The analysis on reliability aspects of wind power finds more significance as compared to that inconventional power generation systems. In spite of the intermittent and variable nature of wind energy,it can be usefully tapped to generate electrical power for meeting part of the energy demand of thepopulation. The present paper undertakes an analysis on the reliable aspects of wind energy conversionsystem and applies to seven wind farms in Muppandal region in India. For the purpose of analysis, tworeliability indices are used; one is coined as the period during which the expected wind energy is notsupplied and the other one is the loss of load expectation index which analyzes the degree of matching ofwind farmpower generation with the load model. The study also investigates the effect of increasing thehub height of wind energy conversion systems.
摘要
与传统发电系统相, 风电的可靠性分析有意义。 尽管风电具有间断性和不 定性, 但仍可以利用风电来足部分人口对电的求。 本文分析风电机组 的可性并应用于印度 Muppandal 地区的七个风场。分析中应用了两项可性指 标:一风电不供电期望, 另一项是分载荷型与风场发电的相匹配时的失 载期望指数。并对增加风
Keywords:
Reliability
Wind power
Loss of load expectation
Energy delivery factor
Availability
关键词:可靠性、风
Contents
1. Introduction
2. Description of wind farms taken foranalysis
3. An overview of the definitions used for wind energy conversion system performance evaluation
3.1. Energy delivery factor
3.2. Expected wind energy not supplied
3.3. Loss of load expectation
3.4. Availability of a wind turbine
4. Reliability analysis of wind farms
4.1. Evaluation of expected wind energy not supplied
4.2. Evaluation of expected wind energy not supplied
4.2.1. Load demand curve
4.2.2. Analysis
5. Conclusions
References
目录
1. 前言
2. 本文所
3. 风电机
3.1. 能量传递特性
3.2. 风
3.3. 失载期望
3.4.
4.
4.1. 风
4.2. 风
4.2.1. 载荷需求曲线
4.2.2. 分析
5. 结论
参考文献
1. Introduction前言
The assessment of the reliability of wind farms in generationsystems is essential from the planning point of view. Researches onthe improvement in performance of wind power plants are gettingimportance as its application is increased rapidly [1– 3]. The windturbine generators in a wind farm will not have a fixed capacitydistribution, owing to the constant variations in the outputs ofeach wind turbine output despite all of them being fed from thesame wind energy source. Hence, a wind energy
conversion systemcannot produce power at its rated capacity throughout the year.Due to the partial availability of wind generated power, the actualcapacity value of a wind power plant in a utility system is relativelylow, which is equivalent to the wind power plant’s capacity factormultiplied by its rated capacity [4]. The relationship between thewind turbine power output and wind speed is non-linear andhence the power
output characteristics of wind energy conversionsystem are different from that of any conventional generationsystems. Even though wind energy is not consistent, wind powerplants contribute to meet the energy demand requirements.
从计划的角度说, 并发电风场的可靠性评估至关重。 风场性能改进与 其应同样重要,关于此方面研究越来越多。尽管风轮处于同样的风能条, 但其输出总是变化, 致使场中发电容量不恒定。 由此, 风电机全年不 可能按其设定容发电。 由风力发电不完全可行, 在役场的实际容量相当低, 相当于特系数与其设定容的乘积。 风轮的输出与风速之间呈非线性系, 从风电机的能量输出特性与其他传统发电系统迥异。 但是, 虽然风电不持
In recent years, wind energy based generation has witnessed anexponential growth in most developing countries. In India, several states have increased their wind energy penetration into thesystem grids to supplement the existing generation fromconventional sources, namely, hydro and thermal options. Itwould appear that in
view of the rapid growth of wind energygeneration in India, this form of evaluation studies can helpplanners in understanding the scope, limitations and future of suchsystems in the Indian environment.
近年来, 许多发展中国家力发展风能产业。 印的诸多州郡已经实行电 入网作传统水、 热能的补充。 随着风产业的迅猛发展, 本文所提出的研 形式以帮助决策者了解在现行度环境中此类系统的发展空间、 限
As actual field data is needed for the analysis of reliable aspectsof wind power, it is necessary to obtain this data from wind farmsin India. Field data collected from a set of seven wind farms inMuppandal region of Tamilnadu, India, are used in this study.
出于风电可靠性分析的需要, 我们有要从印度场获取这些数。 本文所用的 据源自 Muppandal 地区
2. Description of wind farms taken for analysis
The state of Tamilnadu is in the southern region of India atlatitude between 8.5N and 13.35N and longitude between 76.15E and 80.20E. The geographical location of the state ofTamilnadu is favourable for wind power development due to thepresence of major mountain passes along the western border of thestate. This state is ahead of other Indian states with more than 50%of the total installed wind energy capacity of India. Tamilnadu statehas experienced an encouraging response from the private sectorever since the inception of wind power in the country. It has a totalinstalled wind turbine capacity of 4906.74 MW, of which4887.34MW by the private sector and
19.4MW in the form ofgovernment demonstration projects [5,6].
2. 分析
Tamilnadu 州位于印度南部地区,东经 76.15-80.20,北纬 8.5-13.35之间。 T 州西 临山脉, 地条件非常适展风电。 该州风电装总容量占印度全境 50%多, 在诸州中位列第一。建造风电伊始, T 便从民用风电机获益匪浅。该州风电 装机总容 4906.74 MW,民用部分占 4887.34 MW,
The Muppandal region in Tamilnadu has the distinction ofhaving one of the largest concentrations of wind turbines at asingle location. In this region, wind farms are spread along thenational highway from Muppandal to Kanyakumari, at theconfluence of the Bay of Bengal, Arabian Sea and the IndianOcean. The Aralvaimozhi mountain pass strengthens the winds ofSouth-West monsoon, which blow from May to September andreaches a maximum wind speed of 30 m/s. The annual averagewind speed in this area is 6– 7 m/s.
T 州 M 地由于拥有单机量最大的风机而闻名。地位于印度洋、阿拉海和 Bengal 交汇处, 风机安装在 M -K 高速治线。 A 山脉加强了 5月到 9月的西南季风, 便之最速度达到 30m/s。该地区年平
The field data used for this study are from seven wind farms inMuppandal, Tamilnadu, India, for a period from April 2002 toMarch 2005. The data covers 135 wind turbines with a totalcapacity of 37MW from the seven wind farms and the details aregiven in Table 1. The data is intended to be typically representativeof that of an Indian wind farm located in a region of high windpotential. The capacity of the selected wind farms ranges from1 MW to 11.5 MW. Energy generation from each turbine,
generationhours, machine maintenance and breakdown hours, gridmaintenance and breakdown hours, wind speed and economicparameters are the main variables collected from these windfarms.
本文所研究的风场据源自印度 T 州 M 地风场从 2002年 4月至 2005年 3月的记录。 这些数含概了七座风场中机容量 37MW 的 135组风机行参数,详见表 1。 这数据可以作为印度风能潜藏量丰富地区的典型案。七座风场装机从 1MW 到 11.5MW 不等。所选取的主要参数包括:单机发电量、发电时间、机械故
3. An overview of the definitions used for wind energyconversion system
performance evaluation
3. 风电机
3.1. Energy delivery factor
The key performance measure of any power plant is the electricenergy it delivers over the year. The quantity of energy delivereddepends on the rated power capacity of the plant and depends onhow fully that capacity is utilized. The normalized measure of thewind power plant performance is the energy delivery factor (EDF)which is also called as capacity factor [7,8]. The energy deliveryfactor reflects how effectively the wind turbine could harness the energy available in the wind spectra. The annual energy deliveryfactor is given as:
wherePR is the rated capacity of the wind turbine, Pd(t) is thepower delivered to the
grid at any given time t.
3.1. 衡量电厂性能重要数据年供电。供电量取决额定容量及其利
),也叫容量特
围内风机对风的
其中 PR 是风机的额容量, Pd(t)是任意给
In the present study, the energy delivery factor is analyzed ondaily as well as monthly power generation from the seven windfarms. The wind generated power varies every instant and hence itis necessary to examine its reliable production for a utilityindustry, how much to be dependent on daily or monthly basis.
本研究按天或按月分析七座风场所电量的供电性。由于风发电的瞬变性, 因此检测工业用电使用电的可靠性以及每天或每月多大程度上使用风
The energy delivery factor incorporates the energy conversionefficiencies of various components of the wind turbine and theavailability of wind and wind turbines. From a study of theavailable data on the wind farms, it is seen that the wind farmsconsidered for study operate at an average annual EDF of around21%. It must be understood that the wind farm EDF varies with theseason, having higher values during the windy period and lowervalues during less windy periods of the year. Fig. 1 shows widevariation in the energy generation, with EDF’s ranging from 0.297%to 66.48% in a year.
风电机各部件间的机效率风场及风轮的
从对几座风场的可靠数据的究中发现, 风场的年 EDF 约为 21%。 必指出, 风 场的 EDF 与季息息相关,多风季节数值较高而少风
图 1 随
3.2. Expected wind energy not supplied
The reliability of the wind power plant is evaluated by an indexcoined for the purpose called expected wind energy not supplied(EWNS). This index gives the expected period during which thetotal generation capacity (taken in terms of daily or monthlyenergy delivery factor) not exceeding a given power level (taken interms of annual energy delivery factor).
The EWNS is given by:
where i is the time step, a day or a month, n is the number of days ormonth, EDFiis the energy delivery factor in time period i, AEDF isthe annual energy delivery factor and Pi(EDFi
3.2. 风
风电可靠性的另一项评估指标是风场不供期望 (EWNS ) , 该表示某时段发 电总 (日或月供电特性参考在) 未达到既定水平 (日
EWNS =(2)
其中 i 表示单位时间,日或月; n 表示单时间的数量; EDFi 是 i 间段内的供 电特性; AEDF 是年均供电特性; Pi (EDFi_e3("单");</script>位时间 i 内的供电特性未
3.3. Loss of load expectation
The reliability of wind energy conversion systems can be
evaluated by the index, loss of load expectation (LOLE). LOLE is the expected period during which the load demand exceeds theavailable generation capacity [9– 13]. The LOLE is defined as:
where i is the time step, an hour or a day, n is the number of hoursor days, PGiis the power generation available in time period i, PDiisthe load demand in time period i and Pi(PGi
3.3. 失载期望
失载期望 (LOLE ) 可来衡量风机组的可性, 它表示某
LOLE =(3)
其中 i 表示单位时间, 日或小时; n 表单位时间的数量; PGi 表单位 i 在功 率允许范围; PDi 表示单位时间 i 电网需载荷; Pi(PGi
3.4. Availability of a wind turbine
The ‘availability’ of a wind turbine refers to the percentage oftime it is in a position or state for generating power. Servicing,inspection, component failures and accidents, such as lightningstrokes reduce the availability of wind turbine. The availability ofeach wind turbine in a wind farm may differ depending on the netperiod of time for which it is functional in regard to powergeneration [14]. Grid breakdown and maintenance period areincluded in the calculation of availability factor since grid failureresults in stalling of wind turbine. Data pertaining to the up anddown times of the various turbines in the seven wind farms is usedto estimate the availability that is given by Eq. (4). Fig. 2 shows theaverage availability of the seven wind farms.
3.4.
这里的可行性指标示某地区风机可以发的时间比。 维护、 检查、 部件坏及 事故 (诸如雷击) 原因都将降低该。 由于风各风机净发电时间不同其 可行性指标也同。 网故障及维护造成风机停运, 此时间也要考到可行性指 。七座风场各风机运行和非运时间相关数据按公式(4)计算其可行性 指标。图 2显
4. Reliability analysis of wind farms
4.1. Evaluation of expected wind energy not supplied
The reliability analysis is carried out for two cases. In the firstcase, the reliability evaluation is done with daily energy generationdata and in the second case with monthly energy generation data.The capacities and annual energy delivery factor of the seven windfarms are given in Table 2.
In the seven wind farms taken for study,wind farm WF6 shows the highest annual energy delivery factor of25.9%. Even though the wind farms are sited in the nearbylocations, the energy delivery factor differs in each wind farm. Thismay be due to site specific factors such as strength of wind spectra,machine efficiency. The study is extended to investigate the effectof increase in hub height of the existing wind turbine in the twocases.
4.
4.1. 风
该可靠性分析有两情况:一种是以每天的电数据进行可靠性分析, 另一种是 以月发电数据进行的。七座风的容量及年均供特如表 2所。所研究的七 座风场中, 风场 WF6年均 25.9%的供电特性居高。 虽然七座风场地理相距不 远, 但供电特性各不相同, 这可是诸如速及机械效率不同造成的。 本研究探 讨了在两种情况
Fig. 2.Average availability of wind farms.
For the first case, the number of days the expected wind energynot supplied is evaluated and is given in Table 3.
The resultsobtained show that the expected wind energy not supplied in ayear is 191.5 days and a wind energy conversion system is 47.55%reliable in meeting the expected wind energy.
第一种情况中,不供电期望的天评估如表 3所示。所得果显示,不供电
To enhance the reliability of wind power plant, it is necessary toimprove the overall performance of the plant. The reliability indexcan be improved if the amount of energy generation increases. Achange of many parameters in an existing wind farm may not becost effective. Therefore, the analysis is carried out by increasingthe hub height of the existing wind turbine which increases thepower generation. As the hub height increases the rotor blades areexposed to higher wind speeds, since the wind speed increaseswith altitude. The average wind speed measured at a given heightis related to the average wind speed measured at another height inthe same vertical plane and is given as [15]:
whereV(h) is the wind speed at the height h, V(hr) is the wind speedat the reference height, hrand αis the power law exponent and istaken as 0.3. The exponentαis an empirically derived coefficientthat varies with parameters such as surface roughness, wind speed,temperature [15]. Assuming that there is no variation in air densityand the blade diameter, the power generation at given height, P(h),can be expressed as
whereP(hr), is the power generation at the reference height.
为了提高风电机组的可靠性, 有必要全方面改良组性能。 通过加发电量可 提高靠性指标。 现存风场的多参数改变未必影响其效率, 故文针对提高 轮毂来增加发电的方法进行研究。 由于风速随
提高轮毂
可以使风轮叶片捕获更高的速。 一地点速与高度存
其中 V(h)是高度为 h 处的风速; V(hr)是同地点参考高度 hr 的风速; α是数, 一般取 0.3,它一个验系数,与地表粗糙度、风速、度等参有关;假设 空气密度和叶半径不变,发电量设为 P(h),
(6)
其中 P(hr)是在参考高度的发电量。
The hub height of the wind turbines in the wind farm isincremented in steps of 2 m for simulations. The obtainedreliability index is given in Table 3.The increase in hub heightshows that the reliability index, EWNS decreases in each step, thusrepresenting an improvement in reliability. The analysis showsthat the reliability improves to an average of 12.04% with increasein hub height of 10 m.
模拟中风场的风轮轮毂高度每次提升 2m 。测得的可靠性指如表 3示。以看 到随着轮毂高度递增 EWNS 递减,从而靠性改善了。分析表明轮毂提 10m 时 可靠性平均提
In the second case, the number of months the expected windenergy not supplied is evaluated. The results obtained show that atthe base hub height, the expected wind energy not supplied in ayear is 6.9 months and a wind energy conversion system is 42.2%reliable in meeting the expected wind energy. The increment in thehub height analysis is also carried out with monthly generationdata. Table 4 gives the reliability index at different hub heights.Tables 5 and 6 give the EWNS index obtained for all the seven windfarms separately and the EWNS index for the three years for whichthe data are collected.
第二种情况, 供电期望按月评估。 所得结果显示, 轮毂在基本高度不供电期 望月数是 6.9个月, 与之相风电机组性是 42.2%。 同样对轮毂高度高按 发电数所进行了分析。表 4给出了不同时的可靠性数,表 5和表 6分别给 了所得的七座风场各自的 EWNS 指数和所选取的三
4.2. Evaluation of expected wind energy not supplied
The chronological hourly generation data for each month of thewind farms is compared with load demand of a chronologicalhourly load demand model. The total installed capacity of theseven wind farms from which the data are collected is 37 MW. Themaximum hourly average power generation from these sevenwind farms is 15 MW, which is 40% of the installed capacity. Thispower generation is somewhat low in comparison with the ratedwind farm capacity, mainly due to the stochastic nature of wind,availability of wind turbines and grid etc.
4.2
几座风场每月的发电数据与应的载荷需求逐小时进行较。 采集数据的座风 场总机容量 37MW 。七座风场最大时均发电功率是 15MW ,占总容 40%。此发 电量与风场额定量相比较低,主要由于风的随机性,
4.2.1. Load demand curve
For the reliability estimation, information of the load curve isessential. Since the wind farms are located in Muppandal in thestate of Tamilnadu and feed the state grid, it is appropriate to applythe analysis to the load demand curve for the state grid. The actualstate grid is supplied with power from sources of generation otherthan wind power. Hence, to isolate the contribution/impact of thewind farms alone, it became necessary to scale down the state gridsuch that the peak demand of the grid corresponds to thatassociated with the wind farms. The load curve as applied to theevaluation of the reliability of wind farms therefore is derived by scaling down the actual load demand curve pattern. The peak loaddemand is taken as 15 MW, which is equal to the maximum hourlyaverage power generation. The obtained load curve for the study isof the similar trends of the state grid load curve, but withmagnitude reduction. Fig. 3 shows the load curve for the reliability evaluation. The LOLE index is obtained by comparing hourlyaverage generation of each month with the corresponding hourlyload demand.
4.2.1载荷需求曲线
为了可靠性估, 绘制载荷线信息很必要。 由于风场落在 T 州 M 地并向电网供 电, 可以应用电网需求曲线进分析。 实际上, 不单单是风场向电网供电, 此, 为区分出风场单独的电, 有要按比例缩网的数据以使电网的峰值需求 与风的峰值相一致。 这条载荷曲线于估计风场可靠性, 因此它只是按比例 缩小实际的载荷需求曲线样版。 峰值载需设 15MW , 风场最大的时均 发电功率相同。 所得到的研究线与电网荷曲线走
图 3 应用可
4.2.2. Analysis
Table 7 shows the LOLE in hours per year and the reliability in
percentage. The percentage reliability (R) is calculated as given below:
Reliability (7)
When the peak load demand is assumed equal to the maximumhourly average power generation, which is 40% of the total installed wind power capacity; the loss of load expectation index isobtained as 261.77 h/year. This means the wind farm reliabilitycontribution is 9.11% in meeting the load demand. A very low valueof percentage reliability is obtained, because the hourly powergeneration is higher than the demand only for a few hours in the months of June, July and August. This is shown in Fig. 4.
Theanalysis is done further by scaling down the load demand profile toachieve 50% reliability in meeting the load demand. Hence the peakload demand is decreased by 5% in each step. The LOLE index andthe corresponding percentage reliability are shown in Table 7.
When the peak load demand is 20% of the total wind powercapacity, the reliability of 53.29% is obtained. The profiles ofwind power generation and load demand at 20% of the total windpower capacity May, July, September and December are shown inFig. 5.
4.2.2. 分析
表 7按小时给出了每年的 LOLE 数和可靠 (%) 。
这里假定峰载求与时平均电量相同,等于风电总装容量的 40%;得到的失 载期望数是 261.77h/year。这说明满足载荷需求的供电可靠性是 9.11%。这个 数值之所低,是为只有在六、、八月某些时段的时发电量高于需。如 图 4所示。此分析又载荷需求线按比例缩小到能有 50%可靠满足载荷需求。 此时峰载需求下降 5%。失载期望指数关可靠性列于表 7。当峰载需求为装 机总量 20%,可靠是 53.29%。图 5给出了 5月、 7月、 7月、 11月的风电
It can be seen from Fig. 4
, how the hourly, monthly and seasonalvariation of wind
speed affects the wind power generation andthereby its reliability. The highest wind power system performanceis during the month of June, July and August. It is noted thatthroughout the year, a base power generation of 5.5% of the totalwind power capacity is available from the wind farms. Anotherfeature of wind energy to be noted from this study is that during offpeak hours in demand, the wind power generation is high andduring peak hours the wind power generation is low. The windpower generation is higher than or equal to the load demand forcertain period of the day, but the time of the day does not matchwith the demand and so the demand is not met effectively. Thissignifies that the wind energy must be considered only for meetingpart of the base load while integrating with the conventionalsystems. The analysis also shows the hours during which thepower generation is high and low, and accordingly the energyplanners must handle the reserves in power system.
从图 4可看出, 风速变化影响发电量进而响供电可靠性。 6-8月机组表现量好。 可以看出, 全年以总装机容量的 5.5%作为基数是可。 另一个明特征是非 峰期风电发电大而峰期发电量小。 电的发量在一天的某些时段高于或等于 需求量, 但是与需线不匹配, 所能有效的满足需求。 因此风电并网只 要求其足一定的基数。 本分析还显示出发电量的高低变化,
In case of stand-alone or hybrid systems, the analysis signifiesthe role of storage systems. The energy surplus can be stored inbatteries or other means, in order to be used during time ofinsufficient wind energy production or sold to the utility or forother purposes. Reserved energy in storage systems can beinstantaneously used as back-up, if the energy supply issignificantly reduced by the random changes in wind speed. Inaddition, the storage can also help to reduce the utility of othersources for peak hour’s requirements by storing energy in times oflow demand and using it in peak hours.
除了独立的或混合型的网络, 本析还指出了存贮电能的作用。 剩余的电量可以 用池或其他方起来, 风电不足时或作为其他用途。 下来电能同时 可以作为备用, 以防由风速的随机化引起风电减产。 另外, 下来的电能还 可以减少其他类发电量,即
The improvement in reliability by increasing the hub height ofwind energy conversion system by 10 m is investigated. Therelationship between the hub height and wind speed is given inEq. (5).
The results are presented in Table 7. Figs. 6 and 7 show thecomparison of wind power generation at increased hub height of10 mand load demand for the months of May, July, September andDecember, when the peak load demand is assumed as 40% and 20%of the total installed wind power capacity. The LOLE index decreaseas the hub height is increased, thus showing improvement in the reliability. Fig. 8 shows the reliability curves with base hub heightand 10 m increment in hub height.
本分析还考查了采提高轮毂(10m )的方法改善可靠性。轮毂高度与风的关 系如方程 5所示。 果如表 7所示, 图 6和图 7分别是峰载需求设定为总装机容量的 40%和 20%时, 轮毂提高 10m 后 5、 7、 9、 11份的发电量。 轮毂提高失载数下, 由此可靠性有所改善。图 8对比了基础轮毂高度
5. Conclusions
It is important that a power system should provide a reliableelectric power to the consumers. Determination of appropriategenerating sources is essential to meet the expected total demand.
电网供电的可靠非常重要, 电资的合理配置对满足需求说更是十
风电并网时有必要了解发电时间发电量可靠性以满电网需求。
A wind energy conversion system does not represent anequivalent amount of its existing installation capacity. With theindex of EWNS, an analysis is carried out for the study of reliabilityperformance of wind energy conversion systems in meeting theannual energy delivery factor. The reliability contributions withdaily and monthly generation data are obtained as 47.55% and42.2% respectively to meet the annual EDF. The study also revealsthat hub height is positively correlated to improved wind powerplant reliability.
风电机组的发电量不等同于其机容量。 有了风电不电期望指数, 我们以根 据风供电特析风电系统的可靠性。 按电特得到的日、 月发电可靠性分 是 47.55%和 42.2%。研究还揭示了提高轮毂高度对改善相
With the evaluation of LOLE, it is seen that the reliabilitycontribution of wind farms is 53.29% when the peak load demandis assumed as 20% of the installed wind power capacity. It is foundthat there is no matching of peak load period with the maximumwind power generation period. However, the total energycontribution by the wind farms to the power system is significant.Therefore in a power system, wind generated power, if available,must be utilized to the maximum to meet the base load demandsand thereby conserve conventional fuels and to reduce emissions.
对失载期望指数的评估显示出,当载需求设定为总装机容量的 20%时风电机组 的可靠为 53.29%。 同时现发电量的峰值与需求量的峰值不配。 然而, 风场 的发电量对电网是有积献的。 此, 对于电网来说, 应尽量大程度的利用 风电来满足需求,与此同时节
供电可靠性分析报告
供电可靠性
时 间: 2010
地
参加会议人员:
主持人:
按照局工作会议要求,我局于2010年12月20日组织召开了2010年度供电可靠性专工作会议,有可靠性专工、调度所、**供电所、**供电、**供电所、4个单位总结2010度两项指标成情况,工作中存在的问题及下步工作措施、打算,李局对此项工作作重要
一、供电可
全年中压用户供电可靠率城镇 RS-1:99.648%,RS-3:99.648%,共电494.023时户数,户均停电时间1.309
农村供电可靠性RS-1:99.6778%,RS-3:99.678%,共停电5307.9时户数,户平均停电时间(AIHC-1)3.7
影响全年城镇
1、临时施工申请停电25、停电532.023户数,户均停电6.149小时/户,影电可靠性0.052个百点。1—3月份城镇供电可靠性累计成99.848%,比去年相比下
农村:全年农村供电综合可靠99.778%,比去为99.633上升0.145个分点,流指标要求99.6% 高0.033个百分点。农村共停电5607.9时数,农村用户平均停电时间28.7小时/户。 影响全年农村用
1、计划检修26次,累计电653.13.时数、用户平均电9.2716
2、计划施工改建扩建13次,累计停电3049.10时户数、用
3、用户计划申请36次,计停电1278.69时户数、用户
4、临时施工9次,累计电571.45时
5、用户临时申请7次,计停电95.40时数,户均停0.0459小
调电1次,累计停电49.4时数,户停电0.02378小时/
全年农村供电可靠性累计完99.806%,比年相比上升0.192个百分点,高与一指标0.206个百分点,用户平均停电16.991小时/户,其中用
三、全年供
1、通过对公司每各
来控制压缩停电时间、停电线条数,对确实需要停用户,结合线实际,对线路及设缺陷集中处理。确保了供电可靠性指标的
2、公司各单位做好了春季检修工作,季检修前,单位根椐所分备进行认真的巡查,对影响设备运行缺陷编制检修计划,制定保证春检修三大措施,确保了春
3、公司根据年技该计划,加大了输变电设备改造力度,检修公对35kV城关变电站设备行了微机保造,改造前、有关部门领导根据现场实际,制定改措施划,通过调正运行方式、旁路开关带线荷形式,保了对用户不间断供电,检修现场作人员认真执行保证安全措施,严格施工工艺标
公司根据设备实际组织各单位进行了安性评价工作,好了输配电设冬季四防工作。通过司全体员工大量细致工作。极大的提高了输变电设备量,提高了对用户供电可
6、各供电所加强了对10kV配线路大修
7、调度管理自动化程度提高。为配电设备可靠运行提供了可保证,调度作为电网的运、监察部门,强负荷预和停电计划管理,结合季节特点及掌握网运行状况、负荷分配,根据停电计,灵活的调电网运行方式,使电网始终处健康、稳定、经济运行状态,提高电网的负载
的用电需求。
8、做好元旦、春节期间节值班工作,公司成立了生产一线人员为主的日抢险、事应急抢突击队,备足有关备品备件安全工器具,专人保管,定期进行检、试验,履行了节日值班制度,为障电网安全和最短时间内排除电网
9、生技科加强了供电可靠性指标分析,根据调度提供《输变电线路、设备、配电线路运情况统计表》,分析影响电可靠性的各种因素,为一步制定可靠性措施及目
三、可靠性管理
1、个别单位上报停电划工内容不具体,计划
四、目前可靠
1、 运行、施工等单位应加强对员业务知识培力度,提高对电可靠性认识,减因停送电时间过长,检修场因准备不足其他原因造不能及时对用户供电,
2、 个别单位由于上报停计划考不周,造下月临时停电多,造成公司不
3、部分35kV变电站由于有安装进开关,只刀闸进线,在运方式的调整上十分便,倒电源需停电进行。因倒电源而影
4、 报停电计划各单要每月5日前
按要求
五、下一步工作打算
1)、提高思想识,强化组领导,生技部将把可靠性管理作作为产技术管理的龙头来抓,并把可性管理与电网规划、城网建设改造、设备运行检修管理等各项工作有机结合起,力求实干、实用、实效,为争靠指标在业对标在全序中进入先进行列。做为计划停电综合门,加大停电计划的刚性管理。结季节特点,保障电网全接线全保护运行,加强对停计划的审核,尽量减少计划停电工作。确需停电输配电线路,关单位要通力作,按照所分管设备,把影响供电缺消灭在萌芽,避免同线路重复停电。形成计划管理为前提,以制度办法为依据,以指标管理为中心,以现
2)继续加技术改力度,公司通过城网、农改造,优化了网络结构,提高城网设备装水平与供电能力。2011年公司抓好以下工作,一完电网网架结构,完善县城线路实现“N-1”安全可靠供电准则。是优化网结构,城区及农村配电线路逐步实现 “手拉手”网供电, 三是高电网装备水平。在电网建设改造,积极用具可靠性高、小型化、标准化、无油化、集成化、低能耗、
3)强化管理,严格控制计划停电。在计划检管理工作中,始终将可靠性管
时,考虑满足靠性要求。是为控制好可靠性目标值,编排度计划时尽量考虑到可靠性要,统筹安排,以合理高利用每一次停电。二是加强设备检修预安排停管理,使有关部门协调配,其中不备条件的配工作未准备好的停电工作不予批,推行设备停电“一支笔”审制度,杜重复计划停电现象。三是配电网进施工和检修时,督促有关部门事先好作计划,提前勘工或检修现场,优化施工方案,作好施工、检准备,操人员、施或检修提前到位,完工后及时验收送电,尽量缩短停电时间。四是加强故
4)积极推行状态检,合理调整检修周期,提设备可用率和供电可靠性。每年根据集团司有关延长检修、预试周期的规定“状态检修实施细”的要求,和有位编制各专业年度检修、验、监督计划,确保电可靠指标在目标控制范围。为配合状态检修工作,加强了状态诊断,通过电测试和在线监测、油务监督、红外热像测试、密指导清扫等手段,使计划检修停电次数大大降低,提
5)、加强对输配变电设施的检查、巡视、缺,消除设备隐。加强对路多区及易冲刷区的巡视、护,充分利用先进检测设备期对输变电设备运行薄弱点、接部位的检测,继续搞好线
6)、和有关单位
输配电线路达到“三安化”求。督促各施工
7)、加强调度运行管理,高负荷预水平,根据作安排与天气化及时灵活的调
8)、加强节假日值班作、严值班纪律,保障各类级人员在因输配
9)、提高供电可靠性运行分析水平,行分析做到有、有据,数据实反应当前公司电运行状况,使公司领导及掌握了解电网运行情况,供电可靠性管理水平提高
5、李局长对电可靠性管工作重要指示(1)、提认识,强管理力度。通过2年供电靠性统计指标来看,我们指逐步提高,走向规范化轨道,指标在同业指标影响很大,下一步重点,原因,免因故障停、非计划停电对供电可靠性造成的影。年工程量较少,两项指标在业指标中在较好名次是可行的。为加强对指管理,各单位之间取长补短,建议有科头,信息中心、指标各单位配合,对指标做一个网页,网页对上政策,两指标分报告,会议交流材料、兄弟单位先进经验,供电可靠性、无功电压管理办法进
(2)结合生技科2010,各单位据自己实对2010年标进行分析,并实历次会议中的问题,看那些没有解
的措施办法来,2011年各单位指标解决一至两问题,找出重制约因素,把解决题时间、方案、措施报生部。对课题确实起到提指标要进行奖励,对完成
(3)2011年各单位要抓制度及理办法学,借鉴先进经
供电可靠性分析报告
***分公司2013年供电可靠性总结
一、 主
2013年供电可靠率下达指标为RS-3:99.65,完成99.65,用户平均停电间下达指标AIHC-3:14.576h,全年用户平均电次3.046,平均故障次数0.58,障停电平缺电量5809.743,用平均安排停电量2.367,预安排停民平均
二、故障停电
全年由于雷击造成上级高停电有1,因避雷器、设备线夹,断器等故障设备原因造成的电有5次,维护不到,导致的线路接地停电1次,故障电时最长是10kV麟城馈路 7#杆、8#杆公用变
1、针对“用户平均停电次”较多、指标完成情况,公司召集各供电所、度召开供电靠性分会,针对工程停电时间安排在的不合理情况进行重点分析,通过标计算来制压缩停电时间、停电线条数和停电用户数,确保了供电可
2、各供电所针对春季安全大查查出隐患及时行了消除,
3、调度中心加强了负荷预测,根停电计划,活调整电网运方式,使电网始处于健康、稳定、经济行状态,提高电网的负载能力,最大限度的满足
4、各供电所加强了对10kV配网线大修改造护力度,减少
5、生技部加强了供电可靠性指标分析,根据调度提供《输变电线路、设备、配电线路运行况统计表》,分析影响供可靠性的各种因素,为下步制定可靠性措施及指标
通过公司全体员工大量细致工作,极大的高了电网定运行水平,
三、安排停电原因
1、全年计划检
2、全年计划施请
3、临时施工1
四、下一步工作打算
1、严格执行划
2、严格执行供电可靠性评价规程,正确使用相程序软件。开展供电可靠性计和评价工作,做好供
3、计划在年初完善基础料、数据基础上,正确填写各种电记录,准确、
4、开展供电可靠性数据指的分工作,月对供电可
5、提高供电可靠运
数据真实反应当前公司电网备运行状,使公司导及时掌握
供电可靠性分析报告
上犹县电力公司
7月份用户
一、主
表1 中压户
7月份,公司综合供电可靠99.8539%,比年同期提高0.2708个百分点,其中城供电可靠率RS-1完成99.8392%,同比下降0.007百分点,村供电可靠率RS-1完
二、停
表2停电责
从停电责任原因
(1)预安排停电时户数占总电时户的87.71%,故障停电
(2)预安排停电时户数上年同期少621.55,减少39.31%;减
(3)故障停电数同比减少11次,少31.43%;故障停电时户数比减少85.31%,减少主要原因是雷害的停电减3次,减速少停电时户数117.517;因运行护责任导致的停电比上年同期减少8次,停电时户数595.967;因检修试验不导致
三、故障停电分析
7月份,由于雷击造成的停电有12条次,因避雷器、设备夹故障等设备原因造成停电有2条,运行维到位,导致的线路接地停电2次,
四、本月提高
1、针对同业对“用户平均停电次”较多、指标完成情况较差的况,公司召集各供电所、调通信中心召开可靠性分,针对工程停电时间安排存在的不理情况行重点分析,并对公司各单位7月份停计划进行汇、平衡,通过指标计算来控制压缩电时间、停电线路条数和停电用户数,确保了供
2、各供电所针对春季安全大查查出隐患及时行了消除,
3、调度通信中心加强了负荷预测,据停电计划,灵活调整电网行方式,使电网终处于健康、稳定、经济行状态,提高电网的负载能力,最大限度的满足
4、各供电所加强了对10kV配网线大修改造护力度,减少
5、生技部加强了供电可靠性指标分析,根据调度提供《输变电线路、设备、配电线路运行况统计表》,分析影响供可靠性的各种因素,为下步制定可靠性措施及指标
通过公司全体员工大量细致工作,极大的高了电网定运行水平,
五、下一步工作打算
1、做好高温间
2、督促调度通信中心编制好高温期电运行方式,度好小水电上力。 3、加大农改造升级步伐,通过城网、农网改造,优化网络结,提高公司电网设备装备
4、提高供电可靠性运行分析水平,运分析做到有理、有据,数据真实应当前公司电网设备行状况,使公司领导及时握和了解电网运行情况,供电可靠性管理水平的提高
2011年8月1日
供电可靠性分析报告
供电可
专题会议记录
生产技术部 2006年1月17日
时 间: 2006
地 点: 公司三楼会议室
参加会议人员: 张 诚 荣亮 于 泉 曲斌 杜宝林 朱尚海 郁 朱伟 玉 韩鹏 王作忠 孟学军 刘 伟 张保马 张相德 李 明 振生
主持人: 杜宝林
按照公司工作会议求,我公司于2006年1月17日组织召开了2005及四季度供电可靠性与无功压的专题工作会,会上有可靠及无功电压管理专工、调度所、鹤山供电、罡城电所、东庄供电所、检修公司六个单位总结2005年及4度两项指标完成情况,工作中在的题及下一步工作措施、打算,张经理对两项工作作重
一、供电可靠
4季度中压用户供电可靠率城镇 RS-1:99.948%,RS-3:99.948%,共电490.023时户数,户均停电时间1.149
农村供电可靠性RS-1:99.878%,RS-3:99.878%,共停电5607.9时户数,户平均停电时间为(AIHC-1)2.7小
影响4季度城
1、临时施工申请停电3次、停电490.023时户,户均停电1.149小时/户,影响供靠性0.052个百分点。1—12月份城镇供电可靠性累计完成99.948%,比去年同期相比下
农村:4季度农村供电综合可靠99.878%,比3季99.770上升0.108个百,比去年期为99.633上升0.245个分点,比一流指标要求99.6% 0.278个百分点。本季度农村共停5607.9时户数,农村用户平均停
具体到各月份,农村供电可靠率完情况为:10月份99.993,,11月份99.924,,12月99.777,。 影响4季度农村用户供电可
1、计划检修4次,累计停564.13.时户、用户平均停0.2716小/户,影响供电可靠率0.0123
2、计划施工改建扩建4次,计停电3049.10时户数、用户均停电1.468时/户,影响供电可靠率0.0665
3、用户计划申请10次,计停电1278.69时户数、用户均停电0.6156小时/户影响供电可靠率0.028
4、临时施工12次,累计电571.45时
5、用户临时申请2次,累停电95.40时
调电1次,累计停49.4时户数,户停电0.02378小时/户,影供电可靠率0.011个百分。 1—12农村供电可累计完成99.806%,比去年同期相上升0.192个百分点,高与一流指标0.206百分点,用户均停电16.991小时/户,其中户平均预安排停电16.726小时/户,用户平均
造成指标的因素主要是35Kv关王微机保护改。35kV于站10KV更换开柜,城网改造、公司秋检修以及市腾飞公司220kV电汶线施工造成
三、本季度供
1、通过对公司每各单位停电计划的汇总、平衡,通过指标计算来控制压缩停电间、停电线路条数,对于确实要停电用户,结线实际,对线设备缺陷集中处理。确保了供电可靠性指的可控、在控。 2、公司各单位做好了秋季检修工作,检修前,各根椐所分管设备进行认真的巡,对影设备运行缺陷编制了检修计划,制定保证秋季检修三大措
3、本季度公司据年度技该计划,大了对输变电设备改造力度,检公司对35kV关王变电站备进行了微机改造,改、有关部门领导根据现场实际,制定造措计划,通过调正运行方式、旁路开关带线负荷形式,证了对用户不间断供电,检修现场作人员认真执行保证安全措施,严格施工工艺标
4、检修公司利用城网资金更换窑变电站110kV少油开为SF6开关,磁窑110KV原开于运行长,设备老化且绝缘性能下降。造公司领导非常重视,组织各单位对改可能遇到难进行认真分析,制定了改造
5)检修公司搞好35KV于庄变10KV开柜改造工作,改前生技部会有关门对改造现场进行认真分,在保证对用户供电情况下,有关单制定了改造措施计划,减少对用户供电量。保证了公司
公司根据设备际组织各单进行了安全性评价工作,搞了输配设备冬季四防工作。通过公司体员工大量细致工作。极的提高了输变电设备质量,提高了对用户供电可及供电能力。 6、各供电加了对10kV配网大修改造维护力度,减少了因线路障对用户的供电, 7、调度管自动化程度高。为输配电设备可靠运行提供了靠保证,调度作为电网的运行、监察门,加负荷预测和停电管理,结合节特点及时掌握电网运行状况、负荷配,根据电计划,灵活的调整电网运行方式,使电网始终处于健康、稳定、经济运行状态,提高电
8、做好元旦、春节期间节值班工作,公司成立了以产一线人员为主的日抢险、事应急抢击队,备足有关备品备件及全工器具,专人保管,定期进行检查、试验,履行了节日值班制度,为障电网安全和最短时间内排除电网故
9、生技部加强了供电可靠性指标分析,根据调度提供《输变电线路、设备、配电线路运行况统计表》,分析影响供可靠性的各种因素,为下步制定可靠性措施及目标
三、上季度可性
1、个别单位上报停电划工内容不具体,计划工
四、目前可靠性
1、 运行、施工等单位应加强对人业务知识培力度,提高对可靠性认识,减少停送电时间过长,检修现因准备不足其他原因造不能及时对用户供电,影
2、 个别单位由于报停电计考虑不周,成下月临时停较多,造成公司能合理利用每一次停电机会,也影响对
3、 部分35kV变电由于没有装进线开关,只是刀闸进线,运行方式的调整上十不便,倒电源需停电进行。因倒电源而影
4、 报停电计划的各单要每月5日将上月停电划的执行情况要求格式报生技部。这工作检修公司、乡电部完成较好。其他单
五、下
1)、提高思想认识,强化组织领,生技部将把可靠性管理工作为生产技术管理的龙来抓,并把性管理与规划、城网建设与改造、设备运与检管理等各项工作有机结合起来,力求干、实用、效,为争可靠性指标在同业对在全省排序中进入先进行列。做为计划停电
刚性管理。结合节特点,为保障电网接线全保护运行,加强对停电计的审核,尽量减少计划停电作。对确实需要输配电线,各有关单位要通力合作,按照所分管设,把响供电缺陷消灭在萌芽中,避免同一线路停电。形成划管理为前提,以制度办法为据,指标管理为中心,以现代化管理为目的管理模式,
2)继续加技术改力度,公司通过城网、农改造,优化了网络结构,提高城网设备装水平与供电能力。2006年公司将好以下工作,一是电网网架结构,善县城线路实现“N-1”安全可靠供电准则。是优化网结构,城区及农村配电线路逐步实现 “手拉手”或供电, 三是电网装备水平。在电网建设改造中,积极采具有靠性高、小型化、标准化、无油化、集成化、低能耗、免
3)强化管理,严格控制计划停电。在计划检修管工作中,终将可靠性理与生产计划管理紧密结,安排每一次停计划时,考虑满足靠性要求。一是为控制好可靠目标,编排度计划时尽量考虑到可靠性需要,统筹安排,以合理高效利用每一次停电。是加强设备检修预安排停电的管理,使有关部门调配合,中具备条件的或配合工作未准备好的停电工作不予批,推行备停电“一笔”审批制度,杜绝重复划电现象。三是配电进行施工和检修时,督促有关部门事先制定好工计划,提前勘察施工或检现场,优化工方案,作好施工、检修准备,作人员、工或修提前到位,完工后时验收送电,尽量缩短停电时间。四是故障抢修、临时停电管理。提高处理突发事故力。 4)积极推行态检,合调整检修周期,提高设备可用率和供靠性。每年根据集公司关延长检修、预试周期的规定和“状检修实施细则”的要求,和有单位编各专业年检修、试验、监督划,确保供电可靠性标在目标控制范围。为配合状检修工作,加强了设备状态诊断,通过带电测试和在线监测、油务督、红外线热像仪测试、盐指清扫等手段,使计划
5)、加强对输配变电设施的检查、巡视、缺,消除设备隐。加强对路多及易冲刷区的巡视、护,充分利用先进检测设备定对输变电设备运行薄弱点、接部位的检测,继续搞好线路
6)、和有关单位配合,继续善城区电改造后的配设施,使输配线路达到“三安三”要求。督促各施工单位严格执行作业标
7)、加强调度运行管理,提负荷预测平,根据作安排与天气化及时灵活的调整统运行方式,使系统安全经济、稳定、
8)、加强节假日值班作、严值班纪律,保障各类级人员在因输配
9)、提高供电可性运行分析水平,运行析做到有理、有据,数据真实反应当前司电网运行状况,使公司领导及掌握了解电网运况,为供电可性管理水平提高奠定良的基础。 调度所:网运行靠性分析,四季度,电网运行稳定,冬季负荷上,停电时间明显少。由于气温下降明显,电网设出现了些缺陷。都及时得到处理,没有对电网运行带来影响,四
鹤山所:1、落计划停电管理到位,保线路及设备的安全运行,进一提高供电可靠性。2、为确全年供电可靠,第四季度对巡视范围进一步明确,分段划分,责到人,强了职工及农电工的责任感和工作主动性。3、按照公司一部署,集中开展了“数珠
5、张经理对供电可性管理工作重要指(1)、高认识,加强管理力度。通过05年供电可性统计指标来看,我们指标逐步提高,走向规化轨道,指标在同业指标体系影响很大,下步重点,分析原因,避因故障停电、非计划停电对供电可靠性造成的影。06年工程量较少,两项指标在同业指标排在好名次是行。为加强对指管,各单位之间取长补短,建议有生技部牵头,信息中心、同业指标各单位配合,对指标做个网页,网页上级政,两项指分报告,会议交流料、兄弟单位先进经验,供电可、无功电压管理办法进行登载,达到相学习借鉴目的,促指标高。 (2)结合生技部05及第四季度指分,各单位根据自己实际对05指标进行分析,并落实次会议中的问题,看那些没有解,拿出解决的措施办法来,06年各单位标要解决一至两个问题,找出重点及制约因素,把解问题时间、方案、措施生
(3)要抓好两项指标计资金落实,技术部门、各承担项目位要提前准备,
(4)06年各单位要抓好制度及管理办学习,借鉴先经验,集广益,确保两项指标逐步提。 会上杜主任要求与会人会后认真落实张经理作的重
下面是赠送的经典语录和笑语,不需要的朋友可以
, 【感人的话】 要学
支持力量.逆境回
, 【感人的话】 每个的好跟坏运都是分配好
以只要是一点
, 【祝福的话】 这有一
话也早已没了香气,却是谢你把它借给了我。今
友。还是要跟以前一样,我听
会把祝福写在这本笔记,在多枯黄的花的旁边,
好~祝福你过得比
, 【表白的话】 爱是一念头,爱你是一种
的宿命。爱你是一段旅,爱是一场幸福的长跑,
径的花香。爱你,睡
, 【有哲理的话】 上有种人:一是良心被
人,三是良心
, 【激励人的话】 如果你看到面的阴影,别,那是因为你背后有阳光。 , 【感人的话】 一身白衣为你洗尽铅华,白衣白发白胜雪,捧一
香,我踏着平平仄仄的长短,款款步入风情万种
潺潺,柳丝随风絮,我桃花写着红笺小字,一抹
了你的心。佛说年
, 【有哲理的话】 母是一甘露,亲吻干涸的
坚毅,期待着闪着碎光泥土肥沃;母爱不是人生
的河,这条河就
, 【表白的话】 我深地恳你;不要把我逐出
缺少你的爱。只赢
, 【表白的话】 爱你,却要欲无求,好难~爱
却让自己心碎,好惨~但竟然心甘情,好傻~但我能肯定的是:我是真的很爱你~ , 【表白的话】
水滴滴飘洋流到你的心,爱,今生无悔,牵了你
护你,一生一世~
, 【表白的话】 你的情,暖了我冰冻的心;
的关怀,激起了我感激情。年伊始,愿我们透过
好的未来。
, 【表白的话】 也许的笑不够灿烂,但足够
双手不够温柔,但还能你拂俗世尘埃~如果命运
你~情
, 【甜言蜜语的话】 们结吧,好不好,那样我
就可以每天清晨起来看你的脸,然后一起吃一顿
结婚吧,好不好,那样们就以拿着民政局发的红
房间里挂满结婚照,看
, 【表白的话】 我需你,像冬天里的棉袄,
饿中的面包—–我不能没有你~
, 【有哲理的话】 用理检真理永远是真理,
们不能拥有真
, 【离别的话】 愿你一滴亮的水,投射到浩
百花满园;作一丝闪光纤维,绣织出鲜红的战旗;
守自己
, 【离别的话】 我们经在
节。同学啊,同学,分
, 【离别的话】 红叶飞的林里,我们曾拥有
们带进一个
, 【离别的话】 别离,是有难舍,但不怅然;
有相逢的
, 【有哲理的话】 人着,一要紧的事情就是
应该为之努力的目的和标,作就会出现乐趣,这
生活的成功者,生命就会丰富多彩。
, 【有哲理的话】 在相肯
格。有些事情的确没有知道,除你之外,没有人知
好能问心无愧。因为问心无愧可自信,而自会让你生活更从容。 , 【有哲理的话】 没任何的动物是比蚂蚁更勤奋,然而它却是最
其埋怨世界,不如改变己。好自己的心,做好自
美,曲折亦风景。别把去看过重,放弃是另一种
到了,心悟到了,信
, 【有哲理的话】 有人成不大,不在于智力
心理上的弱点和谬见,有充发挥自己既有的潜力
向生活挑战,
, 【有哲理的话】 面别人反对意见,如果你
很难从内心真正接,在达方式上委婉
, 【有哲理的话】 当们放这个世界的时候,
自己了不起,可一旦我们心歇来,用赤子之心来
我们什么时候都能看清自己不如人地方,那就对生命有真心的时候。 , 【有哲理的话】 胸
太松则无音,只有松紧适,才弹出美妙之音。保
怀一颗平常心,看淡得,超
缘自适。平常心,一
, 【有哲理的话】 绝多数都喜欢嘲笑别人,
尴尬境遇时,你如果能通过自己出来减少他的堪,他一定你非常感激。 , 【有哲理的话】 于胸怀大志的有志之士和勤奋努力的人来说,
么作用的。他们会说:会再什么困难能拦得住我
会战胜许多
, 【有哲理的话】 成地推自己是迈向成功的
动脑筋,设计一小
搞笑语录
, 一次,同事几个去国,超市买东西,用济南
的济南话说:―你们是济的,~‖暴汗,原来这老
人后代,同事问他:―那英文怎样啊,‖老外一拍大
哈哈,有
, 公司加班到半夜,所人都皮打架,一姑娘哀
字。‖众问其故,姑娘说:―就一个人四肢平摊躺在
事嘟囔:―困。‖
, 一先生感冒去医院吊针,护士小姐很麻利的给
多小时过去了,盐水瓶水打了,护士过来马上又
小姐说:―小姐,处方单不是只了一瓶,‖护士小
生,您运气真,
, 一退休老头,闲来无就教鹉说话,每天早上
后,鹦鹉仍不开口。一日,老头情不佳,未教。只
连好也不
, 白雪公主逃出王宫,来到
雪公主就躺下睡着了。傍七个人回来了,白雪公
矮人吧。‖ 七个人面面相觑,然说:―你走地方了,我金刚葫芦娃。‖ , 爷孙三人去钓鱼,爷爷拿着鱼杆发呆,孙子看到后对爸爸说:―
发呆,跟傻B 似的。‖爸爸打了子一耳光生的喊道:―才傻B 呢~‖ , 作业做了很久,手打开收音机,一个温柔的声音传出:―如果
的绒毛细嫩柔软,那么说很健……‖听到这里,
再笑一笑,样子健康可爱。这时,又听播音员说道:―好,听众朋友,这次我们的《养
猪知识讲座》就到这里。‖
, 话说上技校时我们为机八班。某日,学校组
二百女生加时喊:―机二,加油……机二,油……‖我
加油……机八,
, 出差,刚出车站就来
成暧昧的语气:―有小姑哟,很
―老姑娘,老姑娘也有,宜一。‖再汗,说:―我
说:―那个,
, 一哥们儿隔壁新搬个老,一天晚上老外敲门
能换台。‖这哥们儿头看眼表,很镇定
, 有个懒人,懒得出奇。妻子切面条,叫他到邻
就在我背上切吧~‖妻子他背切完面条,问他:―
吱声。‖
, 一只青蛙给牧师打话,
来了解你。‖青蛙高兴的蹦起来:―哦,的吗,是在
是在她明年
, 几个人在高尔夫更室,手机响很久,一男人
俱乐部吗,‖男:―在。‖:―看到一辆马,才不到
有那个楼盘又放盘了, 6一平。‖男:―。‖女:―
男人们敬佩得目瞪口。
, 深夜,老公未归。女心急妈打电话:―妈~他
妈妈轻声安慰:―傻孩子,乖,净往坏处,兴许是出祸了~‖ , 一男子在闹市骑摩托昏了一个陌生的老汉~男子惊吓得不知所
来越多~突然,该男抱住汉,泪俱下的喊道:―
生~‖说后,就跑掉了。汉挣着愤怒的喊道:―给
儿子当的真孝顺~‖
下面是赠送的经典语录和笑语,不需要的朋友可以
, 【感人的话】 要学
支持力量.逆境回
, 【感人的话】 每个的好跟坏运都是分配好
以只要是一点
, 【祝福的话】 这有一
话也早已没了香气,却是谢你把它借给了我。今
友。还是要跟以前一样,我听
会把祝福写在这本笔记,在多枯黄的花的旁边,
好~祝福你过得比
, 【表白的话】 爱是一念头,爱你是一种
的宿命。爱你是一段旅,爱是一场幸福的长跑,
径的花香。爱你,睡
, 【有哲理的话】 上有种人:一是良心被
人,三是良心
, 【激励人的话】 如果你看到面的阴影,别,那是因为你背后有阳光。 , 【感人的话】 一身白衣为你洗尽铅华,白衣白发白胜雪,捧一
香,我踏着平平仄仄的长短,款款步入风情万种
潺潺,柳丝随风絮,我桃花写着红笺小字,一抹
了你的心。佛说年
, 【有哲理的话】 母是一甘露,亲吻干涸的
坚毅,期待着闪着碎光泥土肥沃;母爱不是人生
的河,这条河就
, 【表白的话】 我深地恳你;不要把我逐出
缺少你的爱。只赢
, 【表白的话】 爱你,却要欲无求,好难~爱
却让自己心碎,好惨~但竟然心甘情,好傻~但我能肯定的是:我是真的很爱你~ , 【表白的话】
水滴滴飘洋流到你的心,爱,今生无悔,牵了你
护你,一生一世~
, 【表白的话】 你的情,暖了我冰冻的心;
的关怀,激起了我感激情。年伊始,愿我们透过
好的未来。
, 【表白的话】 也许的笑不够灿烂,但足够
双手不够温柔,但还能你拂俗世尘埃~如果命运
你~情
, 【甜言蜜语的话】 们结吧,好不好,那样我
就可以每天清晨起来看你的脸,然后一起吃一顿
结婚吧,好不好,那样们就以拿着民政局发的红
房间里挂满结婚照,看
, 【表白的话】 我需你,像冬天里的棉袄,
饿中的面包—–我不能没有你~
, 【有哲理的话】 用理检真理永远是真理,
们不能拥有真
, 【离别的话】 愿你一滴亮的水,投射到浩
百花满园;作一丝闪光纤维,绣织出鲜红的战旗;
守自己
, 【离别的话】 我们经在
节。同学啊,同学,分别不要忘了我们
, 【离别的话】 红叶飞的林里,我们曾拥有
们带进一个
, 【离别的话】 别离,是有难舍,但不怅然;
有相逢的
, 【有哲理的话】 人着,一要紧的事情就是
应该为之努力的目的和标,作就会出现乐趣,这
生活的成功者,生命就会丰富多彩。
, 【有哲理的话】 在相肯
格。有些事情的确没有知道,除你之外,没有人知
好能问心无愧。因为心愧可生自信,而
, 【有哲理的话】 没任何动物是比蚂蚁更勤
其埋怨世界,不如改变己。好自己的心,做好自
美,曲折亦风景。别把去看过重,放弃是另一种
到了,心悟到了,信
, 【有哲理的话】 有人成不大,不在于智力
心理上的弱点和谬见,有充发挥自己既有的潜力
向生活挑战,
, 【有哲理的话】 面别人反对意见,如果你
很难从内心真正接,在达方式上委婉
, 【有哲理的话】 当们放这个世界的时候,
自己了不起,可一旦我们心歇来,用赤子之心来
我们什么时候都能看清自己不如人地方,那就对生命有真心的时候。 , 【有哲理的话】 胸
太松则无音,只有松紧适,才弹出美妙之音。保
怀一颗平常心,看淡得,超
缘自适。平常心,一
, 【有哲理的话】 绝多数都喜欢嘲笑别人,
尴尬境遇时,你如果能通过自己出来减少他的堪,他一定你非常感激。 , 【有哲理的话】 于胸怀大志的有志之士和勤奋努力的人来说,
么作用的。他们会说:会再什么困难能拦得住我
会战胜许多
, 【有哲理的话】 成地推自己是迈向成功的
动脑筋,设计一些花
搞笑语录
, 一次,同事几个去国,超市买东西,用济南
的济南话说:―你们是济的,~‖暴汗,原来这老
人后代,同事问他:―那英文怎样啊,‖老外一拍大
哈哈,
, 公司加班到半夜,所人都皮打架,一姑娘哀
字。‖众问其故,姑娘说:―就一个人四肢平摊躺在
事嘟囔:―困。‖
, 一先生感冒去医院吊针,护士小姐很麻利的给
多小时过去了,盐水瓶水打了,护士过来马上又
小姐说:―小姐,处方单不是只了一瓶,‖护士小
生,您运气真,
, 一退休老头,闲来无就教鹉说话,每天早上
后,鹦鹉仍不开口。一日,老头情不佳,未教。只
连好也不
, 白雪公主逃出王宫,来到
雪公主就躺下睡着了。傍七个人回来了,白雪公
矮人吧。‖ 七个人面面相觑,然说:―你走地方了,我金刚葫芦娃。‖ , 爷孙三人去钓鱼,爷爷拿着鱼杆发呆,孙子看到后对爸爸说:―
发呆,跟傻B 似的。‖爸爸打了子一耳光生的喊道:―才傻B 呢~‖ , 作业做了很久,手打开收音机,一个温柔的声音传出:―如果
的绒毛细嫩柔软,那么说很健……‖听到这里,
再笑一笑,样子健康可爱。这时,又听播音员说道:―好,听众朋友,这次我们的《养
猪知识讲座》就到这里。‖
, 话说上技校时我们为机八班。某日,学校组
二百女生加时喊:―机二,加油……机二,油……‖我
加油……机八,
, 出差,刚出车站就来
成暧昧的语气:―有小姑哟,很
―老姑娘,老姑娘也有,宜一。‖再汗,说:―我
说:―那个,
, 一哥们儿隔壁新搬个老,一天晚上老外敲门
能换台。‖这哥们儿低头看了眼,很镇定的:―过了七
就在我背上切吧~‖妻子他背切完面条,问他:―
吱声。‖
, 一只青蛙给牧师打话,
来了解你。‖青蛙高兴的蹦起来:―哦,的吗,是在
是在她明年
, 几个人在高尔夫更室,手机响很久,一男人
俱乐部吗,‖男:―在。‖:―看到一辆马,才不到
有那个楼盘又放盘了, 6一平。‖男:―。‖女:―
男人们敬佩得目瞪口。
, 深夜,老公未归。女心急妈打电话:―妈~他
妈妈轻声安慰:―傻孩子,乖,净往坏处,兴许是出祸了~‖ , 一男子在闹市骑摩托昏了一个陌生的老汉~男子惊吓得不知所
来越多~突然,该男抱住汉,泪俱下的喊道:―
生~‖说后,就跑掉了。汉挣着愤怒的喊道:―给
儿子当的真孝顺~‖