用户的单相电能表可以计量有功电能也可以计量无功电能。 ( × ) 9、单相电能表火线与零线可以对调。 ( × )
10、动力表允许分接单相用电负荷,不会有安全隐患。 ( × ) 四、 问答题(35分)
1、 从管理角度分析线损过高的原因,并提出合理的降损措施。(15分) 原因:1、低压线路凌乱 高压线路通道树木多2、计量装置管理不善3、用电检查
力度不够 4、抄核收管理不善。
降损措施:1、加强高、低压线路管理 2、加强计量管理 3、增强用电检查力度4、规范抄核收管理。
2、用户月用电量改变的原因可能是什么。(5分)
1、用电负荷加大 2、设备使用率提高 3、偷漏电现象 4、计量装置故障 3、正确安装低压防盗计量,安装工艺上应该注意些什么事项,并简说安装步骤。(15分)
工艺要求:布线美观,不裸露铜芯线 ,不压接绝缘层,接线正确,电表倾斜度合格。
步骤:1办理工作票。2、核定相序 3、正确接线,合格安装4、填写交接单5、加封用户签字
五、 计算题(15分)
1、一家砂石厂,安装的是250kVA配变,采用的是低压计量,电流互感器铭牌标示是600/5穿芯一匝,实际安装采用的是穿芯两匝,其11月份月平均电压为400V,月平均功率因数为0.8,使用时电能表二次侧平均电流为1.5A,月共利用小时数为240小时。求本家砂石厂11月份用电量。(7分)
3W,=T 3,0.4KV,1.5,(600/5),2,0.8,240UIcos,,
2、某照明用户,有彩电一台100W,白炽灯5盏,每盏40W,洗衣机一台1000W,电饮具2000W。应选多大量程的单相电能表最合理,(8分)
P3300P=100+5=3300kW I,,,15A,40,1000,2000220U
所以选择10(40)A或15(60)A或5(20)A都可以。
范文五:装表接电技术论文
浅析装表接电技术分析
摘要:合法、准确、安全的用电环境是供电企业和用电户合力创造的,装表接电工作关系到用电户和供电企业的公平交易,也关系到用电的安全。现从一些隐患问题的分析入手,交流了装表接电过程中各个方面的处理经验,对进一步做好供电工作有一定的借鉴意义。
在电能的供应和使用环节中,如何保证供电质量,且安全、经济地把电能送到千家万户,装表接电工作担负着重大责任。通过对用户报装内线工程的竣工验收、装表接电、定期对用电设备的核查,电能装置及其附属设备的正确安装等工作,达到准确计量合理收费的目的。而装表接电是业扩报装的最后一道程序,它标志着供用电双方关系的确立,是客户用电的开始,也是供电企业电能计量的开始。而装表接电工作的好坏,不仅关系到电网的安全经济运行,还直接影响到用户的切身利益。在装表接电的过程中,近年来出现了许多新的情况,在实际工作中可以从这样几个方面进行操作应对。
一、 装表接电中的隐患问题
1 、用户表计的故障问题
用户的电表总会出现一些计价问题,这时供电企业有义务迅速地处理用户表计故障,这是供电部门的职责。同时,处理好这些问题,也有利于建立供电企业的良好形象,对提高服务品质,树立行业新风尚有重要的示范作用。因为表计计量故障直接影响供电企业和用电客户之间的关系,所以处理故障问题要坚持事无大小。
随着电力体制的改革和电网的改造,电能的质量有了大幅度提
高,可是由于使用了一些新型的电子式电表,客户会出现不同程度的反馈。一种是认为电表的灵敏度太强,比以往走的要快,所以要求检验和监督。二是一些小区用户,低压情况太多,还有的地方由于报装电容量太低,而实际的容量大大地超过了报装容量,致使表计烧毁。但客户们却认为是供电公司的安装问题,因此都不想赔偿。
2、 接电安装上的问题
新型单相电子式电能表表尾都有 2 根校验用软铜线,或长或短,如果在带电安装更换时造成软铜线与电源火线接触,有可能造成电表内部电子器件烧毁并进而引起短路。虽然现在已经广泛推广使用电子表、预付费表,但不可否认仍然有一些老式机械表在使用,所以在更换的过程中要特别注意。一些老式机械表(3×1.5 a)表尾接线(从左向右)是1、4、7 是电压进线,2 和 3、5 和 6、8 和 9 是ta 进出线,新型电子表或多功能表基本是 1 和 3、4 和 6、7 和 9 是ta 进出线,2、5、8 是电压进线。如果习惯性按原来顺序依次接入新表表尾,在恢复送电时必然引起短路,危及设备和人身安全。
二、隐患问题的处理经验
1 、故障表计的处理经验
面对表计故障中出现的问题,供电服务部门要本着“客户至上”的原则,要耐心、细致地做出讲解,并要在合理地范围内对装表接电工作做出相关的检查,力求尽快找出原因,合理解决问题。
由于用户自己内部线路陈旧、老化漏电,或自己家中的电器电源开关没有关掉所引起的故障问题。也有电子表出现计数器乱走字的现
象,这就要根据其实际用电负荷及正常月份的用电数相结合,做好退补电量工作并让用户认可,既不能损害供电企业的利益,也不能损害用电客户的利益。
2 、接电安装的处理经验
做接电安装时一定要停电,如必须要带电作业,可以把新表的软铜线去掉,如需要保留,可用绝缘胶带把线头缝好。除了注意避免线头与火线直接碰触,还要防止使用钳子时钳子裸露部分同时碰触到火线和软铜线。三相电能表表尾烧坏,在没停电的情况下一定不要轻易碰触表计,因为表尾绝缘可能已经击穿,轻微的碰触也易发生短路。更换电能表和送电时容易发生短路故障。为避免此类事故,在换表送电前一定要仔细询问用电客户有无其他情况,确保无误后方可工作。事故往往发生在工作人员注意力高度集中和习惯性操作的时候,避免的办法一是工作前认真核对,二是要求监护人真正尽到监护的职责。
三、 装表接电操作案例
事例1:新型单相电子式电能表表尾都有两根校验用软铜线,或长或短,如果在带电安装更换时造成软铜线与电源火线接触,有可能造成电表内部电子器件烧毁并进而引起短路。
解决办法:允许停电时一定要停电.如必须要带电作业,可以把新表的软铜线去掉,如需要保留,可用绝缘胶带把线头缝好.除了注意避免线头与火线直接碰触,还要防止使用钳子时钳子裸露部分同时碰触到火线和软铜线。
事例2:三相电能表表尾烧坏,在没停电的情况下一定不要轻易
碰触表计(包括外壳),因为表尾绝缘可能已经击穿,轻徽的碰触就易发生短路。
事例3:在三相四线进户的情况下,如果一相故障停电,用户为解嫌眉之急会从另外两相短接到故障相用电,或从其它处引人临时电源。更换电能表和送电时容易发生短路故障。为避免此类事故.在换表送电前一定要仔细询问用电客户有无其它情况,确保无误后方可工作。
此类事故往往发生在工作人员注意力高度集中的时候,习惯性操作,避免的办法一是工作前认真核对,二是要求监护人真正尽到监护的职责。
四、小结
总之,合法、准确、安全的用电环境是供电企业和用电户合力创造的,装表接电工作关系到用电户和供电企业的公平交易,也关系到用电的安全。装表接电工作的好坏,还关系到电网的安全经济运行,装表接电是电力安装和计量人员的基本工作,只要在日常工作中做到眼勤手快、多观察、多思考,就可以锻炼出快速、准确的装表接电技术。
[参考文献]
[1] 练小春.浅谈电能表的安装工艺[j].农村电工,2008(9)