一、土建工程的问题
1、底板
(1)在梁板体系中,当底板上层钢筋与梁上层主筋标高相同时,板的上层钢筋放
在梁的主筋上面
(2)人防门的门框插筋及门槛钢筋没按要求设置
(3)人防门的门槛高度、门框墙宽度不够,无法安装门扇,影响使用功能。 (4)人防门的门框墙及门槛的截面尺寸太小,门槛的钢筋成型和绑扎不符合要求 (5)悬板活门、胶管活门门框的钢筋成型和绑扎不符合要求 (6)人防门槛的施工不符合要求或活置式人防门门槛下没有设置钢筋 (7)大于3m跨度车道出入口的临战封堵未设置下槛梁
(8)排水沟相邻单元之间、非人防区域与人防区域之间不应相通 (9)拉结钢筋设置不符合要求
2、内外墙
(1)人防门框及门框钢筋成型和绑扎未到位
(2)人防门门洞四周转角处没有绑扎斜向钢筋
(3)直接受侧向冲击波的人防门、悬板活门、胶管活门没有嵌入墙体,无法承受
对侧向冲击波破坏作用的防护
(4)外墙采用止水钢板施工缝时没按要求施工
(5)门框箍筋与竖向或水平钢筋绑扎错误,或箍筋截面不够 (6)临空墙的钢筋没有按图成型和绑扎,内外侧钢筋颠倒
(7)临空墙在底板、顶板中的锚固长度不够
(8)外墙、临空墙、密闭隔墙、防护密闭隔墙使用穿墙塑料管或其他套管 (9)临战封堵预埋角钢框没按要求设置
(10)人防门门框角钢预埋的位置和方向错误,人防门开启方向错误 (11)人防门门框角钢的锚固筋没有锚固到门框墙中并固定牢 (12) 相邻防护单元防护等级不同时防护密闭门位置颠倒
3、顶板
maintenance business reception; (3) car maintenance enterprise or car sales and after-sales service integration enterprise business or production management; (4) Car maintenance enterprise or car sales and after-sales service integration enterprise technology management; (5) car maintenance enterprise or car sales and after-sales service integration Enterprise car accessories management; (6) car performance detection Enterprise car performance detection and evaluation, and detection equipment maintenance; (7) car transport enterprise car using management; (8) insurance company vehicles accident site exploration; (9) car manufacturing enterprise car performance detection and debugging; 2. get certificate this teaching plans according to Ministry of education high vocational designed professional directory prepared ( Professional code:), and integrated into the Ministry of labor and social security all four car mechanic in the national occupational standards occupational functions and skill requirements, students completing this course under the teaching plan, core double certificate course score up to 60 points or more, ... 2. ...(2)Master of mechanical drawing, engineering mechanics, mechanics, automotive materials and processing technology, basic knowledge such as Electrotechnics and
(1)设于防护密闭门前通道的超压测压管未直接预埋于顶板钢筋中 (2)临战封堵预埋件的规格太小,没有和墙板中的预埋件焊接 (3)没有设置人防门门扇吊钩或吊钩的规格和留置位置错误 4、浇筑混凝土时,应按下列规定制作试块:
(1)标养抗压试块
?口部、防护密闭段应各制作一组试块;
3?每浇筑100m 混凝土应制作一组试块;
?变更水泥品种或混凝土配合比时,应分别制作试块; ?防水混凝土应制作抗渗试块。
(2) 同条件试块
每次浇筑混凝土,按不同配合比各制作一组同条件试块。 (3) 抗渗试块
3每500m混凝土制作一组标养试块和同条件试块。
5、土建竣工验收
(1)部分口部区域,未粉刷到位或表面毛糙
(2)部分粉刷或油漆质量差
(3)应一次施工、安装完成设施未一次施工、安装完成 人防工程的下列各项应在施工、安装时一次完成:
?采用钢筋混凝土或混凝土浇筑的部位;
?供战时使用的出入口、连通口及其他孔口的防护设施; ?防爆波清扫口、给水引入管和排水出户管。
(4)门框墙的制作质量差
(5)防护门、防护密闭门、密闭门、防爆波活门的安装质量差 二、通风工程的问题
1、墙板预埋施工时容易发生的质量问题
(1)随意预留混凝土洞穿越临空墙、密闭隔墙、防护结构外墙及楼板 (2)战时进、排风管,在临空墙、密闭隔墙预埋的密闭短管管径、厚度不符合要
求,预埋时短管变形
(3)排风口部自动排气阀和相关的通风短管或密闭阀未在水平方向和垂直方向错
mechanics, mechanics, automotive materials and processing technology, basic knowledge such as Electrotechnics andMaster of mechanical drawing, engineering )2(eaching plan, core double certificate course score up to 60 points or more, ... 2. ...he national occupational standards occupational functions and skill requirements, students completing this course under the tin t directory prepared ( Professional code:), and integrated into the Ministry of labor and social security all four car mechanic nd debugging; 2. get certificate this teaching plans according to Ministry of education high vocational designed professionalion amanagement; (8) insurance company vehicles accident site exploration; (9) car manufacturing enterprise car performance detect erprise car performance detection and evaluation, and detection equipment maintenance; (7) car transport enterprise car usingsales service integration Enterprise car accessories management; (6) car performance detection Ent-sales service integration enterprise technology management; (5) car maintenance enterprise or car sales and after-intenance enterprise or car sales and aftersales service integration enterprise business or production management; (4) Car ma-maintenance business reception; (3) car maintenance enterprise or car sales and after1
开布置
(4) 管道、预埋穿墙管直径与所连接的管道或手动密闭阀门等设备的接管管径不匹配
2、通风安装工程施工中容易发生的质量问题
(1)清洁式通风、滤毒式通风系统未设置两道密闭阀门,或两道密闭阀门均设置在染毒区
(2) 设有滤毒通风的人员掩蔽部,在其送风系统上未设测压管、取样管或设置位置错误,室内端设置在滤毒室内或两端未出顶板
(3) 战时通风系统密闭不符合规范要求
(4)过滤吸收器、密闭阀、自动排气阀、防爆超压排气阀等防化设备或防护设备未使用人防专业厂的产品
(5)自动排气阀门、(防爆)超压排气活门未按照规范要求安装
(6)过滤吸收器、油网除尘器安装方向或位置错误
(7)滤毒通风和清洁通风共用一台风机时,增压管或者阀门安装不正确
(8) 通风密闭阀门安装未按照规范要求施工。
(9)战时进风机旋转方向错误或安装未按照规范要求
(l0) 管道焊接质量与油漆质量不符合规范要求
(11)通风系统防火、阻燃不符规范要求
三、给排水工程的问题
1(底板预埋
(l)在防毒通道、密闭通道、洗消间、简易洗消间、扩散室、活门室、滤毒室等染毒区未设置洗消排水口及洗消污水集水井
(2)洗消排水口高出地坪表面,无法使洗消污水排尽或影响密闭门的开启
(3)未使用防爆地漏或防爆地漏未直接预埋在底板混凝土内
(4)洗消排水管采用排水铸铁管或排水PVC管
(5)排水管管口中心在集水井中位置偏低或偏高,离井壁距离偏小
(6)预埋在底板中穿越临空墙和密闭隔墙的给排水管道没有采取防护密闭措施
2(给排水安装工程内外墙、顶板预埋
(1)给排水、消防、喷淋等管道穿越人防临空墙、密闭隔墙、外墙时预埋套管不
ds occe:), and integrated into the Ministry of labor and social security all four car mechanic in the national occupational standarteaching plans according to Ministry of education high vocational designed professional directory prepared ( Professional codthis icles accident site exploration; (9) car manufacturing enterprise car performance detection and debugging; 2. get certificateevaluation, and detection equipment maintenance; (7) car transport enterprise car using management; (8) insurance company vehection and sales service integration Enterprise car accessories management; (6) car performance detection Enterprise car performance det-sales service integration enterprise technology management; (5) car maintenance enterprise or car sales and after-aftersales service integration enterprise business or production management; (4) Car maintenance enterprise or car sales and -maintenance business reception; (3) car maintenance enterprise or car sales and afterials and processing technology, basic knowledge such as Electrotechnics andMaster of mechanical drawing, engineering mechanics, mechanics, automotive mater)2(course score up to 60 points or more, ... 2. ...upational functions and skill requirements, students completing this course under the teaching plan, core double certificate 2
符合规范要求
(2)给排水、消防、喷淋等管道穿越人防临空墙、密闭墙、外墙时管材不符规范要求
(3)随意预留或打孔洞穿越临空墙、密闭墙、楼板
(4)在人防出入口受污染的房间和通道未设置供底、墙、顶面冲洗用的冲洗水龙头
(5)预埋在混凝土中的管道与混凝土接触部分有油漆
(6)消火栓箱嵌埋在人防外墙、临空墙、密闭墙内
(7)管道穿越人防密闭墙、临空墙、楼板、外墙套管未求做防护密闭处理
(8)在污水池不设透气管或透气管接至排风管、进风竖井
(9)未设置防爆波阀门或设置错误
3(给排水安装竣工
(1)给排水、消火栓、喷淋等管道中“防爆波阀门”的选型错误
(2)防爆波地漏及防爆清扫口安装错误
(3)给水、排水管道穿过临空墙、防护单元隔墙时,未设置抗力片
四(电气工程的问题
1(电气安装工程底板预埋
(l)无桩基人防地下室底板钢筋未形成接地网
(2)防护密闭门门框未接地,或接地扁钢施工不符规范要求
(3)各种配电接地极未直接从系统接地网引出
(4)电气管线直接从人防区引入非人防区,或防护单元之间未做防护密闭措施
(5)有防护密闭要求或暗敷在混凝土墙内的电气管线的材质采用薄壁管
2(电气安装工程内外墙、顶板预埋
(1)在人防临空墙、密闭墙、楼板、临战封堵处穿越电缆桥架、母线槽施工不符合规范要求
(2)当人民防空工程作为人员掩蔽部时,未设置呼唤按钮,或施工不符合规范要求
(3)防护密闭门、密闭门门框墙上未预埋防护密闭备用管或施工不符合规范要求
(4)从人防区引至非人防区的照明线路未在人防区内侧加装熔断器
mechanics, mechanics, automotive materials and processing technology, basic knowledge such as Electrotechnics andMaster of mechanical drawing, engineering )2(eaching plan, core double certificate course score up to 60 points or more, ... 2. ...he national occupational standards occupational functions and skill requirements, students completing this course under the tin t directory prepared ( Professional code:), and integrated into the Ministry of labor and social security all four car mechanic nd debugging; 2. get certificate this teaching plans according to Ministry of education high vocational designed professionalion amanagement; (8) insurance company vehicles accident site exploration; (9) car manufacturing enterprise car performance detect erprise car performance detection and evaluation, and detection equipment maintenance; (7) car transport enterprise car usingsales service integration Enterprise car accessories management; (6) car performance detection Ent-sales service integration enterprise technology management; (5) car maintenance enterprise or car sales and after-intenance enterprise or car sales and aftersales service integration enterprise business or production management; (4) Car ma-maintenance business reception; (3) car maintenance enterprise or car sales and after3
(5)防空地下室各种电气箱布置不符要求
(6)人防地下室各出入口未设置应急照明灯
(7)当人防地下室作为人员掩蔽部时,未设置通风方式信号装置,或设置不合理
(8)密闭穿墙管制作及安装错误
3.电气安装工程竣工
(1)密闭盒没有填充密封材料,密封的钢板厚度不够
(2)电缆穿过临空墙和密闭墙中的套管后,电缆和套管的缝隙没有填充密封材料。
(3)穿越围护结构、防护密闭隔墙、密闭隔墙的电气管线未进行防护密闭或密闭处理穿越围护结构、防护密闭隔墙、密闭隔墙的电气管线及预留备用穿线钢管,应进行防护密闭或密闭处理,管材应选用厚度不小于25mm热镀锌钢管(这里说的电气管线是指动力、照明、电话、消防、报警等。人防工程有“三防”要求,电气管线进出人防工程的处理一定要与工程防护、密闭功能相一致,这些部位的防护、密闭相当重要、漏气、漏毒将会使工程失效)。弱电线路进出人防工程可选用塑料导线,但必须采用暗管加密闭盒的方式。对于平时作为营业、地下车库等用途的工程,一般规模较大,弱电线路也较多,此类管线的防护、密闭也很重要,放采取密闭盒的方式进行防护密闭处理。
五.人防工程质量验收划分
人防工程施工质量的检查评定和验收应划分为单位工程、分部工程和分项工程。
1.分项工程的划分
(1)分项工程名称
序分部工程名分项工程名称
号 称
土石方,爆破掘进,盾构,沉井,地下连续墙,打(压)桩,灌注1 结构工程
桩,模板,钢筋,混凝土,喷射混凝土,构件安装,钢结构,砌砖,
砌石等
防水混凝土,水泥砂浆防水层,涂料防水层,卷材防水层,金属防2 防水工程
水层,油膏嵌缝防水,止水带防水等
防护门、防护密闭门、密闭门门框墙制作,防护门、防护密闭门、3 孔口防护工
密闭门安装,防爆波活门、防爆超压排气活门安装,进出工程管线程
的防护密闭等
一般抹灰,装饰抹灰,油漆,刷浆(喷浆),裱糊,饰面,罩面板及4 建筑装修工
钢、铝合金骨架安装,整体地面,板块地面,木质板地面,门窗安程
装等
ials and processing technology, basic knowledge such as Electrotechnics andMaster of mechanical drawing, engineering mechanics, mechanics, automotive mater)2(course score up to 60 points or more, ... 2. ...upational functions and skill requirements, students completing this course under the teaching plan, core double certificate ds occe:), and integrated into the Ministry of labor and social security all four car mechanic in the national occupational standarteaching plans according to Ministry of education high vocational designed professional directory prepared ( Professional codthis icles accident site exploration; (9) car manufacturing enterprise car performance detection and debugging; 2. get certificateevaluation, and detection equipment maintenance; (7) car transport enterprise car using management; (8) insurance company vehection and sales service integration Enterprise car accessories management; (6) car performance detection Enterprise car performance det-sales service integration enterprise technology management; (5) car maintenance enterprise or car sales and after-aftersales service integration enterprise business or production management; (4) Car maintenance enterprise or car sales and -maintenance business reception; (3) car maintenance enterprise or car sales and after4
给水管道安装,给水管道附件及卫生器具、给水配件安装,给水附5 给排水工程
属设备安装,排水管道安装,卫生器具安装,洗消器具安装,立式
污水泵安装等
采暖管道安装,散热器及太阳能热水器安装,采暖附属设备安装,6 采暖、通风与
金属风管制作,无机玻璃钢风管制作,通风部件制作,风管及部件空调工程
安装,非金属风管(风道)制作与安装,过滤器、除尘器、过滤吸
收器安装,密闭阀门安装,消声设备制作与安装,通风机和除湿机、
柜式空调机安装,防腐与油漆等
电缆线路,配管及管内穿线,护套线配线,槽板(桥架)配线,变7 建筑电气
压器安装,成套配电柜(盘)及动力开关柜安装,低压电器安装,安装工程
电气照明器具及配电箱(盘)安装,接地装置安装,柴油发电机组
安装等
防火门和防火卷帘安装,灭火器具安装,防烟排烟部件制作与安装,8 防火设备
火灾自动报警装置安装,火灾事故广播、消防通信设备安装等 安装工程
(2)分项工程项数
?分项工程项数应按防护单元、系统、层(段)划分。
?钢筋、混凝土分项还应按底板、侧墙、柱、顶板划分。
?还应按设备类型、材料、施工方法等划分。如包含防护门、防护密闭门、密闭门安装,应为3项;包含混凝土、水泥砂浆、水磨石、碎拼大理石的整体地面工程,应为4项;包含给水铸铁管、镀锌碳素钢管、铝塑复合管道安装的给水管道安装工程,应为3项。另外,模板分项不参加分部工程的质量评定。因为混凝土的质量已经反映了模板的质量,且模板工程不是工程的构成部分,只是形成混凝土工程的过程,所以不参加分部工程的评定。模板工程对混凝土工程的质量有直接影响,其分项工程的质量必须评定。
2.分部工程的划分
分部工程名称应符合上表的规定。
分部工程划分为结构、防水、孔口防护、建筑装修、给水排水、采暖通风与空调、建筑电气安装、防火设备安装8个分部。本标准不包括通信、防电磁脉冲、抗核震动等分项、分部工程。
3(单位工程的划分
一个独立的、单一的人防工程为一个单位工程,如一条坑道、一条地道、一个掘开式工事、一个防空地下室为一个单位工程。
对于连片成网的坑道、地道,可根据据实际情况,具体划定单位工程。
mechanics, mechanics, automotive materials and processing technology, basic knowledge such as Electrotechnics andMaster of mechanical drawing, engineering )2(eaching plan, core double certificate course score up to 60 points or more, ... 2. ...he national occupational standards occupational functions and skill requirements, students completing this course under the tin t directory prepared ( Professional code:), and integrated into the Ministry of labor and social security all four car mechanic nd debugging; 2. get certificate this teaching plans according to Ministry of education high vocational designed professionalion amanagement; (8) insurance company vehicles accident site exploration; (9) car manufacturing enterprise car performance detect erprise car performance detection and evaluation, and detection equipment maintenance; (7) car transport enterprise car usingsales service integration Enterprise car accessories management; (6) car performance detection Ent-sales service integration enterprise technology management; (5) car maintenance enterprise or car sales and after-intenance enterprise or car sales and aftersales service integration enterprise business or production management; (4) Car ma-maintenance business reception; (3) car maintenance enterprise or car sales and after5
六.人防工程质量验收等级
1.分项、分部、单位工程质量,应分为“合格”与“优良”两个等级(防火分部及其各分项不设“优良”等级)。
2.分项工程的质量等级应符合以下规定:
(1)合格
?保证项目必段符合相应质量检验评定标准的规定;
?基本项目每项抽检的处(件)应符合相应质量检验评定标准的合格规定;
?允许偏差项目抽检的点数中,有75%及以上的实测值应在相应质量检验评定标准的允许偏差范围内。
(2)优良
?保证项目必须符合相应质量检验评定标准的规定;
?基本项目每项抽检的处(件)应符合相应质量检验评定标准的合格规定;其中有50%及以上的处(件)符合优良规定,该项即为优良;优良项数应占检验项数的50%及以上;
?允许偏差项目抽检的点数中,有90%及以上的实测值应在相应质量检验评定标准的允许偏差范围内。
3.分部工程的质量等级应符合以下规定:
(1)合格
所含分项工程的质量全部合格。
(2)优良
所含分项工程的质量全部合格,其中有50%及以上为优良。
4.单位工程的质量等级应符合以下规定:
(1)合格
?所含分项工程的质量全部合格;
?质量控制资料应完整;
?观感质量的评定得分率达到70%及以上。
(2)优良
?所含分部工程的质量全部合格,其中50%及以上为优良,结构和孔口防护分部工程必须优良。
ials and processing technology, basic knowledge such as Electrotechnics andMaster of mechanical drawing, engineering mechanics, mechanics, automotive mater)2(course score up to 60 points or more, ... 2. ...upational functions and skill requirements, students completing this course under the teaching plan, core double certificate ds occe:), and integrated into the Ministry of labor and social security all four car mechanic in the national occupational standarteaching plans according to Ministry of education high vocational designed professional directory prepared ( Professional codthis icles accident site exploration; (9) car manufacturing enterprise car performance detection and debugging; 2. get certificateevaluation, and detection equipment maintenance; (7) car transport enterprise car using management; (8) insurance company vehection and sales service integration Enterprise car accessories management; (6) car performance detection Enterprise car performance det-sales service integration enterprise technology management; (5) car maintenance enterprise or car sales and after-aftersales service integration enterprise business or production management; (4) Car maintenance enterprise or car sales and -maintenance business reception; (3) car maintenance enterprise or car sales and after6
?质量控制资料应完整;
?观感质量的评定得分率达到85%及以上。
directory prepared ( Professional code:), and integrated into the Ministry of labor and social security all four car mechanic nd debugging; 2. get certificate this teaching plans according to Ministry of education high vocational designed professionalion amanagement; (8) insurance company vehicles accident site exploration; (9) car manufacturing enterprise car performance detect erprise car performance detection and evaluation, and detection equipment maintenance; (7) car transport enterprise car usingsales service integration Enterprise car accessories management; (6) car performance detection Ent-sales service integration enterprise technology management; (5) car maintenance enterprise or car sales and after-intenance enterprise or car sales and aftersales service integration enterprise business or production management; (4) Car ma-maintenance business reception; (3) car maintenance enterprise or car sales and aftermechanics, mechanics, automotive materials and processing technology, basic knowledge such as Electrotechnics andMaster of mechanical drawing, engineering )2(eaching plan, core double certificate course score up to 60 points or more, ... 2. ...he national occupational standards occupational functions and skill requirements, students completing this course under the tin t7
房建工程施工中常见问题的处理
房建工程施工中常见问题的处理
一、因施工原因造成的问题
1、部门、专业间配合类
存在问题 1:女儿墙、沉厕管井侧墙、屋面天窗壁等,大多是在钢筋混凝土板上 为砌筑的砖或砌块墙体, 砌体和混凝土两种不同材料界面处易形成裂缝, 造成漏 水。
解决措施 :所有建筑要求做泛水处, 均采用现浇混凝土泛水, 泛水高度如建筑无 特定要求的,按 200mm 高。
存在问题 2:梁与板混凝土强度等级不同,施工不便。
解决措施 :同时浇筑的梁、板混凝土强度等级应一致。
存在问题 3:地下室后浇带要在至少 60d 后方可浇筑,但地下室外墙的防水及基 坑回填工程却需要先行施工,如何处理。
解决措施 :地下室外墙后浇带处, 在外侧设一通高预制钢筋混凝土板, 该板置于 地下室外墙防水层内侧, 建筑设计需考虑该处的防水做法, 结构设计需考虑该板 在后浇带尚未浇筑前用于拦挡回填土。
存在问题 4:有些墙垛的尺寸太小,不便于砌筑且质量不宜保证。
解决措施 :与混凝土墙、柱相连的墙垛尺寸≤120mm×120mm或某一边长小于 120mm 时,采用现浇混凝土墙垛。
2、解决现浇混凝土楼板裂缝类
存在问题 5:屋面板混凝土强度等级偏高,易产生裂缝而漏水。
解决措施 :屋面结构混凝土强度等级尽可能≤C25级。
存在问题 6:地下室底板混凝土强度等级偏高,易产生裂缝而漏水。
解决措施 :施工周期较长的大体积混凝土(如地下室底板、外墙等),设计时宜 考虑混凝土的后期强度,可采用不少于 60d 龄期的混凝土强度。
存在问题 7:地下室底板及侧墙后浇带新旧混凝土界面处易产生裂缝,经常出现 渗漏。
解决措施 :后浇带接缝处应做成企口; 主筋在后浇带处按断开处理; 采用膨胀止 水带。
存在问题 8:现浇混凝土板内预埋 PVC 电管时, 混凝土板经常沿管线出现裂缝。 解决措施 :钢筋混凝土板中预埋 PVC 等非金属管时, 沿管线贴板底 (板底主筋外 侧)放置 300mm 宽直径 1.0mm×10mm×10mm钢丝网片。
存在问题 9:现电梯间前室有大量设备管线暗埋在混凝土板内,造成结构隐患, 易出现裂缝。
解决措施 :预埋管线非常多的板(如高层建筑电梯前室等),板厚宜按结构设计 所需板厚 +30mm。
存在问题 10:屋面等有防水要求的混凝土板,对裂缝控制要求较严,如何控制 裂缝。
解决措施 :有防水要求的屋面板结构混凝土内添加抗裂纤维。 添加量由招标中心 或总承包提供中标产品参数,由设计单位确定。
3、防止首层地坪沉陷类
存在问题 11:首层隔墙自身发生沉降,墙身出现沉降裂缝。
解决措施 :首层隔墙下应设钢筋混凝土基础梁或基础, 不得直接将隔墙放置在建 筑地面上, 不得采用将原建筑地面中的混凝土垫层加厚 (元宝基础) 作为隔墙基 础的做法。
存在问题 12:室外踏步、花台等发生沉陷、变形。
解决措施 :建筑室外配件设计时,应考虑其地基及基础的设计。
存在问题 13:室首层地面回填土较厚,回填质量不易保证。
解决措施 :回填时,监理必须到位,加强质量控制及自检措施,在严格按照规范 要求进行回土填的前提下,根据实际工程情况,可采取以下加固措施:
(1) 当回填砂、石、砂等低粘聚力大粒径材料时,不另行加固。
(2) 当回填土厚<500mm>500mm>
(3) 当回填土厚 500mm≤且≤2000mm 时, 地面长跨小于 3000mm 的, 在建筑地面 做法的混凝土垫层底部放置直径 6mm @200mm 双向钢筋网片,网片应锚入或搁置 在周边结构上;地面短跨≥3000mm 的,除按上述要求增加钢筋网片外,在垫层 底部增设地垄墙,地垄墙与周边结构形成的网格边长不大于 3000mm 。地垄墙做 法由设计单位出具, 地垄墙材料宜采用砌体, 与上部的混凝土垫层的支承关系应 有保证。
(4) 回填土厚>2000mm 时,采用预制钢筋混凝土或现浇钢筋混凝土地面。 二、因设计原因造成问题
1、部门、专业间配合类
存在问题 14:有时隔墙、填充墙强度不好。
解决措施 :非承重墙的墙体材料强度等级在图纸中应予注明。
存在问题 15:钢结构、地基处理等需进行二次设计的由何方负责。
解决措施 :钢结构、 地基处理的二次深化设计由总承包负责完成, 设计单位必须 全力配合,保证工作的衔接。
2、消防设计
存在问题 16:消防车道没有 4m 宽、没有回车场或回车道、园林种树影响消防车 辆。
解决措施 :按照规范执行, 消防车道宽度执行规范, 消防车回车场如果上部做草 坪,下部构造设计必须符合消防车通行要求,园林总图应经建筑设计人员审核, 并报消防部门通过。
存在问题 17:电梯前室开窗面积不够 3m 2。
解决措施 :按照规范执行,不够 3m 2可加设加压送风井。
存在问题 18:各栋楼之间防火间距不够。
解决措施 :按照规范执行。
存在问题 19:楼梯间首层与地下室没有隔开。
解决措施 :按照规范执行。
存在问题 20:发电机和消防水泵不在第一期,拖延第一期验收时间。
解决措施 :在一期应考虑完善配套, 裙楼不装修、 暂时不使用也应先设计消防系 统,待施工完成后方可验收。
存在问题 21:消防水泵房没有直通安全出口。
解决措施 :按规范执行。
三、设计通病与措施
1、屋面防水
存在问题 22:广州地区 911防水材料质量不稳定
解决措施:
1) 选用防水卷材 , 根据国家规范确定厚度。
2) 北方地区的别墅,按二级防水等级做两道卷材防水。
存在问题 23:保温隔热层隔热层设置位置不明确。
解决措施:
1)采用挤塑聚苯板保温材料。
2)北方地区先做保温,后做防水,南方先做防水,后做保温。
存在问题 24:天面女儿墙底裂缝渗漏。
解决措施 :300mm 以下做混凝土女儿墙。
存在问题 25:凸出屋面的管道、井、烟道周边渗漏。
解决措施 :凸出屋面的管道、 井、 烟道周边应同屋面结构一起整浇一道钢筋混凝 土防水反梁,平屋面标高定于最高完成面以上 250mm ,坡屋面为完成面 250mm 。
存在问题 26:管道穿越楼板、屋面处渗漏
解决措施 :按规定选用和埋设套管;套管处要用沥青麻丝和防水油膏充填。
存在问题 27:屋面西班牙瓦的施工方法设计有 2种做法,一种为挂贴;一种为 卧贴。但按挂贴施工的别墅屋面大部分有渗水现象。
解决措施 :改为卧贴工艺。 如确实因屋面坡度太陡时, 卧贴工艺中应增加挂网等 加强措施,或将卷材防水层加厚(30mm 以上)再采用挂贴工艺施工。具体做法 均以各公司地区规范为主。
存在问题 28:别墅部分户型设计有暗天沟, 但由于设计时此处未采取加强措施, 许多屋面出现暗天沟漏水现象。
解决措施 :统一改为明沟。
2、室内防水
存在问题 29:沉箱式卫生间无侧排地漏, 使得沉箱内容易积水而形成渗水隐患。 而准备补加侧排地漏时,又由于管井面积不够,无法增加立管。
解决措施 :加侧排地漏,北方地区因安装困难可适当加大管井。
存在问题 30:沉箱管道井防水套管安装,卫生间设置管道井时,管道井壁(沉 箱内部分)厚往往只有 8~10cm混凝土墙或者采用砌砖,无法较好地安装防水套 管。
解决措施 :建议沉箱管道井壁厚 12cm , 并且应为钢沪宁图结构, 沉箱内部架空, 不回填。
存在问题 31:浴室墙面渗漏。
解决措施 :柔性防水上返 300mm 高, 以上部份做防水砂浆。 北京地区墙根部混凝 土上返 120mm 。
存在问题 32:安装卫生间设备时无法固定且易渗漏。
解决措施 :卫生间墙体建议全部采用实心砖。
存在问题 33:室内给水管被打穿。
解决措施 :水暖管道尽量避开门口经过,而从门侧穿墙过,剪力墙预留套管。 3、外墙防水
存在问题 34:外墙裂缝渗漏。
解决措施 :外墙是涂料的掺抗裂纤维水泥砂浆。
存在问题 35:墙体材料。
解决措施 :同意广州试用加气蒸压混凝土砌块,但应增加相应的抗裂措施 (如 内外墙批荡挂网,抹灰层加抗裂纤维)。
存在问题 36:窗楣、窗台处漏水
解决措施 :窗楣要做滴水线;外窗台要低于内窗台,做足排水坡度;铝合金窗下 框要有泻水结构;铝合金窗外边要打防水胶密封。严格执行施工规范。
存在问题 37:GRC 外装饰构件多, 而部分外墙 GRC 线脚上没有设计挑檐, 容易造 成 GRC 构件与外墙交接处出现渗漏水现象, 而且 GRC 构件之间的连接也极易产生 裂缝。
解决措施 :
1)尽量减少使用 GRC ,并减少 GRC 线条的样式。
2)选定供应商后,及时将安装节点提供给设计单位。待设计确认
后方可安装。
3)设计院在图纸中要对装饰线条的排水坡度、滴水槽及不同材料
搭接的防裂措施有所标注。
4)设计部定板中要考虑线条泛水、渗水的问题。
5)工程部要认真审核装饰线条的施工方案。
地下室防水
存在问题 38:防水材料质量不过关。
解决措施 :采用卷材防水,防水等级及设计执行国家规范。
四、建筑节点通病及解决措施
1、门窗与栏杆部分
存在问题 39:出天面门采用木门,规范不允许。
解决措施 :出天面门禁用木门。
存在问题 40:由于甲方考虑成本因素,准备取消一些楼盘的门窗钢附框,但取 消钢附框后,会导致结构完成后门窗洞口无法及时收口,对工程进度影响极大, 而且也极易造成铝框的污染、破坏。
解决措施 :总承包核算费用后,报总部审批。
存在问题 41:当电梯在首层,秋冬季风力很大时,电梯厅门关不到位,需要外 力才能关上;设计时应考虑大堂电梯避风,电梯门开关自如。
解决措施 :同意,采用其做法。
存在问题 42:栏杆,铁艺、铁花、防护栏杆大样不齐不能做为施工依据。 解决措施 :
1) 由韩建提铁艺铁花大样图库资料供,设计人员选择。
2) 设计公司设计大样图。
存在问题 43:栏杆高度小于 1100mm 。
解决措施 :按规范执行。
存在问题 44:阳台栏杆的预埋件在主体施工时因没有栏杆的立杆间距而无法预 留,在安装时又不允许打膨胀 l 螺栓,造成要打掉结构。
解决措施 :设计确定间距及大样图。
存在问题 45:阳台镀锌钢管油漆脱落、生锈。
解决措施 :设计必须明确相匹配的油漆 (瓷漆 ) 。
存在问题 46:室内飘窗台护窗栏杆的设置问题。
解决措施 :由标准化设计小组统一制定标准图。
存在问题 47:根据住宅设计规范:外窗窗台距楼面、地面的净高低于 0.8m 时, 应设有防护设施,所有窗台高度低于 0.8m 的开启窗,应设置安全护栏。现管辖 小区,飘窗内的护栏高度偏低,儿童易撞碎玻璃摔下,建议增高护栏高度。 解决措施:按规范执行。
存在问题 48:天台、平台各户型之间设有防护栏杆,防止外来人员穿过确保安 全;由于窗户推拉门不能封闭,也没有防盗装置,多个楼盘均出现,从业主家平 台推拉窗处进入室内,造成失盗的事件。
解决措施 :同意,设计中充分考虑。
存在问题 49:小区的景观水池边, 应增设防护栏, 以防儿童及老人滑倒摔下。 解决措施 :不采用其做法。
存在问题 50:走道管井门面贴磁砖。
解决措施 :由装饰专业出大样,确定颜色。
存在问题 51:室内木质柜与墙体接合处理不当。
解决措施 :由装修处理。
存在问题 52:卫生间、厨房墙面地砖的规格太大,易空鼓、损耗大。
解决措施 :建议墙砖不宜太大,应不大于 500mm×500mm,且不用玻化砖。
存在问题 53:墙面地面砖采用斜贴 , 损耗大。
解决措施 :在交楼标准中,明确尽量不使用斜贴。
存在问题 54:橱柜验收不合格,导致煤气工程验收不合格。
解决措施 :执行规范。 设计和施工时在煤气软管和煤气表放置的封闭空间预留透 气孔,安装透气板。
存在问题 55:电梯的门坎应高于地面,门坎与地面应有一个合理的坡度,防止 水倒灌入电梯井内,影响电梯的运行。
解决措施 :同意,采用其做法。
2、屋面工程
存在问题 56:斜屋面坡度太大。
解决措施 :在不影响设计效果的情况下,尽量减缓坡度。
存在问题 57:单体采暖预留管道:由于楼板厚度限制,使得预留采暖管道高出 混凝土保护层管道交叉处,高度超高,不得不剔楼板。
解决措施 :采暖管道留槽走明管。
存在问题 58:是否采用混凝土品牌成品集水系统。
解决措施 :结合立面局部使用。
存在问题 59:施工单位经常提出屋面找坡材料的变更要求。
解决措施 :由韩建提出几种材料做法,由设计公司选定。
3、抹灰工程
存在问题 60:多联排别墅露台分户墙因雨水和灰尘的影响形成‘’泪痕”。 解决措施 :设计要增设滴水线。
存在问题 61:我司地下室顶棚的设计做法基本是选用 88J1-1图集的棚 61做法, 在保温板上直接刮 2mm 耐水腻子, 很容易产生质量隐患 (仅限北京地区使用) 。 解决措施 :需设网格布, 新建工程室内地下保温顶棚做法:参照 88J2-9, 棚 26-W 。
存在问题 62:室内顶棚做法一般都选用 88J1-1图集的棚 8B 、棚 9B 做法,为 水泥石灰砂浆抹灰,这种做法现在很少用,很容易产生质量和安全事故。 解决措施 :采用刮腻子抹平,取消抹灰做法。
存在问题 63:外墙石材铺贴的构造做法是否结合北方地区的保温做法。
解决措施 :同意。
存在问题 64:已交付使用水泵设备房的地面、地面均为水泥毛坏墙面、地面。 应按卫生防疫站核发二次供水卫生许可证的标准设计 (应将墙面、 地面、 排水沟 内铺设墙、地砖),避免再次进行设备房的改造时,影响正常供水,并污染水泵 房设施。
解决措施 :同意,采用其做法。
4、墙体工程
存在问题 65:有些地下室的隔墙也设计为轻质隔墙板, 但由于地下室的层高 (特 别是地下 1层)都较高,均大于 3.3m ,而轻质隔墙板的高度不能超过 3.3m ,否 则会造成裂缝甚至断裂的危险。
解决措施:建议地下室隔墙考虑改为砌块。
存在问题 66:有的剪力墙门垛设计过小,造成门套无法安装。
解决措施 :以后的门垛应不少于 10cm (但应保证结构需要的尺寸)。
存在问题 67:剪力墙与窗侧边的距离太小,但是图纸仍然设计砌体结构,增加 施工难度,又容易产生裂缝。
解决措施 :参见结构篇 1.1.4条。
存在问题 68:GRC 轻质隔墙板裂缝。
解决措施 :除板缝铺设玻纤网格布加强外,还需满铺玻纤网格布。
存在问题 69:电气预埋图纸尺寸应尽量留余量,如配电箱等,由于有时招标时 间较土建进度滞后, 如不综合考虑各厂家设备尺寸提供相应预留尺寸, 将造成浪 费。
解决措施 :同意。
5、楼地面结构
存在问题 70:非沉箱卫生间的降板原来均为 3cm , 使得卫生间内外高差不足, 造 成卫生间地面找坡很难施工, 特别是门口处, 很容易与外地面平甚至高于外地面, 如果要保证有高差,又容易造成坡度不够,产生积水。
解决措施 :地漏旁边楼板可再降低,具体在结构图中加以标注。
存在问题 71:单体采暖预留管道:由于楼板厚度限制,使得预留采暖管道高出 混凝土保护层管道交叉处,高度超高,不得不剔楼板。
解决措施 :采暖管道留槽走明管,并且给行销部一个合理的解释。
6
综合类
存在问题 72:住宅厅房应考虑各室的空调机位,便于室外机的安装、维修、机 座应考虑容积宽阔,大功率室外机也可以安装。室内机和室外机平台相距过远, 避免室外连接管路过长,影响楼宇的外立面美观。
解决措施 :同意,设计中充分考虑。
存在问题 73:烟道设计时,应考虑厨房内管线的避让;现管理 的楼盘有管路 在烟道的出风口处通过,造成无法安装排风管。如:帝景、骏中区的户型均有此 现象。
解决措施 :同意,设计中充分考虑。
存在问题 74:别墅平台、平台应预留太阳能热水器的机位。现管理小区的业主 自装太阳能热水器具越来越多, 也符合国家节能趋势, 为便于管理, 建议设计时 考虑机位统一放置。
解决措施 :不采用其做法。
存在问题 75:设备设备房应预留承重钩(如:水泵房、消防泵房、采暖机房、 锅炉房、 电梯机房等设备的天花内预埋挂钩) , 便于重型的机械设备拆装维修。 解决措施 :同意, 采用其做法。 由设备专业提供土建设计条件, 由结构专业出图。
存在问题 76:各楼栋大堂玻璃门采用对角装饰夹 , 配廉价地弹簧,不适合北京地 区风大的使用环境,被损率达到 60%,应采用类似麦当劳大门设计方案,既带框 玻璃门配优质的闭门器。
解决措施 :同意,采用其做法。
存在问题 77:配电室现安置在地下室,地面应高于楼道的地面或在室内门口制 作防水台阶。
解决措施 :同意,采用其做法。
存在问题 78:空调孔板设计不详。
解决措施 :
1)客厅出阳台空调孔与阳台水落管冲突,必须孔边距墙边 200mm 。
2)空调出阳台出墙或空调出厨房后阳台,各距 墙边 100mm ,转弯半径不够。
3)客厅空调板宽 1000mm ,应为≥1100mm。
存在问题 79:燃气热水器设计不详。
解决措施 :
1)挂热水器部位 800mm 宽墙均应实墙砌筑。
2)阳台安装燃气热水器时一下要挂热水器的实墙 600mm 宽。
存在问题 80:家具布置
1)每一个房间均需布置(工人房、杂物房经常漏画)。
2)厨房灶台及洗菜盆,排烟井布置随意。
解决措施 :设计充分考虑。
存在问题 81:预留孔洞不全。
解决措施 :
1)建筑图标明楼梯间正压送风口。
2)强、弱电箱预留孔必须标出。
3)各种排水管,雨水管必须标出。
4)燃气热水器直排孔必须标出。
存在问题 82:复式有退台时,则复式下层室内层高不定。
解决措施 :复式有退台时,则复式下层室内层高应为 3.2m 。
存在问题 83:飘窗台 100mm 厚侧墙应为混凝土墙,图示应深黑。
解决措施 :同意。
存在问题 84:转换层
1)卫生间沉箱易出问题,转换梁偏出卫生间墙。
2)各种下水管与转换梁冲突。
3)有室外露台时,需考虑解决室内高差问题。
解决措施 :设计充分考虑。
存在问题 85:小区园林道路由于路牙与路面平齐,且绿地高于路面,很容易被 绿化用水污染路面。建议设计时提高路牙。
解决措施 :同意,采用其做法。
存在问题 86:地下车库的电梯大堂要与首层大堂一起进行装修设计,车库与地 下大堂应整洁,明亮,与小区整体的档次相合。
解决措施 :同意,采用其做法。
存在问题 87:车库的坡道长、面积大、拦水沟少;雨季来临时,易造成雨水涌 入车库。
解决措施 :设计考虑增加拦水沟或阳光棚。
存在问题 88::地下工程的防水问题经常容易被忽略,地下工程的防水根据地下 水位的高低来决定做法。
引申到电缆地沟也常忘记做防水,对于地下水高的地区光做内防水还不行。 防腐工程对水也很敏感,不做防水,防腐的面层与基底黏结就不好,容易脱落。
存在问题 89:建筑的水沟虽然小,但也不能容忽视。关于水沟的盖板也不是随 便就选的,要根据荷载来决定,以往工程遇到过,选用的普通盖板,最后上卡车 的情况, 这时候就要选能承重的重型盖板, 而且盖板下要埋设角钢加强, 过路的 地沟要加钢筋加强。
存在问题 90:配电室门一般至少要有一个进配电柜的大点的门,电气专业提的 要求一般不小于 1.2m 宽 x2.4m 高,建议作 1.5mx2.7m 的门,门上作上亮,上亮 下的中梃要求厂家做成可拆卸型, 这样在头次安装和以后的维修中需要进出配电 柜时, 就将中挺取下, 平常走人则用下面的 2.1高门即可。 尽量不做 2.4m 高门, 一方面有时不满足安装要求, 因除去门框后净高未必够, 另一方面如为安装柜子 做成通高 2.4m 的门扇,尤其是钢门则很沉重,开启不方便,门轴处也易坏。有 时电气专业忘记提门高条件,还需根据经验及时确认,避免安装时出问题。 配电室一般长度超过 7m 要设两个疏散门,超过 60m 还宜增加一个出口;高压配 电室宜设窗台高度不低于 1.8m 的固定窗,低压配电室宜设配砂扇的开启窗,不 能一律开成普通窗。
存在问题 91:配电及有危险的化验室的门要求外开。
存在问题 92:室外的电缆沟要加集水井,同时沟要向集水井找坡。
存在问题 93:配电,在有危险的(比空气重,有爆炸危险气体凝聚的可能)室 内外高差要大于等于 600mm 。
对水暖工程施工中常见问题论文
对水暖工程施工中常见问题的探讨
【摘要】水暖工程包括系统比较多,施工工艺也比较复杂,在 施工中容易一些问题,如图纸问题、材料问题、进度问题等,解决 这些问题,首先要在施工前做好准备,编制好计划,其次要在施工 过程动态地监督每一道工序,做好每天的资料记录,以便及时发现 问题,付诸整改。
【关键词】水暖工程;问题;措施
引言
水暖工程包括了给排水工程和采暖通风工程,属于一个单项建筑 工程的水暖分部, 它包括的系统比较多, 所涉及的工序也比较繁杂。 水暖工程的施工,几乎触及到建筑物的每一个角落,众多的管道安 装在墙壁、管井和吊顶内,如果工程在实施过程中疏忽大意,不进 行全程监控, 将会影响后来的装修工序, 甚至会在工程交付使用后, 造成建筑物的“跑、冒、漏、滴”现象,影响整个工程的质量,损 害建筑公司的形象。
1 工程施工中的常见问题
水暖工程施工涉及到图纸、队伍、材料、资金、进度、工具、成 本等众多元素,需要有一个全面综合地掌控,方能将水暖工程实施 得又好又快,稍有不慎,一个环节处理不好,不是造成工程的质量 问题,就是会延误工期,施工公司经济上受损失。
1.1 图纸问题。图纸是水暖工程施工的指路明灯,没有它,施工 就无从谈起。但是并不是所有图纸都没有问题,有时设计人员的设
园林绿化工程施工中常见问题
园林绿化工程施工中常见问题及对策建议
摘要:园林绿化工程的施工,其过程不但需要较强的专业性和技术性的支撑,还需要确保施工工程艺术特点的完美体现。本文分析了当前园林绿化工程施工存在的质量问题,并结合实例探讨了具体的质量控制措施。
【关键词】园林绿化; 施工; 质量
【前言】
近些年来社会的发展进步使得人们对生活的环境质量要求有所提高,对园林绿化的要求由之前单方面美化环境向着保护环境、净化环境保持生态平衡实现人与自然和谐共处进行转变。园林绿化的这些转变也使得其对建设质量和水平的要求不断提高。园林绿化的施工贯穿园林建设的整个过程,一个好的园林绿化施工单位需要将工程质量管理放在首要的位置。
1、当前园林绿化工程施工存在的质量问题
园林绿化施工是一项包含了景观、土木建筑、给排水及绿化等多项工程的施工内容,因而具有极强的季节性,工期紧、交叉作业多以及门类复杂,都增加了施工作业的难度。过大的施工难度加上工期紧张, 一些施工部门在工序交替时为了完成施工作业而忽视相关细节,进而导致园林绿化工程质量控制难以把控。
1.1、土木建筑与绿化在交叉施工中易产生的问题
在遇到赶工期等特殊情况时, 土建及绿化施工或需同时进行。此时,在砌筑路边石头等施工环节中极易出现问题。例如,由于路边
石材质大多都是混凝土或石材,施工中工人往往需要用混凝土稳固其内部接缝。除此之外,在砌筑路边石过程中,还应根据其周围排水坡坡度、位置等因素提前对导水假接缝进行设置,从而充分体现路边石引导雨水的功能。
1.2、种植树木过程中容易出现的问题
1.2.1.对于刚引进的苗木需及时栽种, 基肥及碎土都需依照园林施工标准进行均匀搅拌。
1.2.2.栽种前需将苗木部分侧枝进行修剪,在种植过程中要注意幼芽的保护。技术处理完毕后,将苗木栽种入土,适时浇水,并根据不同树木各自的生长情况进行培育及补水。
1.3、养护问题
施工过程中,由于养护工作更为费时,养护周期通常都超过一年,而成效并不明显,种种原因致使施工企业养护工作做得并不到位。加上养护人员投入严重不足,养护技术更是有待提高。因而,重施工而轻养护成为园林绿化工程质量控制的又一难题。
1.4、原材料质量问题
目前我国园林绿化工程项目往往追求价廉物美,低价中标则成为工程采用的主要手段。施工企业为更大程度的增加利润以谋求自身生存及发展,不得不在施工中严格控制成本,甚至某些企业通过偷工减料, 使用次品原料等卑劣手段以求降低苗木栽植规格,或使用质量不达标的草坪,此时工程质量往往难以得到保障。
2、实例分析
该工程位于某市高档科技创业园,对该项目的景观绿化进行深化设计及施工。施工中我司主要把握几个关键点,对工程质量进行了有效控制。
2.1、园林绿化工程的前期管理
在进行园林绿化施工之前需要做好前期的准备工作,具体来说,主要包括3 大方面:第一,要做到因地制宜,注重绿化选材。在选材方面要注重与当地的气候、环境相适应,同时也要强调植物的生长性、功能性。例如,法国梧桐易栽植成活,广玉兰、无患子可以吸收有害气体和防尘等。第二,做好工程设计工作。城市园林绿化的主要目的是为了美化城市环境、净化城市空气。通过花草与乔灌木之间的合理搭配,可以形成疏密有致、高低错落的生态植物群落景观。而植物成景需要园林企业在施工前首先做好工程设计工作,将园林设想通过图纸传达出来,并通过图纸讨论和会审,将不符合实际要求的设计部分加以改正,从而保证园林绿化工程施工的整体质量。第三,优化施工队伍配置。园林建设涉及面广、覆盖范围大,需要更多高素质的施工人才,因此,在园林绿化工程施工之前,就需要进行施工队伍优化,更需要针对员工知识和技能薄弱点进行培训,从而提升各工种、各部门员工的专业修养,从而提升工作效率。
2.2、栽植土
由于施工单位在施工前所进土方土质本身偏差,园内种植地区存在垃圾土多、砖石多、含盐量大、土层深浅不一、土表高低不均、排水情况差、土块大小不一等情况,将会影响苗木成形的质量。为此,
施工单位负责在进土前现场踏勘时采样分析其土层分布及土质情况,对种植层土壤必须进行测试,对于不符合种植土壤要求的砖石、垃圾必须清除,检测未达规定要求时,应对土壤进行改良,改良后重新检测直至达到规定要求。我司项目部在踏勘本工程施工现场时,建筑结构和外立面装饰、构筑物等已由总承包单位完成,考虑到本工程现场施工作业面临建四周通道范围内是地下架空层,为减少堆土时机械设备对地下架空层的冲击力,项目部决定选用小型挖机进行集中堆土,并在进行挖土和堆筑土方作业前,对小型挖机进行全面检查。本工程土石方施工主要包括人工湖的挖土和绿化地形的堆土造型。
2.3、绿化苗木
工程原设计图纸中涉及红豆树,而红豆树在我国属于国家?级重点保护野生植物,被列为国家三级保护(濒危)树种。为了更符合本地的种植情况,我司与建设单位、总体规划设计单位进行图纸会审,讨论后决定取消原设计的红豆树,并由我司对该项目的绿化种植图进行深化设计,调整植物品种。深化图纸过程中我们做了大量工作,找出原设计中不合理之处,遇到问题“早提出、早解决”。我们在深化设计中运用中国古典园林元素,包括大规格的金弹子盆景、银杏盆景、石榴桩、竹子点缀其中。
由于本工程属于高档科技创业园,对苗木质量的要求较高,我们提议按照本工程苗木清单,在采购苗木前从合格供应商的苗木基地中挑选树形优美的苗木拍摄照片,苗木照片经建设单位、设计单位共同确认后再采购。其中涉及的大规格乔木更协同建设单位前往苗木基地
确认,在树干上做好标记。由于我项目部在种植施工前对苗木质量进行了预控,施工后使绿化设计效果得到了充分体现。
2.4、绿化苗木栽植
工程中由于我司与总承包单位的土建工程交叉进行施工,虽有施工组织设计,但施工现场情况多变,绿化种植方案是一改再改。在园区北面建筑高墙边种植哺鸡竹时,适逢夏季7月份高温,为了保证苗木成活率,我司在施工中采取了相应的技术措施,哺鸡竹种植前进行土壤深翻,在种植过程中指导施工人员将营养土和种植土搅拌均匀,在少量修剪的情况下,尽量满足哺鸡竹的生长要求。因当时施工时的有效把控,哺鸡竹种植成活率高达98%以上,为科技创业园增添了本土特色,建设方看到种植后的效果也相当满意。
2.5、园林绿化工程竣工后验收及养护管理
在园林绿化工程竣工以后,需要对该工程的质量进行相应的预检和复检工作,其中,预检主要是指单位内部的自我检验,主要为正式验收做好准备工作,具体可以根据该工程的重要程度和验收标准分层进行,如果出现不符合要求或者缺漏的部分,则需要指定专人进行整改。在整改完毕以后需要报请承包企业或上级单位进行复验,待确认全部符合工程标准以后向监理单位及建设单位发送《竣工验收通知书》,然后进行正式验收。在园林日常养护工作方面也需要确保工作质量,具体来说,主要需注意3 方面工作:第一,制定园林绿化管养规范,并按照专业技术要求进行日常养护;第二,维护和完善好绿化供水设施,以确保浇灌系统正常运行;第三,加强合理的安全警示牌
和导游指示牌,完善服务配套设施。
【结论】
综上所述,加强园林绿化工程施工的质量控制具有十分重要的意义,不仅能提高园林绿化工程施工的质量,满足人们对生活环境的需求,增加绿化企业的经济效益,更能促进园林绿化的和谐发展与可持续发展。
【参考文献】
[1]吴成余;王兴;王平;浅析园林绿化工程的施工质量管理[J];项目管理技术; 2009 年S1 期.
[3]叶云明;浅谈园林绿化工程的施工质量管理对策[J];中国建设信息; 2009 年12 期.
钢筋工程施工中常见问题
钢筋工程施工中常见问题
1、钢筋的等级,间距,直径,数量是否符合图纸要求
2、柱子核心区的箍筋是否加密
3、柱子纵筋的接头百分率是否满足要求
4、柱子非连接区及搭接连接区域是否箍筋加密
5、柱子非连接区的长度
6、柱子纵筋的搭接长度是否满足
7、柱子纵筋是否有移位严重的情况
8、梁的负筋是否漏设,主筋是否与图纸相符,负筋长度是否满足要求
9、梁两端的箍筋加密长度是否满足要求
10、梁的腹板高度不小于450mm时,是否设置构造筋,构造筋的搭接和锚固长度都为15d
11、当梁标注有抗扭钢筋时,扭筋的搭接长度为lle,锚固长度为lae
12、梁箍筋是否垂直主筋且和主筋绑扎牢靠
13、梁两端的主筋的锚固长度是否满足要求
14、梁腰筋拉钩间距是否为箍筋非加密间距的两倍
15、拉钩及箍筋的弯钩平直段长度是否为Max(75mm,10d)
16、主次梁交接处,主梁两侧是否有3根附加箍筋
17、板下部钢筋及上部钢筋间距是否符合图纸要求
18、板上部钢筋为分离式时,分布筋的间距是否满足图纸要求
19、板上部钢筋的位置、直径、间距、长度是否正确
20、板下部钢筋是否锚固在梁中,锚固长度是否满足要求
21、墙体竖向筋与水平筋的钢筋等级、间距、直径是否正确
22、墙体水平筋在端柱与暗柱内的锚固长度是否满足要求
23、墙体竖向筋的搭接长度是否满足要求
24、墙体水平筋拉钩的直径、间距是否正确
25、墙体转角墙外侧水平筋见11G101-1图集做法
26、浇筑混凝土前墙体的竖向钢筋是否固定
转载请注明出处范文大全网 » 人防工程施工中常见问题