范文一:房产测量规范(最新版)
文件号:GB/T 17986
房 产 测 量 规 范
第 1单元:房产测量规定
Specifications for estate surveying—
Unit1:General rules for estate surveying
2000 – 02 – 22 发布 2000 – 08 – 01 实施 国家质量技术监督局 发 布
目 录
前言 ·······························································································I
1 范围 ······························································································1
2 引用标准 ························································································1
3 总则 ······························································································1
4 房产平面控制测量 ············································································3
5 房产调查 ······················································································ 11
6 房产要素测量 ················································································ 17
7 房产图绘制 ··················································································· 26
8 房产面积测算 ················································································ 34
9 变更测量 ······················································································ 38
10 成果资料的检查与验收 ·································································· 40 附录 A (标准的附录) 房屋、房屋用地调查表与分类 ···························42 附录 B (提示的附录) 成套房屋的建筑面积和共有共用面积分摊 ············49
前 言
本标准是在国家测绘局 1991年 5月发布的《房产测量规范》的基础上,结 合近期科技发展和生产的需求并参照国内外有关标准和规定制定的。
GB/T 17986在《房产测量规范》的总标题下,包括以下两个单元:《第 1单 元:房产测量规定》 ; 《第 2单元:房产图图式》 。
本标准的附录 A 是标准的附录;附录 B 是提示的附录。
本标准由建设部和国家测绘局提出。
本标准由建设部和国家测绘局归口管理。
本标准由国家测绘局测绘标准化研究所、 南京市房屋产权监理处、 建设部住 宅与房地产业司、 国家测绘局国土测绘司、 广州市房地产测绘所、 西安市房地产 管理局产权产籍处等单位负责起草。
本标准主要起草人:吕永江、华如宏、唐国芳、刘大可、黄保华、岳答孝、 孟娟。
1范围
本标准规定了城镇房产测量的内容与基本要求, 适用于城市、 建制镇的建成 区和建成区以外的工矿企事业单位及其毗连居民点的房产测量。 其他地区的房地 产测量亦可参照执行。
2引用标准
下列标准所包含的条文, 通过在本标准中引用而构成为本标准的条文。 本标 准出版时, 所示版本均为有效。 所有标准都会被修订, 使用本标准的各方应探讨 使用下列标准最新版本的可能性。
GB/T 2260----1995 中华人民共和国行政区划代码
GB 6962----1986 1:500、 1:1000、 1:2000 比例尺地形图航空摄影规范 GB/T 17986.2----2000 房产测规范 第 2单元:房产图图式
CH 1003----1995 测绘产品质量评定标准
3总则
3.1 房产测量的目的和内容
3.1.1房产测量的目的
房产测量主要是采集和表述房屋和房屋用地的有关信息,为房产产权、产籍 管理、 房地产开发利用、 交易、 征收税费, 以及为城镇规划建设提供数据和资料。 3.1.2房产测量的基本内容
房产测量的基本内容包括:房产平面控制测量,房产调查,房产要素测量, 房产图绘制,房产面积测算,变更测量,成果资料的检查与验收等。
3.1.3房产测量的成果
房产测量成果包括:房产簿册,房产数据和房产图集。
3.2 房产测量的基本精度要求
3.2.1房产测量的精度指标与限差
本标准以中误差作为评定精度的标准,以两倍中误差作为限差。
3.2.2房产平面控制测量的基本精度要求
末级相邻基本控制点的相对点位中误差不超过±0.025m 。
3.2.3 房产分幅平面图与房产要素测量的精度
3.2.3.1 模拟方法测绘的房产分幅平面图上的地物点,相对于邻近控制点的点位 中误差不超过图上±0.5mm
3.2.3.2 利用已有的地籍图、地形图编绘房产分幅图时,地物点相对于邻近控制 点的点位中误差不超过图上±0.6mm 。
3.2.3.3 对全野外采集数据或野外解析测量等方法所测的房地产要素点和地物 点,相对于邻近控制点的点位中误差不超过±0.05m 。
3.2.3.4 采用已有坐标或已有图件,展绘成房产分幅图时,展绘中误差不超过图 上±0.1mm 。
3.2.4 房产界址点的精度要求。
房产界址点(以下简称界址点)的精度分三级,各级界址点相对于邻近控制 占的点位误差和间距超过 50m 的相邻界址点的间距误差不超过表 1的规定;间 距未超过 50m 的界址点间距误差限差不应超过式(1)计算结果。
表 1 房产界址点的精度要求
) 02. 0(D m m D j j +±=? …………………………(1)
式中:m j ——相应等级界址点位中误差, m ;
D ——相邻界址点间的距离, m ;
D ?——界址点坐标计算的边长与实量边长较差的限差, m 。
3.2.5 房角点的精度要求
需要测定房角点的坐标时, 房角点坐标的精度等级和限差执行与界址点相同 的标准; 不要求测定房角点坐标时则将房屋按 3.2.3的精度要求表示于房产图上。 3.2.6 房产面积的精度要求
房产面积的精度分为三级,各级面积的限差和中误差不超过表 2计算的结 果。
表 2 房产面积的精度要求 m 2
3.3 测量基准
3.3.1房产测量的坐标系统
房产测量应采用 1980西安坐标系或地方坐标系,采用地方坐标系时应和国 家坐标系联测。
3.3.2房产测量的平面投影
房产测量统一采用高斯投影。
3.3.3高程测量基准
房产测量一般不测高程, 需要进行高程测量时, 由设计书另行规定, 高程测 量采用 1985国家高程基准。
4房产平面控制测量
4.1 一般规定
4.1.1房产平面控制网点的布设原则
房产平面控制点的布设, 应遵循从整体到局部、 从高级到低级、 分级布网的 原则,也可越级布网。
4.1.2房产平面控制点的内容
房产平面控制点包括二、三、四等平面控制点和一、二、三级平面控制点。 房产平面控制点均应埋设固定标志。
4.1.3房产平面控制点的密度
建筑物密集区的控制点平均间距在 100m 左右, 建筑物稀疏区的控制点平均 间距在 200m 左右。
4.1.4房产平面控制测量的方法
房产平面控制测量可选用,三角测量, 三边测量, 导线测量, GPS 定位测量
等方法。
4.1.5各等级三角测量的主要技术指标
4.1.5.1 各等级三角网的主要技术指标应符合表 3的规定。
表 3 各等级三角网的技术指标
4.1.5.2 三角形内角不应小于 30o ,确有困难时,个别角可放宽至 25 o。 4.1.6三边测量
4.1.6.1 各等级三边网的主要技术指标应符合表 4的规定。
表 4 各等级三边网的技术指标
4.1.6.2 三角形内角不应小于 30 o,确有困难时,个别角可放宽至 25 o。 4.1.7导线测量
4.1.7.1 各等级测距导线主要技术指标应符合表 5的规定。
表 5 各等级测距导线的技术指标
4.1.7.2 导线应尽量布设成直伸导线,并构成网形。
4.1.7.3 导线布成结点网时,结点与结点,结点与高级点间的附合导线长度, 不超过表 5中的附合导线长度的 0.7倍。
4.1.7.4 当附合导线长度短于规定长度的 1/2时,导线全长的闭合差可放宽至不 超过 0.12m 。
4.1.7.5 各级导线测量的测距测回数等规定,依照表 4相应等级执行。
4.1.8GPS 静态相对定位测量
4.1.8.1 各等级 GPS 静态相对定位测量的主要技术要求应符合表 6和表 7的规 定。
表 6 各等级 GPS 相对定位测量的仪器
表 7 各等级 GPS 相对定位测量的技术指标
4.1.8.2 GPS网应布设成三角网形或导线网形,或构成其他独立检核条件可以检 核的图形。
4.1.8.3 GPS网点与原有控制网的高级点重合应不少于三个。 当重合不足三个时, 应与原控制网的高级点进行联测,重合点与联测点的总数不得少于三个。
4.1.9对已有控制成果的利用
控制测量前, 应充分收集测区已有的控制成果和资料, 按本规范的规定和要 求进行比较和分析, 凡符合本规范要求的已有控制点成果, 都应充分利用; 对达 不到本规范要求的控制网点,也应尽量利用其点位,并对有关点进行联测。 4.2 水平角观测
4.2.1水平角观测的仪器
水平角观测使用 DJ 1、 DJ 2、 DJ 6三个等级系列的光学经纬仪,其在室外试验 条件下的一测回水平方向标准偏差分别不超过±1” ,±2” ,±6” 。
4.2.2水平角观测的限差
水平角观测一般采用方向观测法,各项限差不超过表 8的规定。
表 8 水平角观测限差
4.3 距离测量 4.3.1 光电测距的作用
各级三角网的起始边、 三边网或导线网的边长, 主要使用相应精度的光电测 距仪测定。
4.3.2 光电测距仪的等级
光电测距仪的精度等级, 按制造厂家给定的 1km 的测距中误差 mo 的绝对值 划分为二级:
I 级:
│ m 0│≤ 5mm II 级:
5mm <│ m="" 0│≤="">│>
4.3.3 光电测距限差
光电测距各项较差不得超过表 9的规定。
表 9 光电测距限差
4.3.4 气象数据的测定
光电测距时应测定气象数据。二、三、四等边的温度测记至 0.2℃,气压测 记至 0.5hPa ;一、二、三级边的温度测记至 1℃,气压测记至 1hPa 。 4.4 平面控制测量成果的检验和整理。 4.4.1 三角测量的检验
4.4.1.1 当三角形个数超过 20个时,测角中误差按式(2)计算:
n
ww m 3]
[±
=β …………………………….(2) 式中:W ——三角形闭合差, (” )
n ——三角形个数。
4.4.1.2 三角网极条件、边条件和方位角条件自由项的限差,分别按式(3) 、式 (4) 、式(5)计算。
W 极允 =βρβ
2'
' 2ctg m ∑±
………………………(3)
W 边允 =22
2
1
2
2
) (
) ()
(
221D m D m ctg
m D D n
++±∑βρ
β
…………….(4)
W 方允 =2
22122a a m m nm ++±β ………………………(5)
式中:βm ——相应等级规定的测角中误差, (’’ ) ;
β——传距角;
2
12
1,
D m D m D D ——起算边边长相对中误差; 21, a a m m ——起算方位角中误差, (’’ ) ; n ——方位角推算路线的测站数。
' ' ρ= 206265
4.4.2 三边测量的检验
4.4.2.1 用光电测距仪往返观测或不同时段观测时,距离测量的单位权中误差按 (6)式计算。
n
pdd 2]
[=
μ ………………………(6) 根据 μ及 i p 估算任一边的实际测距中误差,按(7)式计算。
i
D p m i 1
μ
±= ………………………(7) 式中:d ——往返测距离的较差, m ;
n ——测距边数;
P ——距离测量的先验权, 21
i
D i p δ
=
, i D δ为测距的先验中误,可以测距仪
的标称精度计算。
μ——距离测量的单位权中误差。
4.4.2.2 三边网中观测一个角度的观测值与由测距边计算的角值较差的检核。
a ) 根据各边平均测距中误差检核,按式(8)计算限差。
W 允 =2
222' ' 0
) 1cos (cos) (
2β
βρm a h m D +++± ………………(8) b ) 根据各边的平均测距相对中误差检核,按(9)式计算限差。
W 允 =2
222' ' 0
) cos (cos) (
22β
ββρm ctgactg a D m D +++± ………(9) 式中:m D ——观测边的平均测距中误差, m ;
h 0——观测角顶点至对边垂线长度, m ; a 、 β——三角形中观测角以外的另二个角度; βm ——相应等级规定的测角中误差,
(’’ ) ; D
m D
——各边的平均测距相对中误差。 ' ' ρ=206265
4.4.2.3 三边网角条件,包括圆周角条件自由项的检核按式(10)计算限差。
W 角允 =]2aa m D ± …………………………(10)
式中:D m ——观测边的平均测距中误差, mm ;
a ——圆周角条件或组合条件方程式的系数。 4.4.3 导线测量的检核
4.4.3.1 按左右角观测的三、四等导线测量的测角中误差按式(11)计算。
n
m 2]
[??±
=β ……………………………(11) 式中:?——测站圆周角闭合差, (’’ ) ;
n ——测站圆周角闭合差的个数。
4.4.3.2 以导线方位角闭合差计算测角中误差按式(12)计算。
][12
n
f N m β
β±= …………………………..(12)
式中:βf ——附合导线或闭合导线环的方位角闭合差, (’’ ) ;
n ——计算 βf 的测站数;
N ——附合导线或闭合导线环的个数。 4.4.4 GPS 静态相对定位测量成果的检核 4.4.4.1 同步观测量成果的检核
a ) 三边同步环的闭合差的限差按式(13)计算。
σ
σσσ5
3
5
3553
2221
1
1≤++=≤
?=≤
?=≤
?=∑∑∑Z Y X n
Z n
Y n
X W W W Z W Y W X W …………………(13)
b ) 多边同步环闭合差的限差按(14)式计算。
σσ
σ
σ5
555222n W W W n
W n
W n W Z Y X Z Y X ≤
++====
………………(14)
式中:Z Y X W W W , , ——各坐标差分量的闭合差;
σ——相应等级规定的精度(按平均边长计算) ; n ——闭合环的边数。 4.4.4.2 不同时段观测成果的检核
a ) 同一边任何两个时段的成果互差,应小于接收机标称精度的 22倍。 b ) 若干个独立观测边组成闭合环时,各坐标差分量闭合差应符合(15)式 规定。
n
Z W n Y W n
X W n
Z n
Y n
X σσσ3331
1
1
≤?=≤?=≤?=∑∑∑
…………………..(15)
式中:Z Y X W W W , , ——各坐标差分量的闭合差;
σ——相应等级规定的精度(按平均边长计算) ; n ——闭合环的边数 4.4.5 平差计算
二、三、四等和一、二、三级平面控制网都应分级进行统一平差或联合整体 平差。平差后应进行精度评定。 4.4.6 计算取位
平差计算和数据处理的数据取位应符合表 10的规定。
表 10 平差计算和数据处理的数字取位
5 房产调查
5.1 一般规定 5.1.1 房产调查的内容
房产调查, 分房屋用地调查和房屋调查, 包括对每个权属单元的位置、 权界、 权属、数量和利用状况等基本情况,以及地理及名称和行政境界的调查。 5.1.2 房产调查表
房产调查应利用已有的地形图、地籍图、航摄像片,以及有关产籍等资料, 按附录 A 中的 A1、 A2规定的“房屋调查表”和“房屋用地调查表”以丘和幢 为单位逐项实地进行调查。
5.2 房产单元的分类
5.2.1房屋用地的调查与测绘单元
房屋用地调查与测绘以丘为单元分户进行。
5.2.2房屋的调查与测绘单元
房屋的调查与测绘以幢为单元分户进行。
5.3 丘与丘号
5.3.1丘的定义
丘是指地表上一块有界窨的地块。一个地块只属于一个产权单元时称独立 丘,一个地块属于几个产权单元时称组合丘。
5.3.2丘的划分
有固定界标的按因定界标划分、没有固定界标的按自然界线划分。
5.3.3丘的编号
5.3.3.1 丘的编号按市、市辖区(县) 、房产区、房产分区、丘五级编号。 5.3.3.2 房产区是以市行政建制区的街道办事处或镇(乡)的行政辖区,或房地 产管理划分的区域为基础划定, 根据实际情况和需要, 可以将房产区再划分为若 干个房产分区。
5.3.3.3 丘以房产分区为单元划分。
5.3.3.4 编号方法:市、市辖区(县)的代码采用 GB/T 2260规定的代码。 房产区和房产分区均以两位自然数字从 01至 99依序编列; 当未划分房产分 区时,相应的房产分区编号用“ 01”表示。
丘的编号以房产分区为编号区, 采用 4位自然数字从 0001至 9999编列; 以 后新增丘接原编号顺序连续编立。
丘的编号格式如下:
市代码 +市辖区(县)代码 +房产区代码 +房产分区代码 +丘号
(2位) (2位) (2位) (2位) (4位)
丘的编号从北至南,从西至东以反 S 形顺序编列。
5.4 幢与幢号
5.4.1幢的定义
幢是指一座独立的,包括不同结构和不同层次的房屋。
5.4.2幢号的编立
幢号以丘为单位,自进大门起,从左到右,从前到后,用数字 1、 2…… 顺序 按 S 形编号。幢号注在房屋轮廓线内的左下角,并加括号表示。
5.4.3房产权号
在他人用地范围内所建的房屋,应在幢号后面加编房产权号,房产权号用标 识符 A 表示。
5.4.4房屋共有权号
多户共有的房屋,在幢号后面加编共有权号,共有权号用标识符 B 表示。 5.5 房屋用地调查
5.5.1房屋用地调查的内容
房屋用地调查的内容包括用地座落、产权性质、等级、税费、用地人、用地 单位所有制性质、使用权来源、四至、界标、用地用途分类、用地面积和用地纠 纷等基本情况,以及绘制用地范围略图。
5.5.2房屋用地座落
房屋用地座落是指房屋用地所在街道的名称和门牌号。 房屋用地座落在小的 里弄、胡同和小巷时,应加注附近主要街道名称;缺门牌号时,应借用毗连房屋 门牌号并加注东、南、西、北方位;房屋用地座落在两个以上街道或有两个以上 门牌号时,应全部注明。
5.5.3房屋用地的产权性质
房屋用地的产权性质按国有、集体两类填写。集体所有的还应注明土地所有 单位的全称。
5.5.4房屋用地的等级
房屋用地的等级按照当地有关部门制定的土地等级标准执行。
5.5.5房屋用地的税费
房屋用地的税费是指房屋用地的使用人每年向相关部门缴纳的费用, 以年度 缴纳金额为准。
5.5.6房屋用地的使用权主
房屋用地的使用权主是指房屋用地的产权主的姓名或单位名称。
5.5.7房屋用地的使用人
房屋用地的使用人是指房屋用地的使用人的姓名或单位名称。
5.5.8用地来源
房屋用地来源是指取得土地使用权的时间和方式,如转让、出让、征用、划 拨等。
5.5.9用地四至
用地四至是指用地范围与四邻接壤的情况,一般按东、南、西、北方向注明 邻接丘号或街道名称。
5.5.10用地范围的界标
用地范围的界标是指用地界线上的各种标志,包括道路、河流等自然界线; 房屋墙体、围墙、栅栏等围护物体,以及界碑、界桩等埋石标志。
5.5.11用地用途分类
用地用途分类按附录 A 中的 A3执行。
5.5.12用地略图
用地略图是以用地单元为单位绘制的略图,表示房屋用地位置、四至关系、 用地界线、共用院落的界线,以及界标类别和遇属,并注记房屋用地界线边长。 房屋用地界线是指房屋用地范围的界线。 包括共用院落的界线, 由产权人 (用 地人) 指界与邻户认证来确定。 提供不出证据或有争议的应根据实际使用范围标 出争议部位,按未定界处理。
5.6 房屋调查
5.6.1房屋调查的内容
房屋调查内容包括房屋座落、产权人、产别、层数、所在层次、建筑结构、 建成年份、用途、墙体归属、权源、产权纠纷和他项权利等基本情况,以及绘制 房屋权界线示意图。
5.6.2房屋的座落
房屋的座落按 5.5.2要求调查。
5.6.3房屋产权人
5.6.3.1 私人所有的房屋,一般按照产权证件上的姓名。产权人已死亡的,应注 明代理人的姓名;产权是共有的,应注明全体共有人姓名。
5.6.3.2 单位所有的房屋,应注明单位的全称。两个以上单位共有的,应注明全 体共有单位名称。
5.6.3.3 房地产管理部门直接管理的房屋,包括公产、代管产、托管产、拨用产 等四种产别。 公产就注明房地产管理部门的全称。 代管产应注明代管及原产权人 姓名。 托管产应注明托管及委托人的姓名或单位名称。 拨用产应注明房地产管理 部门的全称及拨借单位名称。
5.6.4房屋产别
房屋产别是指根据产权占有不同而划分的类别。按两级分类调记,具体分类 标准按附录 A 中的 A4执行。
5.6.5房屋产权来源
房屋产权来源是指产权人取得房屋产权的时间和方式, 如继承、 分析、 买受、 受赠、交换、自建、翻建、征用、收购、调拨、价拨、拨用等。
产权来源有两种以上的,应全部注明。
5.6.6房屋总层数与所在层次
5.6.6.1 房屋层数是指房屋的自然层数,一般按室内地坪±0以上计算;采光窗 在室外地坪以上的半地下室,其室内层高在 2.20m 以上的,计算自然层数。房 屋总层数为房屋地上层数与地下层数之和。
假层、附层(夹层) 、插层、阁楼(暗楼) 、装饰性塔楼,以及突出屋面的楼 梯间、水箱间不计层数。
5.6.6.2 所在层次是指本次属单元的房屋在该幢楼房中的第几层。地下层次以负 数表示。
5.6.7房屋建筑结构
房屋建筑结构是指根据房屋的梁、柱、墙等主要承重构件的建筑构件的建筑 材料划分类别,具体分类标准按附录 A 中的 A5执行。
5.6.8房屋建成年份
房屋建成年份是指房屋实际竣工年份。 拆除翻建的, 应以翻建竣工年份为准。
一幢房屋有两种以上建成年份,应分别注明。
5.6.9房屋用途
房屋用途是指房屋的实际用途。具体分类标准按附录 A 中的 A6执行。 一幢房屋有两种以上用途,应分别调查注明。
5.6.10房屋墙体归属
房屋墙体归属是房屋四面墙体所有权的归属,分别注明自有墙、共有墙和借 墙等三类。
5.6.11房屋产权的附加说明
在调查中对产权不清或有争议的,以及设有典当权、抵押权等他项权利的, 应作出记录。
5.6.12房屋权界线示意图
房屋权界线示意图是以权属单元为单位绘制的略图,表示房屋及其相关位 置、权界线、共有共用房屋权界线,以及与邻户相连墙体的归属,并注记房屋边 长。对有争议的权界线应标注部位。
房屋权界线是指房屋权属范围的界线,包括共有共用房屋的权界线,以产权 人的指界与邻户认证来确定,对有争议的权界线,应作相应记录。
5.7 行政境界与地理名称调查
5.7.1行政境界调查
行政境界调查,应依照各级人民政府规定的行政境界位置,调查区、县和镇 以上的行政区划范围,并标绘在图上。街道或乡的行政区划,可根据需要调绘。 5.7.2地理名称调查
5.7.2.1 地理名称调查(以下简称地名调查)包括居民点、道路、河流、广场等 自然名称。
5.7.2.2 自然名称应根据各地人民政府地名管理机构公布的标准名或公安机关编 定的地名进行。凡在测区范围内的所有地名及重要的名胜古迹,均应调查。 5.7.3行政机构名称调注
行政机构名称只对镇以上行政机构进行调查。
5.7.4企事业单位名称的调注
应调查实际使用该房屋及其用地的企事业单位的全称。
6房产要素测量
6.1 房产要素测量的主要内容
6.1.1界址测量
6.1.1.1 界址点的编号,以高斯投影的一个整公里格网为编号区,每个编号区的 代码以该公里格网西南角的横纵坐标公里值表示。 点的编号在一个编号区内从 1— 99999连续顺编。 点的完整编号由编号区代码、 点的类别代码、 点号三部分组 成,编号形成如下:
编号区代码 类别代码 点的编号
(9位) (1位) (5位)
********* * *****
编号区代码由 9位数组成, 第 1、 第 2位数为高斯坐标投影带的带号或代号, 第 3位数为横坐标的百公里数,第 4、第 5位数为纵坐标的千公里和百公里数, 第 6、第 7位和第 8、第 9位数分别为横坐标和纵坐标的十公里和整公里数。 类别代码用 1位数表示,其中:3表示界址点。
点的编号用 5位数表示,从 1—— 99999连续顺遍。
6.1.1.2 界址点测量从邻近基本控制点或高级界址点起算,以极坐标法、支导线 法或正交法等野外解析法测定, 也可在全野外数据采集时和其他房地产要素同时 测定。
6.1.1.3 丘界线测量,需要测定丘界线边长时,用预检过的钢尺丈量其边长,丘 界线丈量精度应符合本规范规定,也可由相邻界址点的解析坐标计算丘界线长 度。对不规则的弧形丘界线,可按折线分段丈量。测量结果应标示在分丘图上。 供计算丘面积及复丈检测之依据。
6.1.1.4 界标地物测量,应根据设立的界标类别、权属界址位置(内、中、外) 选用各种测量方法测定, 其测量精度应符合本规范规定, 测量结果应标示在分丘 图上。
界标与邻近较永久性的地物宜进行联测。
6.1.2境界测量
行政境界测量,包括国界线以及国内各级行政区划界。测绘国界时,应根据 边界条约或有关边界的正式文件精确测定,国界线上的界桩点应按坐标值展绘,
注出编号, 并尽量注出高程。 国内各级行政区划界应根据勘界协议, 有关文件准 确测绘,各级行政区划界上的界桩、界碑按其坐标值展绘。
6.1.3房屋及其附属设施测量
6.1.3.1 房屋应逐幢测绘,不同产别、不同建筑结构、不同层数的房屋应分别测 量,独立成幢房屋,以房屋四面墙体外侧为界测量;毗连房屋四面墙体,在房屋 所有人指界下,区分自有、共有或借墙,以墙体所有权范围为界测量。每幢房屋 除按本规范要求的精度测定其平面位置外, 应分幢分户丈量作图。 丈量房屋以勒 脚以上墙角为准;测绘房屋以外墙水平投影为准。
6.1.3.2 房屋附属设施测量,柱廊以柱外围为准;檐廊以外轮廓投影、架空通廊 以外轮廓水平投影为准; 门廊以柱或围护物外围为准, 独立柱的门廊以顶盖投影 为准;挑廊以外轮廓投影为准。阳台以底板投影为准;门墩以墩外围为准;门顶 以盖投影为准;室外楼梯和台阶以外围水平投影为准。
6.1.3.3 房角点测量,指对建筑物角点测量,其点的编号方法除点的类别代码外, 其余均与界址点相同,房角点的类别代码为 4。
房角点测量不要求在墙角上都设置标志,可以房屋外墙勒脚以上(100±20) cm 处墙角为测点。房角点测量一般采用极坐标法、正交法测量。对正规的矩形 建筑物,可直接测定三个房角点坐标,另一个房角点的坐标可通过计算求出。 6.1.3.4 其他建筑物,构筑物测量是指不属于房屋,不计算房屋建筑面积的独立 地物以及工矿专用或公用的贮水池、油库、地下人防干支线等。
独立地物的测量,应根据地物的几何图形测定其定位点。亭以柱外围为准; 塔、烟囱、罐以底部外围轮廓为准;水井以中心为准。构筑物按需要测量。 共有部位测量前,须对共有部位认定,认定时可参照购房协议、房屋买卖合 同中设定的共有部位,经实地调查后予以确认。
6.1.4陆地交通、水域测量
6.1.4.1 陆地交通测量是指铁路、道路桥梁测量。铁路以轨距外缘为准;道路以 路缘为准;桥梁以桥头和桥身外围为准测量。
6.1.4.2 水域测量是指河流、湖泊、水库、沟渠、水塘测量。河流、湖泊、水库 等水域以岸边线为准;沟渠、池塘以坡顶为准测量。
6.1.5其他相关地物测量
其他相关地物是指天桥、站台、阶梯路、游泳池、消火栓、检阅台、碑以及 地下构筑物等。
消火栓、 碑不测其外围轮廓, 以符号中心定位。 天桥、 阶梯路均依比例绘出, 取其水平投影位置。站台、游泳池均依边线测绘,内加简注。地下铁道、过街地 道等不测出其地下物的位置,只表示出入口位置。
6.2 野外解析法测量
6.2.1极坐标法测量
6.2.1.1 采用极坐标法时,由平面控制点或自由设站的测量站点,通过测量方向 和距离,来测定目标点的位置。
6.2.1.2 界址点的坐标一般应有两个不同测站点测定的结果,取两成果的中数作 为该点的最后结果。
6.2.1.3 对间距很短的相邻界址点应由同一条线路的控制点进行测量。
6.2.1.4 可增设辅助房产控制点,补充现有控制点的不足;辅助房产控制点参照 三级房产平面控制点的有关规定招待载,但可以不埋设永久性的固定标志。 6.2.1.5 极坐标法测量可用全站型电子速测仪,也可用经纬仪配以光电测距仪或 其他符合精度要求的测量设备。
6.2.2正交法测量
正交法又称直角坐标法,它是借助测线和短边支距测定目标点的方法。 正交法使用钢尺丈量距离配以直角棱镜作业。支距长度不得超过 50m 。 正交法测量使用的钢尺须经检定合格。
6.2.3线交会法测量
线交会法又称距离交会法, 它是借助控制点、 界址点和房角点的解析坐标值, 按三边测量定出测站点坐标,以测定目标点的方法。
6.3 航空摄影测量
利用航空摄影测量方法测绘 1:500、 1:1000房产分幅平面图,可采用精密 立体测图仪、解析测图仪、精密立体坐标量测仪机助测图和数字测图方法。 6.3.1对航摄影资料的基本要求
按 GB 6962执行。
6.3.2像片控制点测量
6.3.2.1 像片控制点分为平面控制点、高程控制点和平高控制点。
6.3.2.2 像片控制眯的起算点为基本控制点。
6.3.2.3 平面控制点和平高控制点相对邻近基本控制点的点位中误差不超过图上 ±0.1mm 。 高程控制点和平高控制点相对邻近高程控制点的高程中误差不超过±0.1m 。
6.3.2.4 像片控制点可以采用全野外布点法或解析空中三角测量区域网平差布点 法。
6.3.2.5 像片控制点的平面坐标,一般采用三角网、三边网、测距导线和 GPS 静 态相对定位测量等方法测定。 用 GPS 静态相对定位方法测定时, GPS 观测应使 用优于 10mm+3ppm标称精度的接收机进行。
6.3.2.6 位于高层建筑物上的像片控制点,允许用 GPS 方法测定平面位置的同 时,同步测定拟合计算平高控制点的高程。
6.3.2.7 内业加密点分为平面加密点、高程加密点和平高加密点。
6.3.2.8 内业加密控制点对邻近野外控制点的平面点位中误差和高程中误差不超 过表 11的规定。
表 11 加密点平面和高程中误差
界址点和房角点如采用航测法内业加密测量时,其精度分别应符合 3.2.4和 3.2.5的要求。
6.3.2.9 选用的区域网平差计算程序应能对像点坐标分别进行系统误差的改正, 相对定向限差不超过表 12的规定;模型连接较差不超过表 13的规定。
表 12 相对定向限差
表 13 模型连接较差
表中:l ?——平面位置较差, m ;
Z ?——高程较差, m ;
t m ——像片比例尺分母;
k f ——航摄仪焦距, mm ;
b ——像片基线长度, mm 。
6.3.2.10 绝对定向后基本定向点残差、 多余控制点不符值及区域网间公共点较差 不超过表 14的规定。
表 14 绝对定向限差
6.3.2.11 加密点中误差以全区或单个区域为单位按式 (16) 、 式 (17) 进行估算:
n
m p ][??±= ……………………………(16) n dd m g 3][±
= …………………………….(17) 式中:q m ——控制点中误差, m ;
g m ——公共点中误差, m ;
?——多余野外控制点不符值, m ;
d ——相邻航线或相邻区域网之间公共点较差, m ;
n ——评定精度点数。
6.3.3 像片调绘与调绘志
6.3.3.1 用航空摄影测量方法测绘房产图,一般采用全野外像片调绘和立体测图 仪测绘的方法。 当采用立体测绘仪测绘时, 可以在室内用精密立体测绘仪或解析 测图仪进行地物要素的测绘, 然后用所测绘的原图到外业进行地物要素的补调或 补测。要求判读准确,描绘清楚,图式符号运用恰当,各种注记正确无误。
6.3.3.2 调绘像片和航测原图上各种要素应分红、绿、黑三色表示。其中房产要 素、房产编号和说明用红色,水系用绿色,其他用黑色。
6.3.3.3 像片上无影像、影像模糊和被影像或阴影遮盖的地物,应调绘期间进行 补调或补测。
6.3.3.4 外业直接在像章片上表示某些要素有一定困难,可采用“调绘志”方法, 即在调绘片上蒙附等大的聚酯薄膜, 划出调绘面积与像片上准确套合, 作业中着 重对界址、权属界线、阴影、屋檐改正等有关情况及数字,记录在上面,表述有 关地物的形状、尺寸及其相关位置或某些说明资料,为内业提供应用。
6.3.4 外业补测
对像片上无影像的地物,影像模糊的地物,被阴影或树木影像覆盖的地物, 作业期间应进行补调或补测。补调可采用以明显地物点为起点的交会法或截距 法,在像片上或调绘志上标明与明显地物点的相关距离 2— 3处,取位至 0.01m ; 补测或补调难度较大且影响精度时采用平板仪作业。 对航摄后拆除的地物, 则应 在像片相应位置用线色划去,成片的应标出范围并加文字说明。
6.3.5屋檐宽度测量与屋檐改正
当屋檐宽度大于图上 0.2mm 时, 应在像片或采集原图上相应位置注明实量的 宽度,丈量取位至于 0.01m 。内业立体测图或图形编辑时应根据实量长度对屋檐 进行改正。
6.3.6数据采集
6.3.6.1 利用航空摄影像片对,在解析测图仪或数字化扫描仪上采用航测数字测 图的原理和方法获得数字图,以满足房产管理的需要。
6.3.6.2 数据采集可以选用各类解析测图仪或精密立体测图仪与图形工作站联机 作业。
6.3.6.3 解析测图仪内定向的框标坐标量测误差不超过±0.005mm ,个别不得超 过±0.008 mm; 绝对定向的平面坐标误差不超过图上±0.03mm , 个别不得超过 ±0.04mm ;高程定向误差不超过加密点的高程中误差;绘图桌定向的平面误差 不超过图上±0.03mm 。定向残差要配赋至最小,且配赋合理。
6.3.6.4 建立统一的符号库和控制点文件库。
6.3.6.5 相邻图幅图形文件必须严格接边。
6.3.6.6 数据量测主要是规定量测模型的比例尺、数据量测间距、量测元素的颜 色等; 量测有方向性的线关地物符号应用符号部分落在量测方向的左侧; 图像轮 廓明显清晰的房屋、 围护物等地物, 按图式要求用测标中心切准地物外轮廓和定 位点、定位线,不得遗漏、变形、移位。
6.3.6.7 房产数字图的数据采集成果应进行检核,在保证数据采集成果无误的基 础上才能进行数据处理与图形编辑。
6.3.7数据处理与图形编辑
数据处理包括数据的检查和更新、 数据的选取和运算、 图形的变换和表示等。 图形编辑包括按有关技术规定建立符号库、 规定图形要素的层次及颜色、 数字注 记和文字注记应符合 GB/T 17986.2的规定。
6.3.8根据要求的文件格式建立数据文件与图形文件。
6.4 全野外数据采集
6.4.1全野外数据采集的主要内容
全野外数据采集系指利用电子速测仪和电子记簿或便携式计算机所组成的
野外数据采集系统, 记录的数据可以直接传输至计算机, 通过人机交互处理生成 图形数据文件,可自动绘制房地产图。
6.4.2主要技术指标与技术要求
6.4.2.1 每个测站应输入测站点点号和测站点坐标,仪器号,指标差,视准轴误 差,观测日期,仪器高等参数。
6.4.2.2 仪器对中偏差不超过±3mm ;仪器高、觇点高取至厘米;加、乘常数改 正不超过 1cm 时可不进行改正。
6.4.2.3 以较远点定向,以另一已知点作检核,检核较差不得超过±0.1m ,数据 采集结束后,应对起始方向进行检查。
6.4.2.4 观测时,水平角和垂直角读至 1’ ,测距读到 1mm ,最大距离一般不超过 200m ,施测困难地区可适当放宽,但距离超过 100m 时,水平角读至 0.1’ 。 6.4.2.5 观测棱镜时,棱镜气泡应居中,如棱镜中心不能直接安置于目标点的中 心时,应作棱镜偏心改正。
6.4.2.6 野外作业过程中应绘制测量草图,草图上的点号和输入记录的点号应一 一对应。
6.4.3作业代码
野外作业时可以用自编的房地产要素代码, 代码应以有利于对数据的编辑处 理,且易为观测人员记忆和减少野外作业的工作量。
6.4.4数据采集的软件
每日施测前,应对数据采集软件进行测试;当日工作结束以后,应检查录入 数据是否齐全和正确。
6.4.5图形编辑
将外业采集的图形数据在计算机屏幕上进行编辑修改和检查,形成图形文 件。
生成绘图文件,通过数控绘图诡计可自动绘制房地产图。
6.4.6测绘精度
全野外数据的采集精度应符合 3.2.3, 3.2.4, 3.2.5的要求。
6.5 测量草图
6.5.1测量草图的作用
测量草图地地块、建筑物、位置关系和房地调查的实地记录。是展绘地块界 址、 房屋、 计算面积和填写房产登记表的原始依据。 在进行房地产测量时应根据 项目的应根据项目的内容用铅笔绘制测量草图。
测量草图包括房屋用地测量草图和房屋测量草图。
6.5.2房屋用地测量草图的内容
a ) 平面控制网点及点号。
b ) 界址点、房角点相应的数据。
c ) 墙体的归属。
d ) 房屋产别、房建筑结构、房屋层数。
e ) 房屋用地用途类别。
f ) 丘(地)号。
g ) 道路及水域。
h ) 有关地理名称,门牌号。
i ) 观测手簿中所有未记录的测定参数。
j ) 测量草图符号的必要说明。
k ) 指北方向线。
l ) 测量日期,作业员签名。
6.5.3房屋测量草图内容及要求
a ) 房屋测量草图均按概略比例尺分层绘制。
b ) 房屋外墙及分隔墙均绘单实线。
c ) 图纸上应注明房产区号、房产分区号、丘(地)号、幢号、层次及房屋 座落,并加绘指北方向线。
d ) 住宅楼单元号、室号、注记实际开门处。
e ) 逐间实量、注记室内净空边长(以内墙面为准) 、墙体厚度,数字取至厘 米。
f ) 室内墙体凹凸部位在 0.1m 以上者如柱垛、烟道、垃圾道、通风道等均应 表示。
g ) 凡有固定设备的附属用房发厨房、厕所、卫生间、电梯楼梯等均须实量 边长,并加必要的注记。
h ) 遇有地下室、覆式房、夹层、假层等应另绘草图。
i ) 房屋外廓的全长与室内分段丈量之和(含墙身厚度)的较差在限差内时, 应以房屋外廓数据为准,分段丈量的数据按比例配赋。超差须进行复量。 6.5.4测量草图的图纸规格
草图用纸可用 787mm ×1092mm 的 1/8、 1/16、 1/32规格的图纸。
6.5.5测量草图的比例尺
测量草图选择合适的概略比例尺,使其内容清晰易读。在内容较集中的地方 可绘制局部图。
6.5.6测量草图的绘制要求
测量草图应在实地绘制, 测量的原始数据不得涂改擦拭。 汉字字头一律向北、 数字字头向北或向西。
6.5.7测量草图图式
测量草图的图式符号参照 GB/T 17986.2执行。
7房产图绘制
房产图是房产产权、 产籍管理的重要资料。 按房产管理的需要可分为房产分 幅平面图(以下简称分幅图) 、房产分丘平面图(以下简称分丘图)和房屋分户 平面图(以下简称分户图) 。
7.1 房产分幅图
分幅图是全面反映房屋及其用地的位置和权属等状况的基本图。 是测绘分丘 图和分户图的基础资料。
7.1.1分幅图的测绘范围
分幅图的测绘范围包括城市、县城、建制镇的建成区和建成区以外的工矿企 事业等单位及其毗连居民点。
7.1.2分幅图的规格
7.1.2.1 分幅图采用 50cm ×50cm 正方形分幅。
7.1.2.2 建筑物密集区的分幅图一般采用 1:500比例尺, 其他区域的分幅图可以 采用 1:1000比例尺。
7.1.2.3 分幅图的图纸采用厚度为 0.07mm----0.1mm 经定型处理、变形率小于 0.02%的聚脂薄膜。
7.1.2.4 分幅图的颜色一般采用单色。
7.1.3分幅图绘制的技术要求
7.1.3.1 展绘图廓线、方格网和控制点,各项误差不超过表 15的规定:
表 15 图廓线、方格网、控制点的展绘限差 mm
7.1.3.2 房地产要素的点位精度按 3.2.3的规定执行。
7.1.3.3 图幅的接边误差不超过地物点点位中误差的倍,并应保持相关位置的位 置的正确和避免局部变形。
7.1.4分幅图应表示的基本内容
分幅图应表示控制点、 行政境界、 丘界、 房屋、 房屋附属设施和房屋围护物, 以及与房地产有关的地籍地形要素和注记。
7.1.5分幅图的编号
分幅图编号以高斯一克吕格坐标的整公里格网为编号区, 由编号区代码加分 幅图代码组成(见图 1) ,编号区的代码以该公里格网西南角的横纵坐标公里值 表示。
编号形式如下:
分幅图的编号:编号区代号 分幅图代码
完整编号:********* **
(9位) (2位)
简略编号:**** **
(4位) (2位)
编号区代码由 9位数组成,代码含义如下:
第 1、第 2位数为高斯坐标投影带的带号或代号,第 3位数为横坐标的百公 里数,第 4、第 5位数为纵坐标的千公里的百公里数,第 6、第 7位和第 8、第 9位数分别为横坐标和纵坐标的十公里和整公里数。
分幅图比例尺代码由 2位数组成,按图 1规定执行。
在分幅图上标注分幅图编号时可采用简略编号, 简略编号略去编号区代码中 的百公里和百公里以前的数值。
7.1.6 分幅图绘制中各要素的取舍与表示办法
7.1.6.1 行政境界一般只表示区、县和镇的境界线,街道办事处或乡的境界根据 需要表示,境界线重合时,用高一级境界线表示,境界线与丘界线重合时,用丘 界线表示,境界线跨越图幅时,应在内外图廓间的界端注出行政区划名称。
7.1.6.2 丘界线表示方法。明确无争议的丘界线用丘界线表示,有争议或无明显 界线又提不出凭证的丘界线用未定丘界线表示。 丘界线与房屋轮廓线或单线地物 线重合时用丘界线表示。
7.1.6.3 房屋包括一般房屋、架空房屋和窑洞等。房屋应分幢测绘,以外墙勒肢 以上外围轮廓的水平投影为准, 装饰性的柱和加固墙等一般不表示; 临时性的过 渡房屋及活动房屋不表示;同幢房屋层数不同的应绘出分层线。
窑洞只绘住人的,符号绘在洞口处。
架空房屋以房屋外围轮廓投影为准,用虚线表示;虚线内四角加绘小圈表示 支柱。
7.1.6.4 分幅图上应绘制房屋附属设施,包括柱廊、檐廊、架空通廊、底层阳台、 门廊、门楼、门、门墩和室外楼梯,以及和房屋相连的台阶等。
a ) 柱廊以柱的外围为准,图上只表示四角或转折处的支柱;
b ) 底层阳台以底板投影为准;
c ) 门廊以柱或围护物外围为准,独立柱的门廊以顶盖投影为准;
d ) 门顶以顶盖投影为准;
e ) 门墩以墩的外围为准;
f ) 室外楼梯以水平投影为准,宽度小于图上 1mm 的不表示;
g ) 与房屋相连的台阶按水平投影表示,不足五阶的不表示。
7.1.6.5 围墙、栅栏、栏杆、篱笆和铁丝网等界标围护物均应表示,其他围护物 根据需要表示。临时性或残缺不全的和单位内部的围护物不表示。
7.1.6.6 分幅图上应表示的房地产要素和房产编号包括丘号、房产区号、房产分 区号、丘支号、幢号、房产权号、门牌号、房屋产别、结构、层数据、房屋用途 和用地分类等, 根据调查资料以相应的数字、 文字和符号表示。 当注记过密容纳 不下时,除丘号、丘支号、幢号和房产权号必须注记,门牌号可首末端注记、中 间跳号注记外,其他注记按上述顺序从后往前省略。
7.1.6.7 与房产管理有关的地形要素包括铁路、道路、桥梁、水系和城墙等地物 均应表示。亭、塔、烟囱以及水井、停车场、球场、花圃、草地等可根据需要表 示。
a ) 铁路以两轨外缘为准;首路以路缘为准;桥梁以外围投影为准;城墙以 基部为准;沟、渠、水塘、游泳池等以坡顶为准;其中水塘、游泳池等 应加简注。
b ) 亭以柱的外围为准;塔、烟囱和罐以底部外围轮廓为准;水井以井的中 心为准;停车场、球场、花圃、草地等以地类界线表示,并加注相就符 号或加简注。
7.1.7地理名称注记
7.1.7.1 地名的总名与分名应用不同的字级分别注记。
7.1.7.2 同一地名被线状地物和图廓分割或者不能概括大面积和延伸较长的地 域、地物时,应分别调注。
7.1.7.3 单位名称只注记区县级以上和使用面积大于图上 100cm 2的单位。 7.1.8图边处理与图面检查
7.1.8.1 接边差不得大于本规范规定的界址点、地物点位中误差的 22倍,并应 保证房屋轮廓线、丘界线和主要地物的相互位置及走向的正确性。
7.1.8.2 自由图边在测绘过程中应加强检查,确保无误。
7.1.9图廓整饰
7.1.9.1 分幅图图幅编号按 7. 1. 5规定执行。
7.1.9.2 分幅图、分丘图上每隔 10 cm展绘坐标网点,图廓线上坐标网线向内侧 绘 5.0mm 短线,图内绘 10.0mm 的十字坐标线。
7.1.9.3 分幅图上一般不注图名,如注图名时图廓左上角应加绘图名结合表。 7.1.9.4 采用航测法成图时,图廓左下角应加注航摄时间和调绘时间。
7.2 房产分丘图的绘制
分丘图是分幅图的局部图,是绘制房屋产权证附图的基本图。
7.2.1分丘图的规格
7.2.1.1 分丘图的幅面可在 787mm ×1092mm 的 1/32~1/4之间选用。
7.2.1.2 分丘图的比例尺,根据丘面积的大小,可在 1:100~1:1000之间选用。 7.2.1.3 分丘图的图纸一般采用聚脂薄膜,也可选用其他材料。
7.2.2分丘图的技术要求
7.2.2.1 展绘图廓线,方格网和控制点的各项误差不超过 7. 1. 3. 1中的规定。 7.2.2.2 分丘图的坐标系统与分幅图的坐标系统应一致。
7.2.3分丘图上应表示的内容
分丘图上除表示分幅图的内容外, 还应表示房屋权界线、 界址点点号、 窑洞 使用范围,挑廓、阳台、建成年份、用地面积、建筑面积、墙体归属和四至关系 等各项房地产要素。
7.2.4分丘图上周邻关系的描述
分丘图上,应分别注明所有周邻产权所有单位(或人)的名称,分丘图上各 种注记的字头应朝北或朝西。
7.2.5毗邻墙体的表示与测量
测量本丘与邻丘毗连墙体时,共有墙以墙体中间为界,量至墙体厚度的 1/2处;借墙量至墙体的内侧;自有墙量至墙体外侧并用相应符号表示。
7.2.6重合要素的表示与处理
房屋权界线与丘界线重合时, 表示丘界线, 房屋轮廓线与房屋权界线重合时, 表示房屋权界线。
7.2.7图面检查与图廓整饰
分丘图的图廓位置, 根据该丘所有位置确定, 图上需要注出西南角的坐标值, 以公里数为单位注记至小数后三位。
7.3 房产分户图的绘制
7.3.1分户图的主要用途
分户图是在分丘图基础上绘制的细部图, 以一户产权人为单位, 表示房屋权 属范围的细部图, 以明确异产毗连房屋的权利界线供核发房屋所有权证的附图使 用。
7.3.2分户图的技术要求
7.3.2.1 分户图的方位应使房屋的主要边线与图框边线平行,按房屋的方向横放 或竖放,并在适当位置加绘指北方向符号。
7.3.2.2 分户图的幅面可选用 787mm ×1092mm 的 1/32~1/16等尺寸。
7.3.2.3 分户图的比例尺一般为 1:200,当房屋图形过大或过小时,比例尺可适 当放大或缩小。
7.3.2.4 分户图上房屋的丘号、幢号、应与分丘图上的编号一致。房屋边长应实 际丈量,注记取至 0.01m ,注在图上相应位置。
7.3.3分户图应表示的主要内容
分户图表示的主要内容包括房屋权界线、 四面墙体的归属和楼梯、 走道等部 位以及门牌号、所在层次、户号、室号、房屋建筑面积和房屋边长等。
7.3.4分户图上的文字注记。
7.3.4.1 房屋产权面积包括套内建筑面 2积和共有分摊面积, 标注在分户图框内。 7.3.4.2 本户所有丘号、户号、幢号、结构、层数、层次标注在分户图框内。 7.3.4.3 楼梯、走道等共有部位,需在范围内加简注。
7.3.5墙体归属与周邻关系的表述
房屋权界线,包括墙体、归属的表示按 GB/T17986. 2执行。
7.3.6图面整饰
图面整饰按 GB/T GB/T17986. 2执行,文字注记应相对集中。
7.4 房产图的绘制方法
7.4.1全野外采集数据成图
利用全站仪或经纬仪测距仪、 电子平板、 电子记事簿等设备在野外采集的数 据,通过计算机屏幕编辑,生成图形数据文件,经检查修改,准确无误后,可通 过绘图仪绘出所需成图比例尺的房产图。
7.4.2航摄像片采集数据成图
将各种航测仪量测的测图数据, 通过计算机处理生成图形数据文件; 在屏幕 上对照调绘片进行检查修改。 对影像模糊的地物, 被阴影和树林遮盖的地物及摄 影后新增的地物应到实地检查补测。 待准确无误后, 可通过绘图仪按所需成图比 例尺绘出规定规格的房产图。
7.4.3野外解析测量数据成图
利用正交法、交会法等采集的测图数据通过计算机处理,编辑成图形文件。 在视屏幕上,对照野外记录草图检查修改,准确无误后,可通过绘图仪,绘出所 需规格的房产图,或计算出坐标,展绘出所需规格的房产图。
7.4.4平板仪测绘房产图
平板仪测绘是指大平板仪(或小平板仪)配合皮尺量距测绘。
7.4.4.1 测站点点位精度相对于邻近控制点的点位中误差不超过图上±0.3mm 。 7.4.4.2 当现有控制不能满足平板测图控制时,可布设图根控制。图根控制点相 对于起算点的点位中误差不超过图上±0.1mm 。
7.4.4.3 采用图解交会法测定测站点时,前、侧方交会不得少于三个方向,交会 角不得小于 30°或大于 150°,前、侧方交会的示误三角形内切圆直径应小于 图上 0.4mm 。
7.4.4.4 平板仪对中偏差不超过图上 0.05mm 。
7.4.4.5 平板仪测图时,测图板的定向线长度不小于图上 6cm ,并用另一点进行 检校偏差不超过图上 0.3mm 。
7.4.4.6 地物点测定,其距离一般实量。使用皮尺丈量时,最大长度 1:500测图 不超过 50m 。 , 1:1000测图不超过 75m ,采用测距仪时,可放长。
7.4.4.7 采用交会法测定地物点时,前、侧方交会的方向不应少于三个,其长度 不超过测板定向距离。
7.4.4.8 原图的清绘整饰根据需要和条件可采用着色法、刻绘法。各项房产要素 必须按实测位置或底图位置准确着色(刻绘) ,其偏移误差不超过图上 0.1mm 。 各种注记应正确无误,位置恰当,不压盖重要地物。着色线条应均匀光滑,色浓 饱满;刻绘线应边缘平滑、光洁透亮,线划粗细、符号大小,应符合图式规格和 复制的要求。
7.4.5编绘法绘制房产图
房产图根据需要可利用已有地形图和地籍图进行编绘。作为编绘的已有资 料,必须符合本规范实测图的精度要求,比例尺应等于或大于绘制图的比例尺。 编绘工作可在地形原图复制或地籍原图复制的等精度图 (以下简称二底图) 上进 行,其图廓边长,方格尺寸与理论尺寸之差不超过 7.1.3.1表中的规定。补测应 在二底图上进行,补测后的地物点精度应符合 3.2.3的规定。
补测工作结束后, 将调查成果准确转绘到二底图上, 对房产图所需的内容经过清 绘整饰, 加注房产要素的编码和注记后, 编成分幅图底图。 底图的清绘整饰要求 按 7.4.4.8规定执行。
GB/T 17986.1---2000
8房产面积测算
8.1 一般规定
8.1.1房产面积测算的内容
面积测算系指水平面积测算。 分为房屋面积和用地面积测算两类, 其中房屋 面积测算包括房屋建筑面积、共有建筑面积、产权面积、使用面积等测算。 8.1.2房屋的建筑面积
房屋建筑面积系指房屋外墙 (柱) 勒脚以上各层的外围水平投影面积, 包括 阳台、挑廊、地下室、室外楼梯等,且具备有上盖,结构牢固,层高 2.20m 以上 (含 2.20m )的永久性建筑。
8.1.3房屋的使用面积
房屋使用面积系指房屋户内全部可供使用的空间面积, 按房屋的内墙水平投 影计算。
8.1.4房屋的产权面积
房屋的产权面积系指产权主依法拥有房屋所有权的房屋建筑面积。房屋产 权面积由直辖市、市、县房地产行政主管部门登记确权认定。
8.1.5房屋的共有建筑面积
房屋共有建筑系指各产权主共同占有或共同使用的建筑面积。
8.1.6面积测算的要求
各类面积测算必须独立测算两次, 其较差应在规定的限差以内, 取中数作为 最后结果。
量距应使用经检定合格的卷尺或其他能达到相应精度的仪器和工具。 面积以 平方米为单位,取至 0.01m 2。
8.2 房屋建筑面积测算的有关规定
8.2.1计算全部建筑面积的范围
a ) 永久性结构的单层房屋,按一层计算建筑面积;多层房屋按各层建筑面 积的总各计算。
b ) 房屋内的夹层、插层、技术层及其梯间、电梯间等其高度在 2.20m 以上 部位计算建筑面积。
c ) 穿过房屋的通道,房屋内的门厅、大厅,均按一层计算面积。门厅、大
厅内的回廊部分,层高在 2.20m 以上的,按其水平投影面积计算。 d ) 楼梯间、电梯(观光梯)井、提物井、垃圾道、管道井等均按房屋自然 层计算面积。
e ) 房屋天面上,属永久性建筑,层高在 2.20m 以上的楼梯间、水箱间、电 梯机房及斜面结构屋顶高度在 2.20m 以上的部位,按其外围水平投影面 积计算。
f ) 挑梯、全封闭的阳台按其外围水平投影面积计算。
g ) 属永久性结构有上盖的室外楼梯,按各层水平投影面积计算。
h ) 与房屋相连的有柱走廊,两房屋间有上盖和柱的走廊,均按其柱的外围 水平投影面积计算。
i ) 房屋间永久性的封闭的架空通廊,按外围水平投影面积计算。
j ) 地下室、 半地下室及其相应出入口, 层高在 2.20m 以上的, 按其外墙 (不 包括采光井、防潮层及保护墙)外围水平投影面积计算。
k ) 有柱或在围护结构的门廊、门斗,按其柱或围护结构的外围水平投影面 积计算。
l ) 玻璃幕墙等作为房屋外墙的,按其外围水平投影面积计算。
m )属永久性建筑有柱的车棚、货棚等按柱的外围水平投影面积计算。 n ) 依坡地建筑的房屋, 利用吊脚做架空层, 有围护结构的, 按其高度在 2.20m 以上部位的外围水平面积计算。
o) 有伸缩缝的房屋,若其与室内相通的,伸缩缝计算建筑面积。
8.2.2计算一半建筑面积的范围
a ) 与房屋相连有上盖无柱的走廊、檐廊,按其围护结构外围水平投影面积 的一半计算。
b ) 独立柱、单排柱的门廊、车棚、货棚等属永久性建筑的,按其上盖水平 投影面积的一半计算。
c ) 未封闭的阳台、挑廊,按其围护结构外围水平投影面积的一半计算。
d ) 无顶盖的室外楼梯按各层水平投影面积的一半计算。
e ) 有顶盖不封闭的永久性的架空通廊,按外围水平投影面积的一半计算。
8.2.3不计算建筑面积的范围
a ) 层高小于 2.20m 以下的夹层、插层、技术层和层高小于 2.20m 的地下室 和半地下室。
b ) 突出房屋墙面的构件、配件、装饰柱、装饰性的玻璃幕墙、垛、勒脚、 台阶、无柱雨篷等。
c ) 房屋之间无上盖的架空通廊。
d ) 房屋的天面、挑台、天面上的花园、泳池。
e ) 建筑物内的操作平台、 上料平台及利用建筑物的空间安置箱、 罐的平台。
f ) 骑楼、过街楼的底层用作道路街巷通行的部分。
g ) 利用引桥、高架路、高架桥、路面作为顶盖建造的房屋。
h ) 活动房屋、临时房屋、简易房屋。
i ) 独立烟囱、亭、塔、罐、池、地下人防干、支线。
j ) 与房屋室内不相通的房屋间伸缩缝。
8.3 用地面积测算
8.3.1用地面积测算的范围
用地面积以丘为单位进行测算, 包括房屋占地面积、 其他用途的土地面积测 算,各项地类面积的测算。
8.3.2下列土地不计入用地面积:
a ) 无明确使用权限的冷巷、巷道或间隙地。
b ) 市政管辖的道路、街道、巷道等公共用地。
c ) 公共使用的河涌、水沟、排污沟。
d ) 已征用、划拨或者属于原房地产证记载范围,经规划部门核定需要作市 政建设的用地。
e ) 其他按规定不计入用地的面积。
8.3.3用地面积测算的方法
用地面积测算可采用坐标解析计算、实地量距计算和图解计算等方法。 8.4 面积测算的方法与精度要求
8.4.1坐标解标法
a )根据界址点坐标成果表上数据,按下式计算面积。
S=∑=-+-n
i i i i Y Y X 1
11) (21 ????????(18) 或 S=∑=+--n
i i i i X X Y 1
11) (21 ????????(19) 式中:S ——面积, m 2 ;
X i ——界址点的纵坐标, m ;
Y i ——界址点的横坐标, m ;
n ——界址点个数;
i ——界址点序号,按顺时针方向顺编。
b) 面积中误差按下式计算。
∑=+-±=n i i i j s D m m 1
21, 181 ????????(20) 式中:m s ——面积中误差, m 2;
m j ——相应等级界址点规定的点位中误差, m ;
1, 1+-i i D ——多边形中对角线长度, m 。
8.4.2 实地量距法
a ) 规则图形,可根据实地丈量的边长直接计算面积;不规则图形,将其分
割成简单的几何图形,然后分别计算面积。
b ) 面积误差按 3. 2. 6规定计算,其精度等级的使用范围,由各城市的房
地产行政主管部门根据当地的实际情况决定。
8.4.3 图解法
图上量算面积,可选用求积仪法、几何图形法等方法。图上面积测算均应 独立进行两次。
两次量算面积较差不得超过下式规定:
S M S 0003. 0±=? ???????? (21)
式中:ΔS ——两次量算面积较差, m 2;
S ——所量算面积, m 2;
M ——图的比例尺分母。
使用图解法量算面积时, 图形面积不应小于 5cm 2。 图上量距应量至 0.2mm 。 9变更测量
9.1 一般规定
9.1.1变更测量的分类
变更测量分为现状变更和权属变更测量。
9.1.2现状变更测量内容
a ) 房屋的新建、拆迁、改建、扩建、房屋建筑结构、层数的变化;
b ) 房屋的损坏与灭失,包括全部拆除或部分拆除、倒塌和烧毁;
c ) 围墙、栅栏、篱笆、铁丝网待围护物以及房屋附属设施的变化;
d ) 道路、广场、河流的拓宽、改造,河、湖、沟渠、水塘等边界的变化;
e ) 地名、门牌号的更改;
f ) 房屋及其用地分类面积增减变化。
9.1.3权属变更测量内容
a) 房屋买卖、交换、继承、分割、赠与、兼并等引起的权属的转移;
b) 土地使用权界的调整,包括合并、分割、塌没和截弯取直;
c) 征拨、出让、转让土地而引起的土地权属界线的变化;
d ) 他项权利范围的变化和注销。
9.1.4变更测量的程序
变更测量应根据房地产变更资料, 先进行房地产要素调查, 包括现状、 权属 和界址调查, 再进行分户权界和面积的测定, 调整有关的房地产编码, 最后进行 房地产资料的修正。
9.2 变更测量的方法
9.2.1变更测量方法的选择
a) 变更测量应根据现有变更资料, 确定变更范围, 按平面控制点的分布情况, 选择变更方法。
b) 房地产的合并和分割, 应根据变更登记文件, 在当事人或关系人到现场指 界下,实地测定变更后的房地产界址和面积。
c) 修测之后,应对现有房产、地籍资料进行修正与处理。
9.2.2变更测量的基准
a ) 变更测量以变更范围内平面控制点和房产界址点作为测量的基准点。所 有已修测过的地物点为得作为变更测量的依据。
b ) 变更范围内和邻近的符合精度要求的房角点,也可作为修测的依据。 9.2.3变更测量的精度要求
a) 变更后的分幅、 分丘图图上精度, 新补测的界址点的精度都应符合本规范 的规定。
b) 房产分割后各户房屋建筑面积之和与原有房屋建筑面积的不符值应在限 差以内。
c) 用地分割后各丘面积之和与原丘面积的不符值应在限差以内。
d) 房产合并后的建筑面积, 取被合并房屋建筑面积之和; 用地合并后的面积, 取被合并的各丘面积之和。
9.2.4变更测量的业务要求
a) 变更测量时, 应做到变更有合法依据, 对原已登记发证而确认的权界位置 和面积等合法数据和附图不得随意更改。
b) 房地产合并或分割, 分割应先进行房地产登记, 且无禁止分割文件, 分割 处必须有固定界标; 位置毗连且权属相同的房屋及其用地可以合并应先进 行房地登记。
c) 房屋所有权发生变更或转移,其房屋用地也应随之变更或转移。
9.3 房地产编号的变更与处理
9.3.1丘号
a) 用地的合并与分割都应重新编丘号, 新增丘号。 按编号区内的最大丘号续 编。
b) 组合丘内,新增丘支号按丘内的最大丘支号续编。
9.3.2界址点、房角点点号
新增的界址点或房角点的点号, 分别按编号区内界址点或房角点的最大点号 续编。
9.3.3幢号
房产合并或分割应重新编幢号,原幢号作废,新幢号按丘内最大幢号续编。
10成果资料的检查与验收
10.1 一般规定
10.1.1成果检查、难收的制度
房产测量成果实行二级检查一级验收制。 一级检查为过程检查, 在全面自检、 互查的基础上, 由作业组的专职或兼职检查人员承担。 二级检查由施测单位的质 量检查机构和专职检查人员在一级检查的基础上进行。
10.1.2检查、验收中问题的登记和处理
各级检查验收中发现的问题,必须做好记录并提出处理意见。
10.1.3检查、验收报告书
10.1.3.1 检查验收工作应在二级检查合格后由房产测绘单位的主管机关实施。 二 级检查和验收工作完成后应分别写出检查、验收报告。
10.1.3.2 产品成果最终验收工作由任务的委托单位组织实施。 验收工作结束后应 写出检查报告和验收书。
10.1.4上交成果资料内容
a ) 房产测绘技术设计书。
b ) 成果资料索引及说明。
c ) 控制测量成果资料。
d ) 房屋及房屋用地调查表、界址点坐标成果表。
e ) 图形数据成果和房产原图。
f ) 技术总结。
g ) 检查验收报告。
10.2 检查、验收项目及内容
10.2.1控制测量
a ) 控制测量网的布设和标志埋设是否符合要求。
b ) 各种观测记录和计算是否正确。
c ) 各类控制点的测定方法、 扩展次数及各种限差、 成果精度是否符合要求。
d ) 起算数据和计算方法是否正确,平差的成果精度是否满足要求。
10.2.2房产调查
a ) 房 产要素调查的内容与填写是否齐全、正确。
b )调查表中有用地略图和房屋权界线示意图上的用地范围线、 房屋权界线、 房屋四面墙体归属,以及有关说明、符号和房产图上是否一致。
10.2.3房产要素测量
a )房产要素测量的测量方法、记录和计算是否正确。
b )各项限差和成果精度是否符合要求。
c )测量的要素是否齐全、准确,对有关地物的取舍是否合理。
10.2.4房产图绘制
a ) 房产图的规格尺寸,技术要求,表述内容,图廓整饰等是否符合要求。
b ) 房地产要素的表述是否齐全、正确,是否符合要求。
c ) 对有关地形要素的取舍是否合理。
d ) 图面精度和图边处理是否符合要求。
10.2.5面积测算
a ) 房产面积的计算方法是否正确,精度是否符合要求。
b ) 用地面积的测算是否正确,精度是否符合要求。
c ) 共有与共用面积的测定和分摊计算是否合理。
10.2.6变更与修测成果的检查
a ) 变更与修测的方法,测量基准、测绘精度等是否符合要求。
b ) 变更与修测后房地产要素编号的调整与处理是否正确。
10.3 成果质量的评定
10.3.1成果质量评定等级
成果质量实行优级品、良级品和合格品三级评定。
10.3.2成果质量评定标准
10.3.2.1 成果质量由专职或兼职检查验收人员评定。
10.3.2.2 成果质量评定标准,可参照 CH1003执行。
附 录 A (标准的附录) 房屋、房屋用地调查表与分类
A1 《房屋调查表》格式示例(见表 A1)
A2 《房屋用地调查表》格式示例(见表 A2) A3 房屋用地用途分类(见表 A3)
A4 房屋产别分类(见表 A4)
A5 房屋建筑结构分类(见表 A5)
A6 房屋用途分类(见表 A6)
附 录 B
(提示的附录)
成套房屋的建筑面积和共有共用面积分摊
B1 成套房屋建筑面积的测算
B1.1 成套房屋的建筑面积
成套房屋的套内建筑面积由套内房屋的使用面积, 套内墙体面积, 套内阳台 建筑面积三部分组成。
B1.2 套内房屋使用面积
套内房屋使用面积为套内房屋使用窨的面积, 以水平投影面积按以下规定计 算:
a ) 套 内使用面积为套内卧室、起居室、过厅、过道、厨房、卫生间、厕所、 贮藏室、壁柜等空间面积的总和。
b )套内楼梯按自然层数的面积总和计入使用面积。
c ) 不 包括在结构面积内的套内烟囱、通风道、管道井均计入使用面积。
d )内墙面装饰厚度计入使用面积。
B1.3 套内墙体面积
套内墙体面积是套内使用窨周围的维护或承重墙体或其他承重支撑体所占 的面积, 其中各套之间的分隔墙和套与公共建筑窨的分隔墙以及外墙 (包括山墙) 等共有墙, 均按水平投影面积的一半计入套内墙体面积。 套内自有墙体按水平投 影面积全部计入套内墙体面积。
B1.4 套内阳台建筑面积
套内阳台建筑面积按 8.2的规定计算。
套内阳台建筑面积均按阳台外围与房屋外墙之间的水平投影面积计算。 其中 封闭的阳台按水平投影全部计算建筑面积, 未封闭的阳台按水平投影的一半计算 建筑面积。
B2 共有共用面积的处理和分摊公式
B2.1 共有共用面积的内容
范文二:工程测量监理细则(最新版)
目 录
一.
二.
三.
四.
五.
六.
工程概况------------------------------------------------------------1 编制依据------------------------------------------------------------2 专业工程特点--------------------------------------------------------2 监理工作流程--------------------------------------------------------3 监理工作要点--------------------------------------------------------5 监理工作方法及措施--------------------------------------------------9
工程测量监理实施细则
一、工程概况:
1、项目名称:******
2、建设单位:******
3、设计单位:******
4、施工单位:******
5、建设地点:******
6、总建筑面积:约15.56万平方米
7、栋数、层数:******项目工程共14个单位工程,包括12栋住宅、1个地下
车库、1个幼儿园,整个基坑工程平面形状呈梭镖形状,基坑东西长约470m,南
北侧宽130m,开挖深度为2-9.4m。整个项目划分为两个标段,由******承建的
二标段,包含4~7#楼、11#、12#楼、标段划分线以西的车库,总建筑面积79537.40
平方米。
4#楼、5#楼建筑面积均为6922.36㎡,建筑高度为55.5m,,建筑主体地上
18层住宅,分一个单元2户,地下2层,使用功能为储藏室(所存物品为丙、丁、
戊类物品)、电气间、电表间、热表间。屋顶为平屋顶,楼梯间均可出屋面,阳
台为封闭阳台。地下工程防水等级为二级。耐火等级为二级。
6#楼建筑面积为14229.14㎡,建筑高度为88.9m,,建筑主体地上28层住
宅,分一个单元2户,地下2层,使用功能为储藏室(所存物品为丙、丁、戊类
物品)、电气间、电表间、热表间。屋顶为平屋顶,楼梯间均可出屋面,阳台为
封闭阳台。地下工程防水等级为二级。耐火等级为二级。
7#楼建筑面积为14216.27㎡,建筑高度为88.9m,,建筑主体地上28层住
宅,分一个单元2户,地下2层,使用功能为储藏室(所存物品为丙、丁、戊类
物品)、电气间、电表间、热表间。屋顶为平屋顶,楼梯间均可出屋面,阳台为
封闭阳台。地下工程防水等级为二级。耐火等级为二级。
11#楼、12#楼建筑面积均为10773.61㎡,建筑高度为55.5m,建筑主体地
上18层住宅,地下2层,使用功能为储藏室(所存物品为丙、丁、戊类物品)、
电气间、电表间、热表间。分两个单元每单元2户。屋顶为平屋顶,楼梯间均可
出屋面,两单元楼梯间可通过屋面相连通阳台为封闭阳台。地下工程防水等级为
二级。耐火等级为二级。
二标段车库(含配套商业)建筑面积为15700.05㎡,地下两层,其中地下
二层为人防工程。
8、结构类型:车库为框架结构;主楼均为剪力墙结构。
9、计划工程总投资:约6亿元
10、计划开工工期:2014年09月24日
11、计划竣工日期:2016年10月14日
12、工程总工期:752日历天
13、合同质量等级:7#、12#楼合格。4#、5#、6#、11#楼确保泉城杯, 4#楼确
保泰山杯。
二、编制依据
1、本项目工程已批准的监理规划。
2、******工程的设计图纸
3、******工程施工组织设计
4、******工程委托监理合同
5、规范、规程:
5.1《建筑工程施工验收统一标准》GB50300—2013
5.2《工程测量规范》GB50026—2007
5.3国家和地方现行法律法规及其它强制性标准
三、专业工程特点:
本工程建筑工程测量的特点主要体现在:时效性、精度性、综合性三方面。
1、时效性:工程测量时效性较强,作业环境复杂,涉及的其他专业知识较多,
对测量人员的专业知识和技术能力要求较高。比如基坑测量通常是配合降水和开
挖过程,具有鲜明的时间性,测量结果往往是动态变化的,几小时前的测量结果
都有可能失去直接的意义,测量工作需随时进行,具有明显的时效性。
2、精度性:工程测量的精度需要根据具体的工程性质和要求而定;不同于普通
测量的精度要按统一的规范进行。通常普通测量误差限值在数毫米内,而工程测
量多需要特殊的高精度仪器,来保证达到更高的精度。
3、综合性:工程测量的控制点在点位的选择和标志的构造等方面要不同于一般
的控制点。需要充分考虑到具体工程使用方便而又便于保存的情况下设置,综合性较强。
四、监理工作流程
1、建筑施工测量质量监理
1.1监理工作流程
建筑工程测量监理的任务,就是要监督承包人将建筑总平面图上所设计的建筑物、构筑物的位置,按照设计要求,测设到施工现场,正确地定到地面上。为防止测量放线发生差错,给工程带来损失,监理工程师首先要审查其测量放线方案,在经监理审核后,按方案实行。其次,要求承包人一切定位放线工作要先自检、互检,合格后再提请监理人员验线。
1.1.1施工测量工艺流程
测量仪器检定和检效→校测起始依据→场地平整测量→场地控制网测设→建筑物的定位放线→基础放线→建筑物的竖向控制→建筑物的沉降观测。
1.1.2建筑施工测量监理的工作流程表
一般
房
屋建筑直
接
进
行
位
放
线 定
(建筑施工测量监理的工作流程图)
五、监理工作要点
1、检查测量仪器的检定和检校
测量所用的仪器和钢尺,必须根据国家的《记量法实施细则》规定,在使用前7~10天,送当地计量器具检定部门进行检定。检定合格,方可使用。承包人应向计量工程师提交检定合格证的复印件。
1.1经纬仪和水准仪的检定和检效
根据《经纬仪检定规程》和《水准仪检定规程》的规定,经纬仪和水准仪的检定周期根据使用情况,前者为1~3年,后者为1~2年。在该检定周期内,每2~3月还需对主要轴线关系进行检校,以保证观测精确度。
1.2钢尺的检定
根据《钢卷尺检定规程》(JJG4-89)规定,钢尺的检定周期为一年。
对于精度要求较高的工程,如大型工矿企业建筑、公共建筑、高层建筑,一般应使用Ⅰ级钢尺。
2、校测起始依据
起始依据是附近原有建(构)筑物,应与业主、设计单位、承包人共同在现场,对定位依据的建筑物的边、角、中线、标高等具体位置,进行明确的指定和确认,以防发生差错。
2.1校测水准点
由设计单位给定的水准点是向现场引测标高控制点的依据。若设计单位只能提供一个水准点(或标高依据点),监理工程师直接或间接通过业主请设计单位负责保证其正确性一般设计单位至少提供两个水准点,此时,监理工程师就要求承包人或会同承包人用往返测法测定其高差。若所测高差平均值与已知高差值小于±5mm时(n为测站数),可认定所给水准点及其标高正确,准予使用。若校测中发现问题,监理工程师应与设计单位或城市规划部门联系,妥善处理,办好手续后,方允许使用。本工程中由测绘院提供一个水准点TP1,采用三角高程方法以TP1为基准引测至施工单位临时水准控制点。
3、场地平整测量监理
场地平整测量是承包人在施工前实测场地地形,按竖向规划场地平整,测设场地控制网和对建筑物定位放线的一项工作。场地平整测量需要在测设图纸上签署意见。承包人在平整场地时,据此计算填土的土方量,作为该项土方工程结算的依据。
4、场地控制网测设的监理
场地控制网包括平面控制网和标高控制网。它是整个场地内各幢建筑物和构筑物平面、标高定位以及高层建筑竖向控制的基本依据。监理工程师要监督承包人准确地测定与保护好场地控制网,首先要审核承包人的场地控制网测设方案,然后,在承包人控制网测定、自检合格后,进行验线。
4.1场地平面控制网应均布全场区,控制线间距要适宜。控制网必须包括:作为场地定位的起始点和起始边;建筑物的对称轴和主要轴线;弧形建筑物的圆心点和直径方向;电梯井的主要轴线等。
4.2场地平面控制网的网形,应适合和满足整个场地建筑物测设的需要。控制点之间应通视、易丈量,且便于长期保留。
4.3一般建筑物附近要设两个水准点或者±0.000水平线,高层建筑附近至少设置三个水准点或±0.000水平线。在整个场地内施测时,要能同时后视到两个水准点。场地内几个水准点应构成闭合图形,以便于闭合校核。
4.4各水准点点位要设在建筑物开挖和地面沉降范围以外,水准点桩的构造及埋设应规范,以便长期保留。
5、场地平面控制网的检测
承包人要按监理工程师批准的方案测设场地平面控制网。一般以设计给定的一个红线桩的点位和一条红线边的方向为准进行测设。承包人将控制网测定、自检合格后,应发出验线通知单,同时提交整体网形的闭合校核和局部校核资料。监理工程师分析测设资料后,为慎重起见,还应实地校测。验线合格,签证认可后,方允许其正式使用该场地控制网。
6、精度要求
Ⅰ II
量距精度。建筑物定位放线的相对中误差(m定)为:m定=1/6000~1/12000,对控制网的相对中误差(m控)和放线的相对中误差(m放)为:m控=m放=1/10000~1/20000相对的测角精度分别为:±20和±10。
1.2.4.4场地标高控制网的检测与精度要求承包人应根据设计指定的已知标高的水准点引测到场地内,测设场地内各幢号水准点或±0.000水平线,以构成场地标高控制网,并接测到另一指定的水准点作为附合校对。闭合差小于±5mm(n为测站数)或±20mm(L为测线长度,以km为单位)为合格,此时可以按测站数成正比例进行闭合差调差。若设计单位只给出一个已知标高的水准点作为起始依据,则可采用往返测法或闭合测法校核。
承包人将标高控制网测设后,自检合格,报请验线。监理工程师检测合格后,保证其正式使用。
7、建筑物定位放线的验线
建筑物的定位放线通常是根据定位条件,先测试一个平行与建筑物并距基槽外1~5米的建筑物距形控制网,网上有建筑物的各中线点和轴线点。基础开挖后,即可据此恢复建筑物的中线和轴线。
承包人根据建筑物各轴线桩或控制桩,按基础图撒好基槽灰线,自检合格后,报请监理工程师验线。验线时,首先要检查定位依据的正确性和定位条件的几何尺寸,再检查建筑物距形控制网、建筑物四廓尺寸以及轴线间距,最后要检查各轴线,特别是主轴线的控制桩(引桩)桩位是否准确和稳定。验线合格,签证认可。沿规划红线兴建的建筑物,还需要请城市规划部门验线,验线合格,方可破土动工。
8、建筑物基础放线的验线
当基础垫层浇筑后,承包人在垫层上必须准确地测定建筑物各轴线、边界线、墙宽线和桩位线等。自检合格后,书面通知监理工程师验线。
基础放线是具体确定建筑物的位置,至关主要,验线时必须严格把关。
8.1检查轴线控制网
根据基槽边上的轴线控制桩,确定没有被碰动和位移,才允许使用。其次要检查有无用错轴线桩,当建筑物轴线较复杂时,更应防止用错。
8.2四大角和轴线的检测
根据基槽边上的轴线控制桩,用经纬仪向基础垫层上检查各轴线的投测位置,亦即检查基础的定位,再实地量测四大角和各轴线的相对位置,防止整个基础在基槽内移动错位。
8.3检查垫层顶面的标高
8.4检查验线的允许偏差
长度L≤30m 允许偏差±5mm
30m〈L≤60mm 允许偏差±10mm
60m〈L≤90mm 允许偏差±15mm
90m〈L 允许偏差±20mm
9、高层建筑竖向控制的监理
高层建筑施工对竖向偏差的控制要求很高,轴线竖向投测精度和方法必须与之相适应。这是高层建筑施工测量监理的重点。
承包人在基础工程完成,并校测建筑物轴线控制桩后,将建筑物轮廓和各细部轴线精确地弹测到±0.000首层平面上,随后要将首层轴线逐层向上投测,以用作各层放线和结构竖向控制的依据。对此,监理工程师应进行检测,或在承包人投测时,在旁监测,以保证测量质量。
当施工场地比较宽阔时,可用外控法,利用经纬仪施测。作为检验,还可用吊线坠法作竖向偏差的检测。
当施工场地比较窄小,无法在建筑物之外的轴线上安装经纬仪施测时,可用内控法,例如用激光铅值仪施测。
层间竖向测量偏差不应超过±3mm,建筑全高(Ⅱ)竖向测量偏差不应超过3H/10000,且不应大于:
30m
60m
90m
10、建筑物沉降观测的检测
建筑物的沉降观测点一般在房屋底层±0.000标高线上,沿房屋纵横轴线、四角及沉降缝两侧设置,按规定埋设永久性观测点。第一次观测应在观测点安置稳固后进行,以后每施工一层,复测一次,直测一次,直到竣工。沉降观测记录属工
程竣工档案之一。
六、监理工作方法及措施
1、施工准备阶段的测量监理方法
1.1测量前应监督对承包单位拟采用的测量仪器(全站仪、经纬仪、水准仪、钢尺等)进行计量检定和校核,确认计量检定合格证是否在有效期内,全部合格后测量仪器方可投入使用,以减少仪器的测量误差;并监督承包单位校核测量配套工具,如标尺刻线、丈量长度所用卷尺的精度。
1.2检查承包单位专职测量人员的岗位证书;检查承包单位是否准备好不同测量内容所用的测量记录表。
1.3根据测量控制桩移交依据对承包单位进行测量控制桩移交,并监督承包单位进行共同复核。首先要检查判明测量用的原始点是否已被破坏,确认无误,再进行技术复核,复核后能达到测量精度要求时移交各方共同在《测量控制桩移交与复核记录》(附表1)上签字认可。测量控制桩是一个建筑工程建设的基础,因此,专业监理工程师必须认真审查、复核,移交与复核记录必须经总监理工程师签字确认,这样的程序绝对不能省去。
如果测量控制桩是政府主管部门的直接移交的规划放线成果,也应该注意征得建设单位的签字确认。
1.4测量前应要求承包单位根据工程项目的实际情况编制可行的测量方案,由于测量方案关系到工程测量精度,因此,测量方案应由承包单位技术负责人审核确认,并由专业监理工程师签署意见。
2、施工过程的测量监理方法
建筑工程施工阶段测量监理工作应该注意以下几方面的内容:
2.1建筑测量施工控制网(建筑方格网)的监理
2.1.1建筑测量施工控制网建立的要求
建筑施工测量控制网,在新建的大中型建筑场地上,一般布置成正方形或矩形的格网(称建筑方格网),对于扩建工程或改建工程,由于建立方格网有困难,一般采用导线网作为施工控制网。
为了便于设计和施工放样,建筑施工通常采用建筑坐标系(亦称施工坐标系),其坐标轴与建筑主轴线相一致或平行。
2.1.2监理工程师如何审查、复核建筑施工测量控制网
施工控制网(建筑方格网)是一个建筑工程建设的基础。因此,监理工程师在审查、复核时,必须事先自己制定一套完整的审查、复核的程序,不能简单沿用施工单位的顺序。只有这样,才能发现施工单位布设施工控制网存在的偏差和错误,并及时纠正。同时,监理工程师要参照《工程测量规范》(GB50026-2007)严格对施工单位的测量仪器设备的精度和校定情况、测量数据的精度情况进行核查,使其符合规范要求。一般监理工程师审查、复核建筑施工测量控制网(建筑方格网)可按下面步骤进行:
①审查建筑方格网的布置情况:审查建筑方格网的布置是否根据建筑设计总平面图上各建筑物和构筑物布设,并结合现场的地形情况拟定的;方格网布置时,是否将方格网的主轴线应布设在整个场地的中部,并与总平面上所设计的主要建筑物的基本轴线相平行;方格网的转折角是否严格成90度;方格网的边长的相对精度视工程要求而定,一般为1/10000~1/20000;控制点用桩的位置应选在不受施工影响并能长期保存处。
②重点复核建筑方格网的主轴线:即主轴线的定位是否根据测量控制点来测设的;计算结果要认真进行复核、对照。
③在主轴线测定以后,监理工程师可详细测设复核方格网。详细测设复核方法一般根据主轴线四个端点通过交会定出方格四个角点(可用混凝土桩标定),构成“田”字形的各个格点作为基本点,再以基本点为基础,按角度交会方法或导线测量方法测设复核方格网中所有角点(可用木桩或混凝土桩标定)。
④审查、复核后能达到测量精度要求时各方共同在《工程施工定位(控制)放线测量记录》上签字认可。
2.2建筑施工测量定位放线监理
建筑施工测量定位放线主要包括基础施工和主体施工测量定位放线:
2.2.1基础施工测量定位放线。主要工作有基槽挖土的放线和抄平、基础施工的放线和抄平。对于基槽挖土,监理工程师检查主要内容是控制基槽开挖深度,一般可在基槽挖到一定深度后,用水准仪在壁上每隔2~3m和拐角处设置一些水平的小木桩(水平桩:标高误差控制±10mm),这些木桩可作为清理槽底和铺设垫层的依据,待土方挖完后,再根据控制桩复核基槽宽度和标高,合格后,可允
许施工单位进行垫层施工。基础施工在轴线投设时,如建筑物精度要求较高,应用经纬仪投点,再按设计尺寸要求进行复核,标高可直接在模板定出标高控制线,监理工程师应根据水准点进行复核。
2.2.2建筑主体施工定位放线。在施工测量中,由于地面施工部分测量精度要求较高,主体施工部分场地较小,测量工作条件受到限制,并且容易受到施工干扰,因此,监理工程师在审查、复核时应着重注意施工测量的方法是否有针对性及符合规范要求和所用的仪器是否适用、匹配。
主体建筑的平面控制网布设于地坪层(底层),其形式一般为一个矩形或若干个矩形,且布设于建筑物内部,以便逐层向上投影,控制各层的细部(墙、柱、电梯井筒、楼梯等)的施工放样。平面控制点一般为埋设于地坪层地面混凝土上面的一块小铁板,上面划十字线,交点上冲一小孔,代表点位中心。监理工程师在审查、复核时应先检查平面控制点点位的选择是否与建筑物的结构相适应,审查、复核的具体监理要点包括:矩形控制网的各边应与建筑轴线相平行;建筑物内部的细部结构(主要是柱和承重墙)不妨碍控制点之间的通视;控制点向上层作垂直投影时,要在各层楼板上设置垂准孔,因此,通过控制点的铅垂方向应避开横粱和楼板中的主钢筋。然后对平面控制网进行检查、复核并测设,一般平面控制网的距离测量精度不应低于1/10000,矩形角度测设的误差不应大于±10mm。同时,要求施工单位注意控制点在结构和外墙施工期间妥善保护。
主体建筑施工的高程控制网为建筑场地内的一组水准点。待建筑物基础和地坪层建造完成后,在墙上或柱上从水准点测设“一米标高线”(标高为十1.000m)或“半米标高线”(标高为十0.500m),作为向上各层测设设计高程之用。监理工程师应首先检查建筑场地内的一组水准点数量(不少于3个),然后复核测设“一米标高线”或“半米标高线”是否符合要求。
在主体建筑施工中,无论是平面控制点的垂直投影,还是高程传递,对所使用的仪器设备均有一定要求,监理工程师应予以控制:垂准仪可以用于各种层次的平面控制点的垂直投影。如用经纬仪(加装直角目镜)作控制点的垂直投影,一般用于10层以下的建筑物。高程传递一般可采用钢卷尺垂直丈量法和全站仪天顶测距法进行,对于精度要求高的高层、超高层建筑应使用全站仪进行高程传递。各种仪器使用技术要求应符合工程测量规范(GB50026-2007)规定。
主体建筑结构细部(外墙、承重墙、立柱、电梯并筒、粱、楼板、楼梯等及各种预埋件)测设很重要,特别是复杂的平面结构,监理工程师应重点进行控制:首先应审查施工单位编制的测量方案(是否经过计算),再检查其实施情况。同时,监理工程师通过计算制定相应监理实施控制细则再予以复核、测设,一般对每层建筑结构细部可根据平面控制点用经纬仪和钢卷尺极坐标法、距离会交法、直角坐标法等复核测设其平面位置,根据一米标高线用水准仪复核测设其标高。
2.2.3审查、复核后能达到测量精度要求时各方共同在《工程施工定位(控制)放线测量记录》上签字认可。
2.3建筑工程变形测量的监理
2.3.1建筑工程变形观测点的设置要求
建筑物沉降观测是建筑工程施工阶段变形观测的重点。建筑物的沉降观测是根据基准点进行的。沉降观测的基准点是2~3个埋设于建筑沉降影响范围以外的水准点,与城市水准点连测后,获得基准点的高程,它们之间的高差应经常用水准测量检核,以确定其高程的稳定性。
基准点与沉降观测点不能相距太远,一般应在100m范围以内。进行变形观测的建筑物上,应埋设沉降观测点。观测点一般是沿建筑外围均匀布设,埋在荷载有变化的部位、平面形状改变处、沉降缝两侧、有代表性的支柱和基础上,应加设沉降观测点。
在沉降观测中,观测时间、方法和精度要求应严格参照《工程测量规范》(GB50026-2007)、《建筑变形测量规程》(JGJ8-2007)标准有关条款要求,为了保证水准测量的精度,观测时,视线长度一般不得超过50m,前、后视距离要尽量相等。
2.3.2监理工程师如何审查、复核沉降观测
①应检查观测点的数量和位置是否全面反映建筑物的沉降情况。
②接着审查施工单位沉降观测的实施方案:包括使用测量设备和精度控制,施工阶段沉降观测的周期和观测时间。一般建筑,可在基础完工后或地下室砌完后开始观测,大型、高层建筑,可在基础垫层或基础底部完成后开始观测。观测次数与间隔时间应视地基与加荷情况而定。民用建筑可每加高1~5层观测一次;工业建筑可按不同施工阶段(如回填基坑、安装柱子和屋架、砌筑墙体、设备安
装等)分别进行观测。如建筑物均匀增高,应至少在增加荷载的25%、50%、75%和100%时各测一次。施工过程中如暂时停工,在停工及重新开工时应各观测一次,停工期间,可每隔2~3个月观测一次。
③检查基准点、沉降观测点的布设是否符合规定要求。观测点应便于立水准尺、观测能够长期保存和不容易受到破坏。
④对施工单位每次沉降观测的数据进行检查复核并签署监理意见,记录格式见《建(构)筑物沉降观测记录》(附表3)。
2.4工程竣工测量的监理
2.4.1工程竣工测量的内容
在施工过程中,由于种种原因,使建(构)筑物竣工后的位置与原设计位置不完全一致,所以,需要进行竣工测量。竣工测量的内容主要有:
①工业厂房及一般建筑物:测定各房角坐标、几何尺寸,各种管线进出口的位置和高程,室内地坪及房角标高,并附注房屋结构层数、面积和竣工时间。 ②地下管线:测定检修井、转折点、起终点的坐标,井盖、井底、沟槽和管顶等的高程,附注管道及检修井的编号、名称、管径、管材、间距、坡度和流向。 ③架空管线:测定转折点、结点、交叉点和支点的坐标,支架间距、基础面标高等。
④交通线路:测定线路起终点、转折点和交叉点的坐标,路面、人行道、绿化带界线等。
⑤特种构筑物:测定沉淀池的外形和四角坐标,圆形构筑物的中心坐标,基础面标高,构筑物的高度或深度等。
2.4.2监理工程师如何审查、复核工程竣工测量
①应检查工程竣工测量是否全面反映建(构)筑物竣工后的位置。注意竣工测量不但测量地面的地物和地貌,还要测量底下各种隐蔽工程,竣工测量的精度一般应该符合竣工图的解析精度。
②对施工单位工程竣工测量数据进行检查复核并签署监理意见,记录格式见《工程竣工测量及复核记录》。
范文三:房产测量规范(最新版)
房产测量规范(最新版)
文件号:GB/T 17986
房 产 测 量 规 范
第1单元:房产测量规定
Specifications for estate surveying—
Unit1:General rules for estate surveying
2000 – 02 – 22 发布
2000 – 08 – 01 实施
国家质量技术监督局 发 布
GB/T 17986.1---2000
目
录
前
言 ??????????????????????????????????????????????????????????????????????????????????????????????? I 1 范
围 ?????????????????????????????????????????????????????????????????????????????????????????????? 1 2 引用标
准 ???????????????????????????????????????????????????????????????????????????????????????? 1 3 总
则 ?????????????????????????????????????????????????????????????????????????????????????????????? 1 4 房产平面控制测
量???????????????????????????????????????????????????????????????????????????? 3 5 房产调
查 ?????????????????????????????????????????????????????????????????????????????????????? 11 6 房产要素测
量 ???????????????????????????????????????????????????????????????????????????????? 17 7 房产图绘
制 ??????????????????????????????????????????????????????????????????????????????????? 26 8 房产面积测
算 ???????????????????????????????????????????????????????????????????????????????? 34 9 变更测
量 ?????????????????????????????????????????????????????????????????????????????????????? 38 10 成果资料的检查与验
收 ?????????????????????????????????????????????????????????????????? 40 附录A(标准的附录) 房屋、房屋用地调查表与分
类 ??????????????????????????? 42 附录B(提示的附录) 成套房屋
的建筑面积和共有共用面积分摊 ???????????? 49
I
GB/T 17986.
范文四:工程测量实验总结(最新版)
工程测量实验总结
工程测量实验总结
工程测量实验总结篇一《工程测量实验心得》 文章简介:《工程测量实习心得》 这周我们土木工程专业进行了一次测量实习,实习前老师给我们开动员会布置了实习任务和注意事项,不知道别人《工程测量实习心得》 文章《工程测量实习心得》正文开始 这周我们土木工程专业进行了一次测量实习,实习前老师给我们开动员会布置了实习任务和注意事项,不知道别人感觉如何,反正我听着特别有压力。我是实际操作型的选手,对于那些理论的东西明显力不从心,所以当迎来第一个实习任务时,我都不知道怎么开始。还好,我们组组员有12个人,经过短暂的商议,我们从整平仪器到使用仪器,从测量到计算,都有非常明确的分工,配合起来相当默契成熟,我们各司其职,效率极其高。为了不出现那一点点错误的数据导致返工,每当在测量的过程中每当遇到困难问题时,我们组总是会停下来进行激烈的讨论,实在不会的就问老师。俺们朱老师也是一位比较和善有学识的老师,各种仪器和测量方案都非常精通,而且每天还会骑着自行车游荡在各个测量地点之间,检查和指正,让我们很有安全感,不怕出现什么比较大的错误。实习虽然只有短短的一周时间,可是通过这次实习我不仅对课本的知识有了更加深刻的认知和理解,更使我懂得了团队合作的重要性,懂得了团结的力量。成功一起分享,困难一起担当,我不敢说我们小组是最优秀的小组,但确是最成功的一个小组,看着其他组三番两次的返工,而我们每次全然一遍成型,回头想想,虽然一站在烈日底下就长达几个小时,但我们擦掉的汗水却是幸福的。我敢这么说,我们组哪怕少一个人,实习的难度都会大大加强一度,正是我们找准了自己擅长的位置默契的配合,才让整个流程简单和顺利。通过这次实习,我学到了测量的实际能力,更有面对困难的忍耐力;上课时完全陌生的水准仪、全站仪,在实习过程中竟然也灵活的掌握了,实在让我感觉兴奋。在对数据的检查和矫正的过程中,我弄清了各种测量误差的来源,大概有三个方面吧:仪器误差(仪器本身所决定,属客观误差来源)、观测误差(由于人员的技术水平而造成,属于主观误差来源)、外界影响误差(受到如温度、大气折射等外界
因素的影响而这些因素又时时处于变动中而难以控制,属于可变动误差来源)。为了减少误差,我们的做工精度就必须严厉加强,每次架仪器时,都要严格的进行整平,差些没把粗略整平当精确整平对待了。还有就是想办法补充知识,以提高自身的工程测量水平,掌握正确的方法,规范操作,降低误差。除 了熟悉了仪器的使用和明白了其原理掌握误差的来源和减少措施,我还掌握了一套科学的测量方法,在测量中要遵循一定的测量原则,如:“从整体到局部”、“先控制后碎部”、“由高级到低级”的工作原则,并做到“步步有检核”。这样做不但可以防止误差的积累,及时发现错误,更可以提高测量的效率及精确度。通过老师的提点以及我们的认真地对待,很多问题我们都迎刃而解,非常感谢这一次实习,为我们提供了一个共同学习,共同进步,团结合作完成一项项目的机会,使我受益匪浅。 工程测量事关重大,而且并不如许多人所想的,手里操作着个全站仪就是工程测量的全部,测量人员的 水平高低,其实更体现在预见能力和谋划能力上。进场后,第一步工作就是联测导线,此时应该先问清楚,设计院的导线是平面坐标还是高斯坐标。高程的获得是用什么方法,是水准还是GPS。第二步工作一般是复核,补充征地线。设计中往往有改线发生,而中国的国情是,设计院放的征地线有时候是改线之前的,这在低等级公路,地形复杂的公路尤其多见,而你进场后,设计院一般是不会再来放线了(虽然这并不符合合同要求,但施工单位是无能为力的)。所以,必须首先和设计院沟通,问清楚设计院放的征地线是否是最终征地线,如果不是,要问清楚设计院哪些路段是改过的,要设计院提供改线后的征地线和原来征地线的对比图表。中国乡村民情复杂,因为征地纠缠不清,严重影响工期的事情比比皆是。第二次,甚至第三次征地放线就关系到老百姓的征地补偿情况,哪怕只是区区几百元,一样可以叫你开不了工。没有设计院的参照资料,不但测量人员会对自己的放样成果产生怀疑,和老百姓也解释不清。第三步工作复测地面线。这步工作变化很多。我想说的是,虽然一般要求是施工单位要测地面线,但是测量人员最好不要贸然动手,因为一旦贸然动手,不但意味着辛辛苦苦的大量工作全部白做,甚至意味着工程量的损失,一定要把各种因素权衡好再下决定,一旦动手,全线的地面
外业,原地面复测资料,横断面绘图,土石方工程数量表就必不可少,工作量极大。在工作开展前,我们要综合考虑这么几个元素:1。公路等级,工程量大小。2。业主的实力,业主的意思。3。本单位人员配备情况。4。估算设计院地面线的准确情况。先看第一个因素,工程量,如果工程量不大,但是线路长,地形又复杂,那么地面线测量工作量很大,价值却不大。再看第二个因素,业主实力,业主的意思:业主如果实力不强,那么很可能不调整设计 方量,换句话说,穷业主你就别做梦他会补你钱了。业主如果对施工单位关于超出设计多少百分比才调整方量的咨询含糊其词,那么也希望渺茫,因为这个百分比他也许永远不会先告诉你。其后果就是,你超出的百分比永远达不到业主的要求。别受业主和监理的唬弄,他们也许会说的很好听,说什么你们只要数据属实,方量是可以考虑的,其实他们真正的想法是:拿到书面的资料备档,并避免以后的纠纷,让施工单位没话说。哪个业主不贪婪,谁不会利用自己的强势地位, 再看第三个因素,人员配备:大型国企可能人员充足,中小企业则人手严重不足,搞测量的人辛苦,所以我劝告大家,无论企业大小,只要是方量不能调整,这步工作走个过场,应付过去就算了。断面图可以复印设计院的,稍微改改。原地面测量结果从设计院图上量就可以了,然后可以发动施工队的人一起弄。至于监理,当路线长地形复杂时,我认为大部分监理是不会全程旁站的,他要旁站,那就先带他去地形最复杂的,最难爬的地方,搞一二次估计他就在旁边吹风了。当然,监理也觉得走走过程就行了那最好。当然,监理那份抽检资料你得给他弄掉。第四个因素:估算设计院地面线的准确情况:虽然说尽量要避免无谓的劳动,不过我们还是要考虑设计是否会发生巨大错误的。那就是原地面数据的准确性。一般来说,设计院在填方区的地面还是较为准确的,但是在挖方区,尤其是等高线很密,地形很陡的的地形上,设计出错是有的,而且有些错误很大。这一点,我们应该在放征地线的时候来验证,虽然征地线放的只是两条线,但一般来说,一个断面的两个口卡住了,这个断面发生错误的可能就很小了。放征地线的时候,我们应该把每个点的原地面高全部记下来,回去和图纸校对。本人曾经做过的两个工地,一个工地方量极大,业主也是国家级的,但是业主的要求是:
施工单位测地面必须全测,不能只报局部, 然后业主再下来全程检查。这样一来,业主的意思很明显,你根本耗不起这个时间,你就认了设计数量吧。那么我们就认了吧。第二个工地,方量没多少,业主也穷,可地形复杂,和业主见面的时候,业主对超出多少百分比才补方量含糊其词。本人经过权衡,决定放弃复测,承认设计数量,把资料补齐就算完事。一开始监理还奇怪,说从没见过主动放弃的。相邻的合同段测得正火,信誓旦旦说设计院错误很大,又说业主,设代就快认可了,但最后的结果是:全部否定。外业算白做了,内业就当交差。这步工作工作量极大,如果操作不得法,劳民伤 财,对测量人员士气的打击是非常大的。第四步工作:线路复核,尤其是结构坐标高程复核,这一步必须预先进行,为什么呢,因为现在的大设计院投下标以后,往往把设计工作分包,而分包单位的实力不敢恭维。结构上位置,高程的大片出错并非没有,本人就经历过。如果你到结构开工之前才复核,那么一旦发现错误,自己又不敢确定,必然要上报,现在设计单位工作效率大家也都知道,非常低,当然,这和业主的低效率,业主和设计院沟通不力也有关系。一旦结构位置高程大面积错误,就只有干等设计去复核,而施工单位的工期就这样耽误了,施工队只有干坐在工地上晒太阳。其实,进场后测量人员还是有富裕时间的,应该趁此富裕时间提前复核,此时尚未开工,即使上报,设计批复下来后可能正好结构开工,也可能超过结构预期开工时间还不多。工期就省下来了。第五步工作:资料格式的确定。测量有各种资料,最多的就是报验资料了,开工后资料不要埋着头一股脑只管做,因为做了很可能白做。首先,你的资料很可能是应用本单位原来的格式。其次,即使是业主下发的,也可能错,所以还是要合同人员把表格格式核对一下,业主的表错了,但资料返工他可不会帮你改。第六步工作:全线踏勘,重点观察涵洞位置,以及函长。设计院的涵洞位置的设计通常是不准的,角度偏差,桩号偏差,高程不准时有发生,估计他们的涵洞设计很多是不到现场,而是在图上定位置的。如果涵洞要开工才放样发现要变更,那么和结构坐标高程错误又一样了,要干等设计去复核变更,出变更图。有时候,一段路基的工期往往取决于这段路基上的涵洞能否及时完工,涵长也要提前验算,尤其是在有匝道
的时候,一个涵洞同时穿越主线和匝道,还是斜交的,还是在弯道上的,这种情况涵长最难计算,设计院常错,最好的计算方法是在DBD里模拟计算。第七步 施工测量中应该预先考虑和谋划的东西。首先,要规划好全线的水准点和导线点。不要梦想控制点可以从头用到尾,因为随着填高挖深,以及控制点的破坏,某些点也许后面就不能用了,所以一开始就要观察地形,联系断面图在大脑里进行空间想象,以决定加密导线点的位置,让这些导线点能尽可能的用久一点。施工单位进场后的导线复测通常和加密导线点的过程集成为一个过程,在复测之前必须理解“施工单位导线复测的含义”。施工单位的导线复测,是以标段为单位的,而且标段内一般是没有更高级的已知点的,这使得复测过程和设计院测量导线的过程含义不同。施工单位只需保证两点即可:1 。本标段内各导线点相对位置的正确性。也就是说,任意取四点假设为两条已知边,两条边之间的点进行联测满足规范要求。2。和相邻标段的起始边能闭合。只要满足这两点,那么在本标段内,导线系统是一个精密的整体,而放出的路线也是光滑,顺接的。然后又能和相邻标段闭合,这样,每个标段的精密的导线系统和其他标段精密的导线系统可以衔接,从形成一个连续不断的导线整体系统。不要去想导线的绝对坐标如何,因为没有已知点,你永远无法证明绝对坐标的正确性。理解了上面的含义,在进行导线复测和加密时,就不必把整个标段的导线作为一条导线来测。因为导线太长,导线点太多的话,只要中间某些点出现测角的稍微大点的误差,就会使得整条长导线发生扭曲,变形,从而出现和设计成果之间较大的误差,而且难以查出错误根源何在。所以,不妨把整个标段看成若干个小标段,以6,7个导线点为一组,组和组之间设一条公共边,这样,某点的测角误差只会影响本组,不但导线成果精度高,而且容易查出错误所在。这样,外业测量精度不变,却不会发生长导线误差过大的情况。水准点的布设原则上是讲究规范,严密的,对于某些大型国企尤其如此。但是,施工单位的人手通常不足,况且本人不喜欢做无用功。我们完全可以在规范的基础上变通。比如,在路基施工中,中间的高程要求是极低的,全站仪粗测就够了。再比如,在山区施工中,你去将设计院在高山的点引下来,站数多得吓人,而且往往徒劳无功,因为站数
越多,出错的可能越大。那么,我就假设在一条复杂的山区公路中,如何进行水准点总体布设的规划呢,首先,布设我肯定是以全站仪为主的,但要用水准仪辅助,工作以后我基本就没用过水准仪去进行全线联测,工作量太大了,相比工作量带来的那点精度没太大意义。第一步,将导线联测和水准联测合为一体,用全站仪测水准,需要注意的环节是:水准气泡的精确调平,这一点极为重要,要最大限度的调平,最好是仪器有电子水泡的。仪器的严密踩实。不但要锁死脚架,地面也要踩实。第三,仪器的高度精确测量,最好能把倾斜导致的误差计入,一般取仪高1.6米,用勾股定理算就行了。目标棱镜高也是如此。棱镜高一般量到棱镜横向螺丝中心。第四。视线位置和棱镜螺丝中心重合,有时距离较远的时候,可能棱镜边的螺丝中心看不清,这时可以叫对方用一只笔点在螺丝中心,用视线去切分笔即可。第五,对向观测。一定要对向观测。第六,尽量在天气阴的时候。不过在工地上难以保证,我就经常出太阳测 工程测量实验总结篇二《工程测量实验心得体会》 工程测量实验心得体会 班级:工程造价xxx班 姓名:xxx 令人难过的一周终于过去了,对于我们这类对工程测量真实的意义还不太了解的人来讲,原本认为的简单又好玩的工程测量就像是在野外探险,虽然有点夸张,但是的确也让我们的队员吃了不少苦头。 这一周的开始,便收到通知说这周要进行为期一周的工程测量实验,既兴奋(以为可以借此机会抛开平时喂考试为学习忙碌的气氛)又紧张(害怕完成不了任务)。以为测量不就是把目标的位置话出来就行了那么简单的事情,但是当我们真正操作的时候,却遇到了诸多问题,而这些问题也或多或少的影响了我们测量的进度和测量的精确性。 通知领器材的那一天,我们队员8点就兴奋的跑去领回了器材。我们的实验指导老师给我们讲解了实验的重点和内容,并用他的方法给我们讲述了如何将误差降到最小,如何更加准确的使用仪器,如何让实验走更少的弯路,需要避免哪些问题。在指导老师的讲解下,我们大概初步的了解到了如何使用仪器,如何对于一个目标点进行碎步测量,如何取舍测站点等等一系列的诸多问题,而这些问题却确实的在我们的测量实验中发生了,所以要学会悉心听取别人的指导,也许不是最最有用的,但是可能对于某一方面就是最有帮助的。 由于在
安排的测量周内我们又一次专业课考试的原因,同学们都需要对考试进行复习,所以在队长的安排下,我们将工程测量的时间压缩到了三天。 我们的测量目标是学校教学楼的主体部分,而我们的教学楼平面却是一个相对于一般的矩形的楼房较复杂的形状,周围也密密麻麻的布置这不规则的花坛和草坪,对于每一个测站点来讲,同一个角点的高程也是不同的,学校的地形处在一个丘陵地带,地形起伏不平,高低落差不定,这些实际的存在的问题对于我们初来乍到的新学者是一个难度。 第一天,我们终于开工了,为了在有限的时间里更好的完成我们的任务,在我们都还在睡意朦胧的时候就起床了,迅速的收拾好自己,再迅速的冲到食堂买好自己的早饭,拖着放在寝室的设备就充忙的往实验的第一个测站点赶去,在解决好自己的事情过后,大家聚拢一堆商讨了应该如何开始这次的实验,各个成员各自应该做哪些事情,分配任务,在试验中各自扮演的角色。好了,待一切决定好以后,正式开工了,由于在前几周的试验中,或多或少的接触到一些仪器,如经纬仪,水准仪等,这次我们的实验仪器主要是经纬仪,需要通过测量每一个角点的水平角和竖直角,再通过这些测定的角度计算出彼此之间的距离,再再图纸上描点,最终制成一幅教学楼的平面图。第一个测站点的时候,是我们最最粗涩的时候,往往会忽略一些重点问题,在指导老师的纠正下,我们及时改正了错误,也许,在我们最初的时候,都需要走过一段弯路,才会渐渐的发现自己的错误,最终找到属于自己的正确的方向。在这里,我不得不埋怨一下,我们学校的花坛为什么也那么艺术,那么曲折,以至于我们打了无数多个点去测定,读书,描点,计算,画图,最后发现,怎么还是不对,虽然花园不是主体部分,但是在最初的时候,也花费了我们不少的时间。我们的第一个测站点只是我们的试验点,从第一个测站点测定的那些角点,我们汲取了测量的精华,要对角点进行适当的取舍,实际上并不是角点越多就会越准确,每一个角点都会产生误差,角点多了,误差也就多了,所以应该适当的取舍角点。慢慢地摸着路子和方法过后,我们的实验进度也慢慢的加快了,趁着自己还拥有着饱满的热情,那一天,我们从早上七点,持续到晚上七点才收工,队友们都很辛苦,不停地跑,不停地计算,不停地读数。但是那一天,的确是相当充实
的一天。这一天,我们就载着疲惫和充实的身体潜回了宿舍,倒在寝室床上的那一刻,又有点害怕明天继续这样的生活,的确还是挺辛苦的,特别是女孩子,在队伍里面,我负责立杆,可能、也许,有人会认为这是这相对与他们来说很简单的工作,但是我只想告诉大家,很多事情, 不是自己想象的样子,只有当自己亲自的站到某一个位置的时候才能体会到那种感触。这一天,我的腿已经超出平时的负荷,感觉要静脉曲张了,立杆是个不容易的工作,我想过要和他们换一下,但是想想,每一个队友都很辛苦,如果能坚持,那么就继续。就这样,我拿着尺子走去走来,因为我也知道,他们测定,读书,计算,描点,画图一样是个很复杂的过程,还要消费脑力,对于我一个只耗费体力的人来说,他们更加地辛苦。 第二天,依然那么早,依然那么忙碌,这一天测定的角点都在教学楼的背面,都是在那些隐藏了很久的角落里面,在这里面穿梭,呵呵,条件很“艰苦”,各种“飞禽走兽”。我们依然重复着第一天的步骤,紧张而有序的进行着,时而趁着他们讨论的时候偷一下懒。其实第二天的时候就可以结束测量工作,但是由于学校举办活动,占了地方,所以只有在第三天的时候继续进行。 第三天,似乎大家都疲惫了,有队友不断的抱怨自己多累多累,也并不像之前那么自觉的做自己的事情,其实整个测量中,又谁只是在休息呢,有谁空着自己的手脚和头脑呢,这是一个集体活动,怎么可以凭借自己的感受就放弃呢,就这样,我们带着疲惫,埋怨,消沉的情绪完成了我们的任务,完成的那一刻,突然就觉得成功了,轻松了。 其实,在这个测量实验中,我受益匪浅。首先,我基本掌握了课堂所学的测量学知识,知道如何正确使用经纬仪测量距离、角度、高差等,测量学是研究地球的形状和大小以及确定地面(包含空中、地下和海底)点位的科学。既然是要测量就离不开实践。实践是对测量学知识的最好检验,只凭在课堂上的听课,我并没有掌握很多具体知识,尤其是对仪器的使用更是一塌糊涂。当第一天开始测量的时候,我的心里还一阵阵的发愁:该如何把任务进行下去。当动手的时候,发现其实并不难,听别人一说或者翻阅一下课本,然后自己动手操作一遍,就基本掌握了方法。其次,我更加的懂得了做事要认真,要细致,不能有丝毫的马虎,特别是在使用经纬仪这样精密的仪器时,更要做到
精益求精。因为稍有差错就可能导致数据的偏差很大,更会导致以后其它量的测量出错,最终导致数据计算的错误,比如我们刚开始测量角度时,一个基准点没有瞄准,导致一个角度偏小,然后角度的闭合差也不符合要求,经过校验,才发现问题出在哪儿。再次,我明白了团队协作的重要性,每一个成员都是团队里不可或缺的能量,学会了人际交往的方法,要学会体谅,包容,才能让一个团队有更好的发展。 其实,这样的机会并不多了,这样实践的机会也很少了,接下来的就是进入工作单位学习取经,但是试想在当今一个以营利为主的企业里,哪里有那么多让你实践的,让你花费的时间。所以,还是很有感触的。 我们现在需要的就是将理论运用的实践中,才能得出最真实可靠的答案。 感谢老师和同学们对我的帮助。 工程测量实验总结篇三《工程测量实习心得总结》 姓名:赵小建 学号:1015030006 班级:10土木 院系:交通与工程系 指导老师:张有明 紧张而有难忘的两周测量实习生活在一片胜利的欢呼声中结束了。通过本次实习,巩固、扩大和加深了我们从课堂上所学的理论知识,掌握了DJ-6经纬仪的基本操作,并达到了一定的熟练程度,而且还有机会学会了地形图的绘制方法。在锻炼大家画草图、运用CAD绘图的能力同时也积累自己的绘图经验和提高自己的绘图速度。不仅从此次专业实习中获得了测量实际工作的初步经验和基本技能,还着重培养了我们的独立工作能力,培养我们在施测现场发现问题、解决问题的能力,而且进一步熟练了测量仪器的使用技能,提高了数据计算能力和对数据的敏感程度,并对测绘小区域大比例尺地形图的全过程有了一个全面和系统的认识,这些知识往往是我在学校很少接触、注意的,但又是十分重要、十分基础的知识,有了一定雄厚的基础才可以决定上层建筑。因而此次实习不仅让我积累了许多经验,也让我学到了很多实践知识,因为我们大家都明白实践是检验真理的唯一标准这一马克思辨证唯物主义真理~ 本次实习也让我真正体会到测绘专业是一个团队的工种~我们组有六名组员,每个人的工作任务和各自的长处是不一样的,我们配合起来才能发挥出较高的效率。我的主要任务是使用仪器测出数据。同时这次实习也拓展了我们与老师与同学的交际,合作的能力。因为以前人家说工程测量特别需要团队合作精神,我都没有能够完全了解。
的确,一次测量实习要完整的做完,单靠一个人的力量和构思是远远不够的,也是不可能将要做的工作做好。只有小组全体成员的合作和团结才能让实习快速而高效的完成。正所谓“三个臭皮匠,顶个诸葛亮”。另外这次测量实习培养了我们小组的分工协作的能力,增进了同学之间的感情,深化了友谊。在实习过程中难免会碰到一些疙疙瘩瘩的事情,闹得大家都不愉快,但是我们能够及时地进行交流和沟通,忘记昨天的不愉快,迎接新的朝阳~我们完成这次实习的原则也是让每个组员都学到知识而且会实际操作,并且能够单独的完成一项工作,达到相应的锻炼效果后进行轮换,以达到共同进行的目的,而不是单纯抢时间,赶进度,草草了事收工,这样也达不到实习的预期目标。即使收工了,百分之百也要重新来过,这样的话太划不来,既浪费时间和精力,有摧毁了组员的积极性,百害而不一利。另外,如果我们在平时就这样马马乎乎,对我们自己而言是自己对自己不负责,现在马虎惯了,将来对待工作也回、会草草了事~另外,我们拥有这样让你锻炼的机会是少之又少的,马马乎乎就等于将一次绝佳的机会给浪费了,丢掉了确实很可惜~所以,我们这个组的每个组员都分别进行独立的观察,记录每一站,对经纬仪测量都是在现场进行计算,发现问题及时解决,没有对上一步的检核,绝不进行下一步的测量,做到步步有检核,回来后还要对内业进行准确计算,因为这样做不但可以防止误差的积累,及时发现错误,更可以提高测量的效率,避免测量的不准确还要进行重测。即使重测,我们怀着严谨的态度,错了就返工,决不马虎。直至符合测量要求为止。我们深知搞工程这一行,需要的就是细心、耐心、毅力和做事严谨的态度。只有这样,日后走上工作岗位才会得心应手,少走弯路。 例如:进行测图时就要注意以下几点: (1)标尺要立直,尽量避免晃动,有晃动时,应该选择数据最小的时候进行读取。在读数前一定将视野的气泡调平(两侧的线重合),否则造成的误差会很大。 (2)当用经纬仪测量角度时,如果目标较小,最好使单线与目标重合,如果目标有一定宽度,可以用双丝夹住目标。 (3)在测量时候一定要小心,因为稍微碰了一下仪器,就要重新调整对中水平,否则就会导致数据错误,也可能导致仪器的损坏。(4)在读取数据时,每位成员都要细心,既要看得准,还
要果断,不能犹豫不决,任何一个错误都有可能导致最终的成果的报废。 (5)选点非常重要,点一定要选在有代表性的地方,同时要注意并非点越多越好,相反选取的无用点过多不但会增加测量、计算和绘图的劳动量和多费时间,而且会因点多而杂乱产生较大的误差。 (6)要先将道路和主要建筑物确定下来,然后在添加其余次要方面,这样不但条理清楚,有利于作图的准确和随时进行实物和图形的对比从而检验测量数据的准确与否。我们还要对所测过得范围能够做到胸中有数,避免漏测、重测。 (7)团结就是力量,纪律才是保证经过每个组员的团结工作,当我们完成了测图的工作,并且看到我们画好的图纸时大家都兴奋不已。在我们组的同学交流测量中的经验时,大家感觉收获都很多,有的说仪器的展点很重要,因为这关系到误差的大小,有的说测量中点不能架设的太远,有的说量取全站仪的仪器高和目标高时要尽量减少误差,水准仪施测过程中尺垫得使用以及架仪器过程中气泡的精确对中和整平,还有就是我们要有一颗爱护仪器的心,对所用的仪器要精心呵护,在学校如此,走上工作岗位后更要如此,这样可以避免一些不必要得麻烦等等吧。想想大家每天早上八点多就起床背上仪器顶着大太阳去测量,算出误差大的大家一起讨论和修改,有必要的就不厌其烦的进行重新测量,有了团结的力量我们还是干的很有劲的。我也从别人那里学到了以前不是太清楚的东西,比如数据的处理、碎部点的简化观测以及一些作图的疑问都在测量中得到了答案。 求真务实测量实习,让我学到了很多实实在在的东西,对以前零零碎碎学的测量知识有了综合应用的机会,控制测量和地形图测绘过程有了一个良好的了解,学会了地形图的绘制等在课堂上无法做到的东西以及更熟练的使用经纬仪测量仪器与工具,很好的巩固了理论教学知识,提高实际操作能力,同时也拓展了与同学之间的交际合作的能力。当然其中不乏老师的教诲和同学的帮助。当我们每个组都基本画好图后,老师对每个组的成果进行检查,出现问题就让我们及时改正。其实想想每天校园中那些测量的我们也算是一道不错的风景。还记得晚上七点多了,因为一个站点的错误我们不得不重新测量,忙了半天大家连晚饭都没来得及吃。总之,这两周中我们也体会了不少酸甜苦辣,有的测量很顺利甚至零误差,有时测量处处碰壁(像发现
错误找不出来、点号密集时畏缩过),但大家也算都坚持下来了。当我们完成了测量时大家还是很高兴的.虽然测量中大家也有懒的时候不想测了,但挺过去都好了,实习结束时大家面对镜子中被晒得黝黑的脸蛋和肌肤,大家都毫无怨言,因为大家都明白苦尽甘来。另外,测绘是艰苦型的专业,不留汗、不吃苦是做不出成就的~这两周实习也给了我们不少教训:由于某个数据的读错、记错及算错都给我们带来了不少麻烦,从而让我们知道了做任何事都要认真、都要有一个严谨的态度,俗话说得好“态度决定一切”。一个组的团结也是至关重要的,它关系到整个组的进度。先前我们组由于配合不够 默契,分工也不够合理,整体进度受到极大的影响,后来通过组内的交流,彻底解决了以上问题。实习进度有了很大的改观,进度和效果自然就提上来了。 失败是成功之母~我很珍惜学校为我们安排实习这一理论与现实连接的重要环节,更深刻的体会了实物与图纸之间那种密切的关系,明白了图纸它要显示什么样的物件,有的在图纸上看不懂的地方在实物的面前就显的那么简单明了。总之,要谢谢学校在为促进学生实践能力所安排的这段实习,我将永远珍惜这段经历,同时这段实习生活也是我一生中最值得难忘的。 工程测量实验总结篇四《工程测量实习总结》 工程测量实习总结 通过本次实习,巩固、扩大和加深我们从课堂上所学的理论知识, 掌握了水准仪、全站仪的基本操作,还有学会了施工放样及地形图的 绘制方法,获得了测量实际工作的初步经验和基本技能,着重培养了 我们的独立工作能力,进一步熟练了测量仪器的操作技能,提高了计 算和绘图能力,并对测绘小区域大比例尺地形图的全过程有了一个全 面和系统的认识,这些知识往往是我在学校很少接触、注意的,但又 是十分重要、十分基础的知识。从而积累了许多经验,使我学到了很 多实践知识。 -----实践是检验真理的唯一标准 一次测量实习要完整的做完,单靠一个人的力量和构思是远远 不够的,只有小组的合作和团结才能让实习快速而高效的完成。这次 测量实习培养了我们小组的分工协作的能力,增进了同学之间的感 情。我们完成这次实习的原则也是让每个组员都学到知识而且会实际 操作,而不是抢时间,赶进度,草草了事收工。所以,我们每个组员 都分别独立的观察,记录每一站,并
准确进行计算。做到步步有“检 核”,这样做不但可以防止误差的积累,及时发现错误,更可以提高 测量的效率。 我们怀着严谨的态度,错了就返工,决不马虎。直至 符合测量要求为止。我们深知搞工程这一行,需要的就是细心,做事 严谨。例如: (1)立标尺时,标尺除立直外,还要选在重要的地方。因此,选 点就非常重要,点一定要选在有代表性的地方,同时要注意并非点越 多越好,相反选取的无用点过多不但会增加测量,计算和绘图的劳动 量和多费时间,而且会因点多而杂乱产生较大的误差。 (2)要先将道路和主要建筑物确定下来,然后在添加其余次要方 面,这样不但条理清楚,有利于作图的准确和随时进行实物和图形的 对比从而检验测量数据的准确与否。 ---团结就是力量,纪律才是保证 经过每个组员的团结工作,我们完成了侧图的工作,看到我们画 好的图纸大家都兴奋不已。在我们组的同学交流测量中的经验时,大 家感觉收获都很多,有的说仪器的展点很重要关系到误差的大小,有 的说水准测量中点不能架设的太远,等等吧。想想大家每天早七点多 就起床背上仪器去测量,算出误差大的大家一起讨论和修改,并重新 测量。有了团结的力量我们还是干的很有劲的。我也从别人那里学到 了以前不是太清楚的东西,比如数据的处理、水平角的观测以及一些 作图的疑问都在测量中得到了答案 -----求真务实 测量实习,让我学到了很多实实在在的东西,对以前零零碎碎学 的测量知识有了综合应用的机会,控制测量和地形图测绘过程有了一 个良好的了解。学会了地形图的绘制等在课堂上无法做到的东西以及 更熟练的使用水准仪,全站仪等测量仪器与工具。很好的巩固了理论 教学知识,提高实际操作能力,同时也拓展了与同学之间的交际合作 的能力。当然其中不乏老师的教诲和同学的帮助。当我们每个组都基 本画好图后,老师每个组的检查,出现问题就让我们及时改正。其实 想想每天校园中那些测量的我们也算是一道不错的风景。还记得晚上 七点多了,因为一个站点的错误我们不得不重新测量,忙了半天大家 连晚饭都没来得及吃。总之,两周中我们也体会了不少酸甜苦辣,有 的测量很顺利甚至零误差,有时测量处处碰壁,但也算过去了。完成 了测量还是很高兴的.虽然测量中大家也有懒的时候不想测了,但挺 过去都好了。
------苦尽甘来 但这两周实习也给了我们不少教训:由于某个数据的读错、记错 及算错都给我们带来了不少麻烦,从而让我们知道了做任何事都要认 真。一个组的团结也是至关重要的,它关系到整个组的进度。先前我 们组由于配合不够默契,分工也不够合理,整体进度受到极大的影响, 后来通过组内的交流,彻底解决了以上问题。实习进度有了很大的改 观,进度和效果自然就提上来了。 -----失败是成功之母 我很珍惜学校为我们安排实习这理论与现实连接的重要环节,更 深刻的体会了实物与图纸之间那种密切的关系,明白了图纸它要显示 什么样的物件,有的在图纸上看不懂的地方在实物的面前就显的那么简单明了。总之,要谢谢学校在为促进学生实践能力所安排的这段实习,我将永远珍惜这段经历。同时这段实习生活也是我一生中最值得难忘的。 工程测量实验总结篇五《工程测量实习总结》 工程测量实习总结 工程测量实习,作为本专业一门基本的必修专业实践课,对于我们交通专业而言在以后的工作中是非常重要的,所以它的重要性就不言而喻了。学习工程测量的目的不仅是要熟悉课本的理论知识,更重要的是培养实践动手能力,以及体会测量思想“从控制到碎步,从整体到局部,步步检核”等原则对工程测量的意义。如果我们能够熟练掌握这一测量技巧,那么,在以后的工作中我们将游刃有余。因此,趁本学院为我们安排此次测量实习,我们更要好好利用,让我们通过这次的测量实习平台,改善我们的思维结构,培养我们的团队合作能力和领导能力。 学期末放假之前,本学院组织院内学生进行工程测量实习,每个班级由各个指导老师亲自带领进行测量工作。孙博老师是我们班的指导老师,测量现场由她亲自带领指导,帮忙分析测量结果并指出测量过程中的不足之处,这使得我们在测量过程中少走了很多弯路,更好更快的完成测量工作。当然在本次的测量工作中也存在很多的困难,天气便是一大重要影响因素。首先,不管天气如何,保护仪器是最重要的,我们必须根据天气的不同状来调整测量工作,这样测能保证测量数据的精确性,也有助于测量工作结束后的数据处理。 在为期数天的测量中,同学们都各自分组分工,我们组共有四名同学,各自分配任务,一名组长带领我们进行测量。在测量过程中我们轮流调仪器,竖花杆,读数,以保证每名组员都能
真正的学习到测量知识,也是考验同学们之间的团队协作能力,怎样才能既快又好的完成测量工作。在每一次的测量之前,我们组都会先将实习的内容预习一遍,这样在实际测量中才不会盲目的去测,会把测量过程中会有什么困难提前预想,也准备了应对方案,但即便如此在实际的测量中还是会遇到很多困难。比如,在我们的测量干道上停了很多的车子,导致我们提前画好的测点被挡住,因此我们在四等水准测量中选择了设置转点来避免了这个难点。 我们的实习地点是在学校的建工楼周围,选取了六个测量进行了四等水准测量、导线测量和碎步测量,并完成数据处理,草图绘画及CAD图的制作,有关数据的后期处理我们小组也通过任务分配来完成,以便提高效率。在测量的时候由于组数过多,所以一开始显得比较拥挤,而后每个组分开选择起点,错开位置就轻而易举的解决了这个问题。 第一次出去测量是1月6号上午,每个组领取测量中所需要的仪器,初步掌握第一个实习工作的步骤,熟悉仪器的使用方法,下午又进行仪器校验,那天就初步的了解一下实习的地点及感受外业测量的氛围。 第二次测量是在三天后,1月9号,因为之前几天都是阴雨天,所以有所耽搁,但是那几天天气比较寒冷,但是为了尽快完成测量工作同学们都冒着严寒顶着寒风测量。第二次测量算是真正的开始,我们组被分到了三测点,依次进行了导线测量、四等水准测量、碎步测量。外业测量工作结束以后,老师安排我们一起到教室进行统一处理数据,以便于各小组成员共同讨论研究,这样能够更加高效的完成任务。 从这两周实习的日子中,我从中得到很多更宝贵的东西: 首先,通过实习,让我发现我在平时学习中存在的很多知识漏洞。课本上介绍仪器使用的知识都比较抽象,到了真正实践中的时候,我们未能很好把书本知识应用到实践中,还需要老师再次进行指导。在近距离的接触这些实物,能我更 牢固的掌握相关的知识点;也能令我提高对仪器的操作的熟练、精准程度。 其次,通过这次实习,有利于培养我做事严谨、认真、不畏艰难困苦的作风。不论是对中整平时的重复精确瞄准还是在放样计算时反复检验计算数据,每个步骤都尽量做到脚踏实地、一丝不苟,使误差尽可能的减小,及时发现错误及时检查;不论外界的环境的恶劣,克服一下就算不了什么;正确面对困难,学会静下来耐
心的思考分析问题,能够独立借助书本找出解决途径。做事要又负责的态度,若因为自己而造成了错误要主动承担并积极补救。 第三,通过实习对培养我们团队协作精神有促进作用。它增进了同学们之间的交流和团结,互帮互补,分工合作,共同面对、解决困难,共同寻求如何更快更好地完成任务的方法,提高小组工作效率,确保进度的完成。 再有,我发现我们实习经验还较欠缺,在发现问题时不知如何解决。 这次测量仪器的使用和实地的测量实习工作的开展,让我们更直观接触到了工程测量这个学科,也为我们今后走上工作岗位后,更好更快地使用仪器、控制测量发放奠定了坚实的基础。也让我们明白了水利工程专业的实际操作性强的特点,触发我们今后要更加努力学习专业知识,并要加强理论与实践相结合的方式方法,从本质上提高自己的专业水平。因此,实习在大学生活中是非常重要的。一个人的知识和能力只有在实践中才能发挥作用,才能得到丰富、完善和发展。大学生成长,就要勤于实践,将所学的理论知识与实践相结合一起,在实践中继续学习,不断总结,逐步完善,有所创新,并在实践中提高自己由知识、能力、智慧等因素融合成的综合素质和能力。以后我会珍惜每次的实习机会,多去挖掘课堂上无法获及的东西,为自己事业的成功打下良好的基础。 工程测量实验总结篇六《工程测量实习总结》 实习总结 本次实习是在上学期修过的工程测量学和以往修过的相关测量课程基础上设置的,实习内容包括:建筑轴线和道路曲线放样、水平位移监测和沉降观测、纵横断面图测绘、场地平整的高程放样。所以要想做好本次工程测量实习的全部内容,工程测量学是我们要重点复习的理论对象。 本次实习为期4周,我们将各个实习内容分小项进行。其一,建筑轴线和道路曲线放样,建筑轴线我们根据实习指导书上给出的相关数据进行计算,采用极坐标法进行放样,即测设出角度、距离,并通过多次测量检查放样点;曲线放样我们采用偏角法计算放样,亦是通过多个测回检查放样点。其二,水平位移监测和沉降观测,我们通过全站仪采用测小角法周期性读取监测点的角度、距离,将这些观测数据进行计算统计获得监测结果报告;沉降观测是通过周期性三等水准来进行观测的,再将获得的周期数据进行计算统计,得到沉降观测成果报告。其三,纵横断面图测绘,我们小
组采用的是水准测量进行测绘的,纵断面中桩测绘方法是四等水准,于地形起伏较大处通过工程等外水准方法加密中桩完成了纵断面测绘;横断面图测绘是在中桩的基础上于相应中桩两侧50m左右范围进行等外水准测量。其四,场地平整高程放样,选取一片空地,假设一基准点,根据此基准点进行高程放样,计算挖方或填方高差值。 尽管本次实习项目较多,但总体而言项目外业都比较轻松,唯一较麻烦的是沉降观测,因为其具有周期性,需要多次观测。本次实习中我们也遇到许多问题,但最终通过大家讨论和老师的指导我们解决各种问题。举个例子,在纵断面测绘起初。我们组仅仅于每隔20m处布设中桩进行四等水准测量,后来老师指出:纵断面中桩于地势起伏较大处应当加密中桩测绘,以便纵断面图能够平滑的绘制,于是我们及时补测,于九月桥处每隔5m加测中桩。所以实习是能够发现实践错误并改正错误的好体验。 水准测量可以说是本次实习相当重要的一部分,外业技术要求和工作量都比较大。高程放样需要水准测量,纵断面需要水准测量,横断面需要水准测量,尤其是沉降观测需要多次三等水准水准测量,所以本次实习我们可以再次很好的温故水准测量的程序方法。成果内业我们采用了EXCEL电子表格进行等外水准计算,三等和四等水准是通过南方平差易软件进行平差计算的,并输出了平差报告成果。 最后表达下感想,测绘校园大实习已经不是第一次了,在做了这么多实习后,觉得实习离不开小组,离不开团队。外业测量比较辛苦,可以培养我们的耐心和耐力。内业往往更是繁琐,可以历练我对数据的处理能力。无论是实习外业还是内业都能够更好的帮助我们理解书面知识、原理等。所以认真对待实习很有必要。 这次实习也是我们走向工作岗位前的最后一个大实习,我能够运用到所学的大部分知识,给自己一个很好的检验自己的机会。同时自己也体会到努力积累书本知识和实践经验很有必要。 赵翔 08201650235 工程测量实验总结篇七《工程测量实训总结》 工程测量实训总结 过去的两个星期中,在老师的带领下我们开始了对“工程测量”这门课程的实习。工程测量这门课,是需要理论与实际结合的。实习是大学生活的第二课堂,是检验真理的试金石。在课堂上,书本中抽象的叙述说明往往使我们一下难以很好掌握,但当我们面对着实物实际的操作后,我们
将能非常迅速、牢固的掌握相关的知识点。更重要的,实习能使我们在能更加熟练、精准的操作基础上,更贴近实际运用的作业,及独立的完成所需的测量实际任务,这样也是大学生锻炼成长的有效途径。 所以,深知实习重要性的我必须认真的把握好这难得的学习机会。 现在回头看来,两周的实习酸、甜、苦、辣俱全。我们的第一项任务是选择控制点。在实习的第一天,由于对计算方法的不熟悉,我们的计算结果一直误差甚大,只能通过不断对照书本,与其他组的组员共同探讨查找问题,慢慢更正。由于计算公式比较复杂,加上反复的计算,使得大家头痛手酸。有些组员脸上也显出沮丧的情绪??直到第二天,当我们的数据结果终于与放样后的实际结果相符,我们才感觉到苦尽甜来。另外,我们的第二项任务是四等水准测量。当我们辛辛苦苦花了一天时间好不容易测完了学校一圈的数据,收工休息时,却被负责计算的组员告知闭合差不合要求,那就意味着我们一天的努力化作乌有??每天的每天,我们都必须在酷暑或雨水的陪伴下,扛着仪器携带着相关计算物品,在学校内外紧张忙碌 ,连午休时间都舍弃。我们的精神和精力都消耗了不少。 从这两周实习的日子中,我从中得到很多更宝贵的东西: 首先,通过实习,让我发现我在平时学习中存在的很多知识漏洞。课本上介绍仪器使用的知识都比较抽象,到了真正实践中的时候,我们未能很好把书本知识应用到实践中,还需要老师再次进行指导。在近距离的接触这些实物,能我更牢固的掌握相关的知识点;也能令我提高对仪器的操作的熟练、精准程度。 其次,通过这次实习,有利于培养我做事严谨、认真、不畏艰难困苦的作风。不论是对中整平时的重复精确瞄准还是在放样计算时反复检验计算数据,每个步骤都尽量做到脚踏实地、一丝不苟,使误差尽可能的减小,及时发现错误及时检查;不论外界的环境的恶劣,克服一下就算不了什么;正确面对困难,学会静下来耐心的思考分析问题,能够独立借助书本找出解决途径。做事要又负责的态度,若因为自己而造成了错误要主动承担 并积极补救。 第三,通过实习对培养我们团队协作精神有促进作用。它增进了同学们之间的交流和团结,互帮互补,分工合作,共同面对、解决困工程测量实训总结 范文,工作总结范文。难,共同寻求如何更快更好地完成任务的方法,提高小组工作效
率,确保进度的完成。 再有,我发现我们实习经验还较欠缺,在发现问题时不知如何解决。比如在做四等水准测量时,记录数据中突然出现两个“红 K-黑”差值达100多,当时不知是怎么回事。之后明白是前后尺拿调换了。 这次测量仪器的使用和实地的测量实习工作的开展,让我们更直观接触到了土木工程测量这个学科,也为我们今后走上工作岗位后,更好更快地使用仪器、控制测量发放奠定了坚实的基础。也让我们明白了水利工程专业的实际操作性强的特点,触发我们今后要更加努力学习专业知识,并要加强理论与实践相结合的方式方法,从本质上提高自己的专业水平。因此,实习在大学生活中是非常重要的。一个人的知识和能力只有在实践中才能发挥作用,才能得到丰富、完善和发展。大学生成长,就要勤于实践,将所学的理论知识与实践相结合一起,在实践中继续学习,不断总结,逐步完善,有所创新,并在实践中提高自己由知识、能力、智慧等因素融合成的综合素质和能力。以后我会珍惜每次的实习机会,多去挖掘课堂上无法获及的东西,为自己事业的成功打下良好的基础。 工程测量实验总结篇八《工程测量实习总结》 实 习 总 结 系别:测绘工程系 专业:工程测量 班级:工程测量1007 姓名:黄伟林 学号:2016020834 实习总结 为期三个多月紧张而又难忘的实习生活已经结束了,刚知道要 实习的时候不大喜欢,但经历了这么多以后,却觉得真的很充实,很有意义。 我被安排在河南地球物理工程勘察院实习,刚开始的时候还有 点不情愿,因为这个公司的主要工作不是测量而是物探,感觉跟我所学专业没多大关系。但到了工作岗位才知道,物探也是测量的一种,还要和测量相配合才能完成工作,所以我又庆幸我记学习和巩固了测量知识又学到了物探这个新的技术。 我们实习所作的工作室城市管线测量,需要物探和测量人员相 配合共同完成,实习过程中,我不仅学习了测量知识,还跟师傅学习了物探技术,虽然这个工作比较脏比较累,但是我学到了新的技术,认识了各种不同的管线,学会了用不同的方法对不同的管线进行测量,这对我以后就业会有很大的帮助,脏点累点又能算什么。 通过本次实习,巩固、扩大和加深我们从课堂上所学的理论知 识,首先,我基本掌握了课堂所学的测量学知识,知道如何正确使用全站仪测量距离、角度和坐标等,还
学会了用GPS作控制。既然是要测量就离不开实践。实践是对测量学知识的最好检验,只凭在课堂上的听,我并没有掌握很多具体知识,尤其是对仪器的使用更是一塌糊涂。当第一天开始测量的时候,我的心里还一阵的发愁:该如何把任 务进行下去。当动手的时候,发现其实并不难,听别人一说或者翻阅一下课本,然后自己动手操作一遍,就基本掌握了方法。要想提高效率和测量精度,还要经常练习,这样才能做到举一反三。这些知识是十分重要、十分基础的知识。从而积累了许多经验,使我学到了很多实践知识。 一次测量实习要完整的做完,单靠一个人的力量和构思是远远不 够的,只有小组的合作和团结才能让实习快速而高效的完成。这次测量实习培养了我们小组的分工协作的能力,增进了同学之间的感情。我们完成这次实习的原则也是让每个组员都学到知识而且会实际操作,而不是抢时间,赶进度,草草了事收工。所以,我们每个组员都分别独立的观察,记录每一站,并准确进行计算。做到步步有“检核”,这样做不但可以防止误差的积累,及时发现错误,更可以提高测量的效率。我们怀着严谨的态度,错了就返工,决不马虎。直至符合测量要求为止。我们深知搞工程这一行,需要的就是细心,做事严谨。 测量实习,让我学到了很多实实在在的东西,对以前零零碎碎学 的测量知识有了综合应用的机会,控制测量也有了一个良好巩固。很好的巩固了理论教学知识,提高实际操作能力,同时也拓展了与同学之间的交际合作的能力。当然其中不乏老师的教诲和同学的帮助。总之,实习中我们也体会了不少酸甜苦辣,有的测量很顺利甚至零误差,有时测量处处碰壁,但也算过去了,完成了测量还是很高兴的。虽然测量中大家也有懒的时候不想测了。 我很珍惜学校为我们安排实习这理论与现实连接的重要环节,谢 谢学校在为促进学生实践能力所安排的这段实习,同时多谢几位教师仔细耐心的指导,我们有如此的成绩首先要谢谢我们的指导老师,我 将永远珍惜这段经历。同时这段实习生活也是我一生中最值得难忘的。 第一天我们就体会到了实习不是那么的轻松。对我们的任务我们 不知道怎么开始,不知道明天今天该干什么明天该干什么,实习没有了好的计划。组分工也没有明确,所以导致了做起事来没有效率。一系列的问题一下子摆到了我们的面前,我感受到了这次是我来
说是一次有力的挑战。第一天虽然做事效率低可是我们花了很多时间来熟悉实习操作,那一天收工的时候每个人都是很疲劳了。我们一起吃饭的时候好好总结了这一天实习中出现的问题,确定了每个人以后实习的具体分工。同时我们还一起规划了每天要做的内容。这样一来我们做事就更具高效性更有目的性。果不其然,我们第二天做起来相比第一天就好多了。 刚开始的时候我们还需要师傅带领我们出去测量,但经过师傅的 指导后,我们已经掌握了技术,可以自己操作仪器。慢慢的,我们就可以自己带着仪器到外边测量,完成领导交给我们的任务。 这次的测量实习说真的还是比较辛苦的,每天就是不停的找碎步点,定点,找点,读数,计数,每天固定的工作有时真的很疲倦。还 要担心我们操作是不是正确,如果出现一点点错误那数据就全部报废要返工了,那就很麻烦了。我们在测量的过程中也遇到了很多的问题,每次遇到困难问题时我们组总是会进行激烈的讨论,最后不能得出结论的就问问其他组的同学,或者向师傅请教。我有时真觉得我们真的很幸运和幸福,因为我们有一位很和善亲切的师傅。 实习虽然只有三个月时间,可是通过这次实习我不仅对课本的知识有了更加深刻的认知和理解,我更从这次实习中懂得了什么是团队合作的重要性,懂得了团结的力量。有快乐一起分享,有困难一起担当,我们有个很团结很优秀的小组,我们在一起做事很快乐也很难忘。我为能成为这样的优秀团队中的一员而感到荣幸和骄傲~这一次实习的经历也必定会成为以后人生中一段美好的回忆。 实习结束了,从刚开始的欣喜到期间的泄气,到临近尾声的坚持让自己得到了许多,学到了许多。 通过这次实习我还发现,仅仅有熟练的理论知识对于我们测量人员是远远不够的,对于学习了这么长时间测量的我们,可以说对测量基本上耳目能熟了,有关测量的专业基本知识、基本理论、基本方法和结构体系、我们都基本掌握。但是在这次实习过程中仍然很吃力,这使我们认识到测量理论如果离开实践皆为零,实际操作性和实践性对于测量人员来说至关重要,离开实践环节的测量理论知识只是纸上谈兵,在测量人员的工作中行不通。 工程测量实验总结篇九《工程测量实习技术总结》 工程测量实习技术总结 经过差不多两个周的工程测量实习,从某个角度来讲,可以说使我对工程测量这门课
有了更进一步的了解与领悟。毕竟工程测量这门课是一门实践性比较强的课程,而不是仅仅只靠我们在课堂上认真听讲就能轻而易举地掌握。因此,我们必须尽可能多地亲自去实际操作和使用仪器,只有这样我们才能把课堂上学到的知识转化为自己的东西,才能学以致用。在这两周的测量实习中,我遇到了许多困难,也学到了很多东西。一些是勘查选点方面的,也有一些是仪器使用操作方面的,还有一些是数据处理和绘图方面的。总之,在遇到这些问题并把这些问题解决的同时,自己不仅学到了一些方法技巧,而且还积累了一些经验。以下就是我所总结的一些方法和经验。 一、勘测选点:在测量刚开始的时候,由于以前没有选过控制点,对选取控制点的要求不是特别清楚,所以就隔一定距离随便选了一些控制点。但到测量高程和角度时,却发现选取的控制点不符合实际测量要求。因为当用仪器测量高程和角度时,视线却被一些障碍物挡住了,以至于不能进行读数。最后经过重新选取控制点,才把这一问题给解决了。究其原因,主要是我们在选点时没有考虑一些障碍物对读数的影响。所以,在以后的测量实习中选取 控制点时,不仅要考虑站在控制点观看测量区域的通视性,而且还要尽量避免障碍物对测量读数时的影响。 二、仪器操作与使用:在这方面,我所遇到困难主要就是经纬仪的对中与整平。因为没有经验,在给经纬仪对中和整平时真是花费了 不少时间。有时即使花费了很多时间,也还是对中了整不平,或者整平了对不中。经过几天的摸索,我终于找到了快速对中与整平的方法:那就是先通过移动脚架,把控制点大致移到脚架圆孔的中心,然后再把经纬仪放到脚架上进行对中。当对中以后,再通过升降、挪动脚架来把圆水准泡调到中间。反复操作,直到经纬仪和控制点对中,以及圆水准泡和管水准泡居中为止。因为用这种方法不仅能快速地进行对中,而且还能快速地进行整平。可以说,掌握这种经纬仪对中与整平的方法,大大加快了我们测量的速度,为我们小组节省了许多宝贵时间。因此,我们可以用节省出来的时间进行复习,为考试做准备。同样,我们用这种方法在操作全站仪时,测量进度也果然明显加快。别的小组看到我们如此快速熟练的使用仪器,都向我们投来了羡慕的眼光,也有不少小组来向我们“取经”、请教经验。经过我们的一番指导,他们的测量速
度也加快了不少。看到这种情况,我们小组也感到十分高兴和有成就感。 三、数据处理与计算:在进行数据处理和计算时,我们都是按照课本上的要求和规格。比如说在保留小数时,我们都是严格按照“四舍六入五看前一位,奇进偶不进”的标准。在这方面我所遇到的困难就是根据转折角来计算方位角,刚开始不知道怎么算,后来才明白如何计算。也就是说计算方位角时,要考虑是如何测量转折角的,要遵循“左加右减”,即测量方向是顺时针时就用前一个角的方位角加上后一个角的转折角再减去一百八十度;当测量方向是逆时针时,正好与顺时针时相反。 总之,通过这两个周的工程测量实习,让我对书本知识更加了解和熟悉,加深了我所学的知识,为自己今后毕业参加这方面的工作奠定了基础和做好了准备。所以,这两周的实习使我受益匪浅,对我的帮助也很大,真希望以后还能尽可能多地进行这种实习。与此同时,由于这次实习是分小组进行的,也让我体验了一下团队合作。我们小组在进行测量时分工明确,所以每个人都能找到自己的任务去做,可以说是各斯其职。因此,我们小组成员之间的关系非常融洽、和谐,大家做起事来干劲十足,都争先恐后地去做,所以我们的测量结果十分精确,返工量才会那么少,这完全要归功于大家的努力和热情投入。我为我们小组所做出的成果而感到骄傲和高兴,希望我们在以后的测量实习中继续保持这种不怕苦不怕累的精神,再接再厉,争取取得更好的成绩。
范文五:(最新版)工程测量毕业论文2183321
一、绪论
测绘技术是一个很古老的学科。早在二千多年前,我国就已经绘制了水平 很高的“地形图” 。随着历史的改革,测绘技术已拓展成为一门庞大的、系统的 多分支的学科。特别是近年来,随着计算机、电子、通信等先进技术在测绘领 域的应用,已基本实现了传统测量技术向数字化技术体系的转变。
随着科技的不断进步,测绘仪器设备迅速发展,新仪器不断出现。在全站 仪方面的重要发展是长距离棱镜全站仪的出现,免棱镜全站仪的免棱镜视距由 初期几十米发展到当前的一千米以上。
地形测量指的是测绘地形图的作业。即对地球表面的地物、地形在水平面 上的投影位置和高程进行测定,并按一定比例缩小,用符号和注记绘制成地形 图的工作。地形图的测绘基本上采用航空摄影测量方法,利用航空像片主要在 室内测图。但面积较小的或者工程建设需要的地形图,采用平板仪测量方法, 在野外进行测图。
地形测量包括控制测量和碎部测量。①控制测量是测定一定数量的平面和 高程控制点,为地形测图的依据。平板仪测图的控制测量通常分首级控制测量 和图根控制测量。首级控制以大地控制点为基础,用三角测量或导线测量方法 在整个测区内测定一些精度较高、分布均匀的控制点。图根控制测量是在首级 控制下,用小三角测量、交会定点方法等加密满足测图需要的控制点。图根控 制点的高程通常用三角高程测量或水准测量方法测定。②碎部测量是测绘地物 地形的作业。地物特征点、地形特征点统称为碎部点。碎部点的平面位置常用 极坐标法测定,碎部点的高程通常用视距测量法测定。按所用仪器不同,有平 板仪测图法、经纬仪和小平板仪联合测图法、经纬仪(配合轻便展点工具)测 图法等。它们的作业过程基本相同。测图前将绘图纸或聚酯薄膜固定在测图板 上,在图纸上绘出坐标格网,展绘出图廓点和所有控制点,经检核确认点位正 确后进行测图。测图时,用测图板上已展绘的控制点或临时测定的点作为测站, 在测站上安置整平平板仪
并定向,然后用望远镜照准碎部点,通过测站点的直尺边即为指向碎部点的方 向线,再用视距测量方法测定测站至碎部点的水平距离和高程,按测图比例尺 沿直尺边沿自测站截取相应长,即碎部点在图上的平面位置,并在点旁注记高
程。这样逐站边测边绘,即可测绘出地形图。 传统的平板仪测图和经纬仪(或 测距经纬仪)测图通称白纸测图,它主要采用解析法和极坐标法,其成果为模 拟式的图解图。由于其成图周期长、精度低、劳动强度大等局限逐渐被淘汰。 而全数字地形测图顺应现代测绘技术新潮流,利用先进的测量仪器(如 GPS 接 收机、电子全站仪等)和自动化成图软件,采用各种灵活的定位方法进行的以 数字信息表示地图信息的测图工作,它的成果为模型式的数字图。具体讲就是, 以传统的白纸测图原理为基础,采用数据库技术和图形及数字处理方法,实现 地图信息的获取、变换、传输、识别、存贮、处理、显示、编辑修改和计算机 绘图。 与传统白纸测图相比,全数字地形测图不仅仅是方法的改进,而是技 术本质的飞跃。它主要有以下几个特点:
1、打破了内外业的界线,从首级控制到最终成图,实行一体化作业,并且 大大减轻了室外作业的强度,缩短了成图周期。
2、打破了分级布网、逐级控制的原则。一个测区可一次性整体布网、整体 平差,控制网可以是任意混合,所需控制点数目比传统白纸测图大大减少,图 根控制的加密可与碎部测量同时进行。
3、 碎部点的记录要求具有特定的格式, 这种格式能被数字测图软件所识别, 能和数据库的建立统一起来;碎部点测量时可较多地应用自由设站的方法建立 测站点,确定碎部点坐标的方法除极坐标方法外,还可灵活采用方向交会法、 距离交会法、直角偏距法、导线法、对称点法等诸多方法,根据测区情况,可 采用无码作业和编码作业。
4、碎部量测时不受图幅边界的限制,外业可不分幅作业,由内业成图时自 动进行分幅与接边处理。
地形测量按“ 先控制后碎部”的程序进行作业。一般先以较高精度的控制 点作为测区首级控制,例如某等级的三角点(见三角测量)、导线点(见导线 测量)、水准点 (见国家水准网 ) 等,然后逐步加密精度较低的控制点,最后布 设专为碎部测量应用的图根控制点,简称图根点。
图根控制测量 直接为测图建立平面控制和高程控制所进行的测量。图 根控制点的布设,可采用图根三角、图根导线或交会定点法确定平面位置。图 根三角中比较常用的是线形三角锁(图 1) , 它是起闭于两高级控制点之间的三
角锁, 只测角度, 不测边长。 交会定点法是根据已知的控制点和观测的角度 (或 边长)测定待定的图根控制点(见控制测量)。图根控制点的高程通常用三角 高程测量或水准测量的方法测定。作业时,先根据测区情况和测图要求,选定 图根控制点的位置并用标桩标定,然后进行观测。观测成果合格后,用近似的 平差方法进行成果处理,并计算其平面坐标和高程。
碎部测量 测绘地物和地貌的作业。地形测量中 , 所用的图幅多按正方形或 梯形划分。测图前,必须先在聚酯薄膜或白纸裱糊的测图板上绘制图幅的坐标 格网,按坐标展绘控制点。然后根据控制点测定地物特征点和地貌特征点,即 测定地物的轮廓点或中心位置、地貌的坡度变换点或方向变换点的平面位置和 高程,将有关地物、地貌按比例尺用规定符号描绘在图上。地物特征点和地貌 特征点统称为碎部点。根据控制点测定碎部点的平面位置,最常用的方法是极 坐标法。碎部点的高程,通常用视距测量法(见距离测量)测定。
在碎部测量过程中,控制点的密度一般不能完全满足施测碎部的需要,因 此还要增设一定数量的测站点以施测碎部。
二、实习目的和方式
1. 实习目的
1) 掌握水准仪、全站仪和 GPS 的使用;
2) 掌握导线测量的外业施测过程与方法、内业数据处理过程与方法;
3) 掌握水准测量的外业施测及内业数据处理的过程、方法;
4) 掌握三角高程测量的外业施测及内业数据处理的过程、方法;
5) 掌握全站仪数字化测图的外业测量方法及内业软件的使用;
6) 熟悉大比例尺测图的工作内容及作业过程;
7) 掌握地物、地貌的合理表示与取舍原则。
2. 实习的主要方式
为完成上述实习任务,为了使学生毕业之后能迅速适应社会主义市场经济
主战场的需求,毕业实习的方式包括:现场生产实习、承担生产任务实习、所 进行的综合实习等形式。此外,在实习过程中要及时收集和整理现场资料。 1)到签约单位或工作性质对口的用人单位实习,这样既有利于尽快适应用 人单位的工作业务,也有利于用人单位对我们的全面考察。
2)参加现场生产实习在条件许可的情况下,可参加现场的生产实习,或实 际参加一个工程项目的建设过程。了解与本专业有关的主要工程任务、完成工 程的方法及过程,本专业的发展概况、科学管理的方法、目前现状以及作为一 个工程项目其完整的工作流程。
了解所在项目组的内容、人员配备及分工、组织和管理、采用的技术标准、设 备的配备和选型、工作方法、工作手段等。充分掌握工程项目的工作流程与管 理方法等。
3) 承担生产任务实习
为了积极适应市场经济发展需求,为了毕业之后能够满足用人单位的需要, 可对毕业实习进行了大胆革新,通过承担生产任务和横向技术服务完成毕业实 习工作。直接从事生产任务实习,真刀真枪的干,充分掌握生产项目的全部流 程与管理方法,以及本项目组的具体任务、人员配备及分工、组织和管理、采 用的技术标准、仪器的配备和选型、工作方法、工作手段等。
三、仪器设备及成图软件
仪器:徕卡水准仪 徕卡全站仪 1201+天宝 S6 徕卡 GPS
成图软件:南方 CASS7.1 Arc gis10.0 中文版
四、项目概况即测区概况
1. 项目概况
国家级风景名胜区凤凰山是辽宁四大名山之一, 位于丹东市西北 57公里处, 北距沈阳市 213公里,西南距大连市 300公里,占地 24平方公里。
山高林茂,瀑布流泉,气势雄伟壮丽,四季景色各异,文物古迹比比 皆是,是著名的旅游胜地,以其 “ 景、峰、险、石、洞、泉、物、庙、刻、迹 ” 等十大景观为主线、重点景观 100多处,集 “ 雄、险、幽、奇、秀 ” 于一身,其 景色集中、险夷莫测。环山的庙宇、石刻和其它人文景观,构成了一幅美丽的 中国山水画卷。 1994年 1月 10日, 凤凰山被国务院批准列入国家重点风景名胜
实时定位的结果及变化、存储介质记录和电源情况等,如发现异常情况或未预 料到的情况,应记录在测量手薄的备注栏内,并及时报告组长。
每时段观测开始及结束前各记录一次观测卫星号、天气状况、实时定位经 纬度和大地高、 PDOP 值等,当记录气象元素时,每时段气象观测应不少于 3次(开始、中间、结束)。
观测期间,不得在天线附近 50m 以内使用电台, 10m 以内不能使用对讲机 或手机通话。
一时段观测中不允许进行以下操作:接收机关闭又重新启动;进行自测试; 改变卫星仰角限值;改变数据采样间隔;改变天线位置;按动关闭文件和删除 文件等功能健。
5)数据处理
数据处理采用随接收机配备的商用软件,起算坐标系采用 WGS -84坐标 系。
当采用不同类型接收机时,应将观测数据转换成同一格式,基线处理采用 广播星历,双差固定解。
GPS 观测值均应加入对流层延迟修正,对流层延迟修正模型中的气象元素 采用标准气象元素模型。
6)重测和补测
未按施测方案要求,外业缺测、漏测或数据处理后,观测数据不能满足规 定时,有关成果及时补测。对需补测或重测的观测时段或基线,具体分析原因, 尽量安排一起进行同步观测。
7) GPS 网平差
在基线向量检核符合要求后,以三维基准向量及其相应方差—协方差作为 观测信息,以一个点的 WGS — 84系三维坐标作为起算依据,进行 GPS 网的无 约束平差。基线分量和改正数绝对值应满足下式:
V △ x ≤ 3σ, V △ y ≤ 3σ, V △ z ≤ 3σ
否则认为该基线或其附近的基线存在粗差,应在平差中采用软件提供的自 动方法或人工方法剔除,直至上式满足。然后在 WGS-84坐标系下进行二维和 三维约束平差。最后固定各已知点的北京坐标及
高程进行三维平差。
8)动态 GPS 观测技术要求:
流动站距参考站的距离一般不超过 3km 。
参考站采用静态 GPS 控制点或国家四等以上控制点,由一参考站迁到另一 参考站后应对两控制点进行检核。 检核限差:Δx ≤ 5cm ; Δy ≤ 5cm ; Δh ≤ 10cm ; 不允许在控制点上发展参考站。
GPS 实时动态(GTK )测量应按规定对仪器进行检验,作业前做好星历预 报,合理安排野外作业时间,作业时应按照随机操作手册进行。
9) GPS 测量预期精度
静态 GPS 测量预期精度(相邻控制点间):Mx ≤ 5cm ; My ≤ 5cm ; Mh ≤ 10cm ;
动态 GPS 测量预期精度(相对高级控制点:参考站):Mx ≤ 5cm ; My ≤ 5cm ; Mh ≤ 10cm ;
3. 水准测量与计算
依据几何原理用水准仪和水准标尺测定地面两点间高差的方法。高程测量 的主要方法。用于建立国家水准网和地区高程控制网,监测地壳垂直运动,研 究平均海水面变化,以及为地形测图和各种工程建设提供高程控制。
水准测量是用沿水准路线逐点向前推进的方式实施。为了测量地面上 A 、 P 两点间高差(见图),先将水准标尺 R 1竖立在水准点 A 上,再将水准标 尺 R 2竖立在一定距离的 B 点上,在 A 、 B 之间安置水准仪。依据水准仪的水平 视线,在标尺上分别读数,两标尺读数差就是 A 、 B 两点间的高差 h AB 。第一站 测完后, B 点上水准标尺 R 2保持不动, A 点的水准标尺 R 1移至 C 点,水准仪 移至 BC 的中间,测得 B 、 C 两点间高差 h BC ,如此继续推进至 P 点, A 、 P 两 点间的高差 h AP =hAB +hBC +…… 。
水准测量原理示意图
水准测量首先是选定水准路线和埋设水准标石。水准路线应选在坡度 小的交通线上,水准点位置应选在能保证标石稳定,长期保存并便于观测的地 点。中国国家水准点上的标石分为基岩水准标石、基本水准标石和普通水准标 石 3种。基岩水准标石埋设在一等水准路线上,大约每隔 500千米一座,作为 研究地壳垂直运动的依据。基本水准标石埋设在一、二等水准路线上,每隔 60千米左右一座,用于长期保存水准测量成果和研究地壳垂直运动。普通水准标 石埋设在各等水准路线上,每隔 2~6千米一座,直接为地形测图和各种工程建 设提供高程控制。
精密水准测量必须用带测微器的精密水准仪和膨胀系数小的因瓦水准标 尺,以提高读数精度、削弱温度变化对测量结果的影响。仪器至标尺的距离约 在 35~60米,且距前后标尺的距离基本相等,同时采用完善的观测程序,以削 减水准仪残余的微小倾斜带来的影响和大气折光影响。
水准测量结果须按所采用的高程系统加入必要的改正,以求出精确的高 程。
水准测量记录格式表
m ) 376 . = m 068 . 0
) +
=
) (已 知 B
最后推算出的 B 点高程应与已知的 B 点高程相等,以此作为计算检核。 4. 外业数据采集
全站仪为徕卡公司的 402仪器,以其性能指标如下:
测角精度 2秒
测距精度 2+2PPM
1)坐标系统
平面采用北京 54坐标系 3度带坐标,投影带中央子午线经度为 115度。 高程基准 :黄海高程系。
2)技术依据
术监督局颁发
3)图根点的确定
确定图根时尽量利用已知的国家高级点。也可自行根据实际情况定图根点。 本测区内利用高级点 1个,自己埋设的图根点有 22个。
4)数据采集作业过程
遵循 “ 从整体到局部 ” 、 “ 先控制后碎部 ” 、 “ 由高级到低级 ” 、 “ 步步有检核 ” 的原则。每次作业顺序为:
1. 确定测站点。确定测站点时,要尽量保证大的可视区域,同时还要保证有 可通视的已知点。所以,在实际作业时一般将测站点定在较高的坡或山顶,以 避免经常迁站。
2. 架设仪器。架设仪器时,要保证仪器架稳,一般是将三脚架的腿间距稍微 放大些,保证平稳。角度过大将导致全站仪过低,给观测带来不便,同时也影 响观测员的行动;角度过小时全站仪放置不稳,存在仪器损害的潜在危险。观 测前要进行仪器的校验,对准已知点,以保证数据均为可信数据。检查中心连 接螺旋是否旋紧,对中、整平、量取仪器高、开机。按提示输入测站点点号及 固定坐标、仪高,后视点点号及、坐标、镜高,仪器瞄准后视点,进行定向检 测。仪器定向后,即可进入 “ 测量 ” 状态,输入所测碎部点点号、镜高后,精确 瞄准竖立在碎部点上的反光镜,按 “ 回车 ” 键,仪器即测量出棱镜点的坐标,并 将测量结果保存到前面输入的坐标文件中,同时将碎部点点号自动加 1返回测 量状态。再输入镜高,瞄准第 2个碎部点上的反光镜,按 “ 回车 ” 键,仪器又测
量出第 2个棱镜点的坐标,并将测量结果保存到前面的坐标文件中。按此方法, 可以测量并保存其后所测碎部点的三维坐标。
3. 立棱镜, 测量读数。 立镜时要保证镜竿尽量竖直, 每个碎布点保持间距 20-25米左右。实际碎部点间距大多在 20米左右,符合精度要求。全站仪能够自动保 存数据,读数较快。一般有三到四人负责立棱镜,其中三人同时立镜。
4. 记录。本次外业数据采集作业采用的是无码作业,这种方法的优点是 采集数据速度快,缺点是只能是采集数据,无法对数据的性质进行分类记录, 所以在观测同时要进行草图的勾绘,如:山脊线、山谷线、探槽等特殊数据就 要在草图上记录下来,以便内业作业。一般由一人主测,另一人勾绘草图 5. 测站点检验及校和。在测量完仪器能测量范围后或迁站时,要进行一 次测站点检和。检和方法为:重测某一已知点(一般为后视控制点),检验两 次误差是否符合技术要求。如果误差超出范围则所测数据有误。
6. 在平原地区,野地地形较简单, 但主要沟坎不可放过, 因地势较平 坦, 高程点可以稀一些, 但有明显起伏的地方, 高处应延坡走向有一排 点, 坡下有一排点, 这样画出的等高线才不会变形, 画上沟坎后, 等 高线钻进沟坎,这样等高线才不会相交。平原地区的房屋应在一排房的两边控 制, 不可以用短边两点和长边距离画房, 那样误差太大。有必要时该上房 则上房 ,可以得到事半功倍的效果。有些地方无法看到,可用仪器把周围打 出来,里面的用钢尺量, 不要以为钢尺量的不准, 实践证明,量出来的和 测的一样准, 而且可以提高效率。 测图时一定要注意电杆的类别和走向以 及是否有地下接口。有的电杆上边是输电线,下边是配电线或通讯线,应画主 要的。成行的电杆不必每一个都测,可以隔一根测一根或隔几根测一根,因为 这些电杆是等间距的,在做内业时可用等分插点画出, 精度也很高, 但有 转向的电杆一定要测。道路要测一边,量出路宽,这样画出来才好看。 地下 光缆不可放过, 但有些光缆, 例如国防光缆须经某些部门批准方可在图上 标出。
7.在测山区时 , 主要是地形 , 但并不是点越多越好 , 做到山上有点 , 山 下有点,确保山脊线,山谷线等地性线上有足够的点, 这样画出的等高线才 想且不变形。在山区特别是在半山腰建的房子, 要把周围的大坎画出 , 这
样在图上才可看出房屋是一层层的,有立体感。 在山区测图最好在山顶或半 山腰设站,这样可以减少搬站,效率高。
8.测量员要对各种地形地物有一个总体概念,知道什么地物由几个点画 出,一般点壮物一个点, 线壮物两个点, 圆形建筑物三个点, 矩形建筑 物四个点?? 这也是对测图软件的熟悉程度。
9.碎步草图,在山区要和地形联系起来。 房屋相对位置要画好, 这 样回去后便于处理内业和查错。 有写地物如电杆, 井盖, 可提出单独画, 会使草图清晰不乱。
10.在碎步测量支站时, 有时站支的太远 , 定向要跑很远 , 为了避免这样, 你可以一下支出两站,让两站较进,一个做摆站点,一个做定向点。
11.有些全站仪,如苏一光,在换电池后须重新定向,但跑尺的正在另一 个山上或很远,再去定向很费时费事,你除了可以在搬站时换电池,还可以在 电池快没电之前,先测一个点,然后换下电池,再用测的这个点定向,问题就 解决了。
5)特殊地物的测量
测区内的主要特殊地物有:居民地、牲口棚、大车道、铁丝网。
居民地:居民地内主要地物为四点民房,可采用测三点法,草图记录点号。 牲口棚测法与四点民房相同。
大车道:大车道的方法为测道路中线,量宽度,记录点号。大车道测量时, 在直道是可较长距离测一点,拐点处必测。
五、实习总结
这次实习,相比于以往的教学型实习,真正的工程(实习)显然能够更好 的体会所学到的知识。事实也确实是如此,通过这次实习,我真正的体会到了 理论联系实际的重要性。测区属于凤凰山的一部分,动植物种类较少,地势比 较陡峭,地貌比较复杂,但在这实习的一年里还是体会到了从未有过的艰辛。 现在细细想来,这一年的经历,虽然艰苦,但却学到了很多,不仅仅是测量的 实际能力,更有面对困难的忍耐。
我明白了扎实的专业知识是提高工作水平的坚实基础 . 在学校学习专业知 识时 , 可能感觉枯燥无味 , 但当你工作以后 , 你才会发现专业知识是多么的重要 .
如我学的工程测量 . 在学校我们只学了些皮毛 , 通过毕业测量实习,我学到了很 多,比如对软件的操作更加熟练,加强了对所学知识的理解和掌握, 很大程 度上提高了动手和动脑的能力。书上得来终觉浅,绝知此事要躬行。在实习中, 面对的是实实在在的任务,来不得半点推委和逃避。因此,这让我深深明白理 论知识的重要,在学校余下的时间里,我要安心把所学的理论知识进行梳理和 回顾,做到胸中有沟壑,一目了然。为以后实际的工作打下坚实的基础。 测量学首先是一项精确的工作,通过在学校期间在课堂上对测量学的学习, 使我在脑海中形成了一个基本的、理论的测量学轮廓,而实习的目的,就是要 将这些理论与实际工程联系起来,这就是工科的特点。测量学是研究地球的形 状和大小以及地面点位的科学,从本质上讲,测量学主要完成的任务就是确定 地面目标在三维空间的位置以及随时间的变化。在信息社会里,测量学的作用 日益重要,测量成果做为地球信息系统的基础,提供了最基本的空间位置信息。 构建信息高速公路、基础地理信息系统及各种专题的和专业的地理信息系统, 均迫切要求建立具有统一标准,可共享的测量数据库和测量成果信息系统。因 此测量成为获取和更新基础地理信息最可靠,最准确的手段。测量学的分类有 很多种,如普通测量学、大地测量学、摄影测量学、工程测量学。作为测绘工 程专业的跑棱镜的,我们要学习测量的各个方面。测绘学基础就是这些专业知 识的基础。
通过这次实习,锻炼了很多测绘的基本能力。首先,是熟悉了全站仪的用 途,熟练了全站仪的各种使用方法,掌握了仪器的检验和校正方法。其次,在 对数据的检查和矫正的过程中,明白了各种测量误差的来源,其主要有三个方 面:仪器误差(仪器本身所决定,属客观误差来源)、观测误差(由于人员的 技术水平而造成,属于主观误差来源)、外界影响误差(受到如温度、大气折 射等外界因素的影响而这些因素又时时处于变动中而难以控制,属于可变动误 差来源)。了解了如何避免测量结果错误,最大限度的减少测量误差的方法, 即要作到:(1)在仪器选择上要选择精度较高的合适仪器。(2)提高自身的 测量水平,降低误差水平。(3)通过各种处理数据的数学方法如:距离测量中 的温度改正、尺长改正,多次测量取平均值等来减少误差。第三,除了熟悉了 仪器的使用和明白了误差的来源和减少措施,还应掌握一套科学的测量方法,
在测量中要遵循一定的测量原则,如:“ 从整体到局部 ” 、 “ 先控制后碎部 ” 、 “ 由 高级到低级 ” 的工作原则,并做到 “ 步步有检核 ” 。这样做不但可以防止误差的积 累,及时发现错误,更可以提高测量的效率。通过工程实践,真正学到了很多 实实在在的东西,比如对测量仪器的操作、整平更加熟练,学会了数字化地形 图的绘制和碎部的测量等课堂上无法做到的东西,很大程度上提高了动手和动 脑的能力,同时也拓展了与同学的交际、合作的能力。
一次测量实习要完整的做完,单单靠一个人的力量和构思是远远不够 的,只有团队的合作和团结才能让实习快速而高效的完成。而这些,就是在测 量之外所收获的了。团队成员的合作很重要,实习团队的气氛很大程度上影响 实验的进度。在去东北之前,所有人的热情都相当高,不仅仅是对测绘的外业 感兴趣,更多的是对东北的好奇。在工程正式开始之后,每个组(全站仪)都 有一位组长和四位跑棱镜的,组长不但要做好团队的管理工作,还要对我们及 时指导。在最初几天的新鲜感过后,每天重复而乏味的翻山越岭的体力劳动让 很多人怨声载道,说实话,我也是如此。但工程本身的性质又不允许工期的延 后,所以不得不继续早出晚归。其实现在想来,也许绝大多数工作都是如此, 这更多的只是从未有过的疲劳所带来的压力。最终也能够正确地完成了任务, 看到了自己的成果。 对于测量来说, 确实没有一个人的英雄, 只有做好合作 —— 包括本团队内部和各团队之间,才能保质保量地完成任务。
计算机技术的迅速发展和信息革命浪潮的冲击 测绘必然由自动化、数字 化、信息化方向发展。数字测图取代模拟测图将成为必然。目前数字测图有两 种模式 1. 数字测记模式:野外测记, 业成图。 一般使用的仪器是全站 仪 , 测量时全站仪直接记录点号 、 三维坐标 , 但是不能记录点间连接方式 , 同 时配画标注测点点号的人工草图, 到室内将坐标直接从全站仪传入计算 机, 然后根据草图采用人机交式编辑成图。 这种方法成本交低,且精度交 高,被普遍采用。 2. 电子平板测绘模式:内外业一体化 ,所显即所测,实 时成图。电子平板模式——全站仪 +便携机 +测图软件,外业测图时同时把数据 传给计算机绘图,从而使数字测图的质量和效率全面超过白纸测图。随着便携 机价格的下降,电子平板将发展成数字测图的住流。随着科技的进一步发展, 数字测图将向自动化方向发展。全站仪自动跟踪测量模式。测站为自动跟踪是
全站仪, 可以无人操作,可以遥控开机测量,全站仪自动跟踪, 自动描准, 自动记录。我想在测量山地地区的等高线时十分方便。 GPS 测量模式。随着 RTK 实时动态定位技术的发展,它能够提供测点在指定坐标系的三维坐标成果在测 程 20KM 以内可达到厘米几级精度。 RTK 与电子平板测图系统连接,就可以现 场成图, 并能实时给出点位坐标, 实现一步数字测图(无需先控制后碎部) 提高了劳动生产率 。 由于棱镜技术的发展也将大大减轻野外作业的劳动强度。 对数字化成图软件的使用感受。我们所用的是南方测绘公司的 CASS5.1软件。这是一款以 AutoCAD 2000为基础开发的专业测绘成图软件 , 使用方法简 单,成图速度快,功能方面也足以满足实际需要。但软件稳定性稍有不足,成 图错误较多,可能在成图时为追求速度而简化了计算过程。通过内业实习的数 据整理和作图,将课堂上所讲的知识和实际应用结合到了一起,又一次感受到 了理论联系实际的重要性。
总的来说,这次实习让我体会到了外业的艰辛,内业的耐心,工作的细 心,甚至还有了对建国初的测绘人员的敬畏之心。锻炼了实际的能力,让我在 未来面对选择时更有信心和勇气。感谢黄河水利职业技术学院给了我们参与这 次实际工程的机会,同时也要感谢南阳联谊通盛软件有限公司对我们耐心指导。
2011年 10月
转载请注明出处范文大全网 » 房产测量规范(最新版)